2018-12-06 09:15:291) THE GENERATOR SPECIFICATIONS NOTE THAT THE GENERATOR
 OFFERS A UL 2200 LISTING. SUBMIT A COPY OF THE
 CERTIFICATE OF COMPLIANCE SHOWING THE UL 2200 LISTING.
 2017 FBC-MECH. SEC.915.
 2) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37
 PER 2017 FBC-MECH. SEC. 915. I COULD NOT FIND THIS
 INFORMATION IN THE SPECIFICATIONS.
 3) THE FUEL TANK INSTALLATION SHALL BE APPROVED BY THE
 PALM BEACH COUNTY OFFICE OF ENVIRONMENTAL RESOURCE
 MANAGEMENT PER PALM BEACH COUNTY ORDINANCE 2015-008.
 SUBMIT DOCUMENTATION FROM ERM THAT THIS INSTALLATION
 HAS BEEN APPROVED.
 4) THE SUBMITTED PLANS SHALL BEAR THE SIGNATURE AND
 SEAL OF THE DESIGN PROFESSIONAL OF RECORD IN ACCORDANCE
 WITH THE FL. ADMIN. CODE RULE 61G15-23.001.
 5) SUBMIT SAFETY DATA SHEETS FOR THE FUEL OIL TO BE
 USED. WPB AMEND. TO FBC SEC. 107.2.1.
 6) INDICATE THE CLASS OF THE FUEL ON THE PLANS IN
 ACCORDANCE WITH NFPA 30 SEC. 4.3.
 7) SPILL CONTROL, CONTAINMENT AND DRAINAGE MAY BE
 REQUIRED FOR THE FUEL TANK DEPENDING ON THE CLASS OF
 LIQUID OF THE FUEL. NFPA 30 SEC. 9.13.
 8) IN ADDITION TO THE TANK PLANS THAT HAVE BEEN
 SUBMITTED, SUPPLY ANY ADDITIONAL MANUFACTURER'S
 SPECIFICATIONS FOR THE FUEL TANK.WPB AMEND. TO FBC SEC.
 107.2.1.
 9) THE SUBMITTED TANK PLANS NOTE THE TANK AS 660
 GALLONS BUT THE PLANS NOTE THE TANK AS 600 GALLONS.
 CLARIFY.
 10) THE FUEL TANK VENTS SHALL BE 5 FEET FROM BUILDING
 OPENINGS AND 15 FEET FROM POWERED VENTILATION AIR
 INTAKES PER NFPA 30-12 SEC.19.5.3.2.
 11) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF
 NFPA 704, OR ANOTHER APPROVED SYSTEM, SHALL BE APPLIED
 TO STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30
 SEC.21.7.2.1.
 12) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL
 TANK PER NFPA 30 SEC.22.7.
 13) SHOW ON THE PLAN HOW THE VENT PIPES FROM THE FUEL
 TANK WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS
 OF THE STRUCTURE.
 14) THE FILL PORT FOR THE FUEL TANK SHALL BE PROVIDED
 ON AN EXTERIOR WALL OF THE ROOM OR STRUCTURE ENCLOSING
 THE TANK AT A POINT AT LEAST 24 INCHES FROM ANY
 BUILDING OPENING AT THE SAME OR LOWER LEVEL PER NFPA
 37-15 SEC. 6.6.3.3. SHOW THE LOCATION OF THE FILL PORT
 ON THE PLANS.
 15) THE FUEL TANK SHALL BE LOCATED IN A ROOM WITH A
 FIRE- RESISTANCE RATING OF NOT LESS THAN 2 HOURS. WHERE
 THE BUILDING IS PROTECTED THROUGHOUT WITH AN AUTOMATIC
 SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH SECTION
 903.3.1.1 OR 903.1.2 , THE REQUIERED FIRE-RESISTANCE
 RATING SHALL BE REDUCED TO ONE HOUR. 2017 FBC-BUILDING
 SEC.403.4.8.2.
 16) THE PLANS SHOW THE FUEL TANK LOCATED IN A SEPARATE
 ROOM THAT IS NOT SHOWN ON THE ORIGINAL PLANS. A
 REVISION SHALL BE SUBMITTED SHOWING THE FIRE RATING OF
 THE ROOM AND DOORS IN WHICH THE FUEL TANK IS LOCATED.
 WPB AMEND. TO FBC SEC. 107.2.1.
 17) A PLUMBING REVISION SHALL BE SUBMITTED FOR SHT. P
 5.01 AS THE FUEL PIPING WAS NOT SHOWN ON THE ORIGINAL
 PLANS.
 18) SUBMIT COMPLETE MANUFACTURER'S SPECIFICATIONS FOR
 THE PRYCO FUEL DELIVERY CONTROL STATION FOR REVIEW. WPB
 AMEND. TO FBC SEC. 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved