| 2018-12-26 10:44:12 | PLAN REVIEW COMMENTS |
| | |
| | 1) THE ELECTRICAL PLAN SHEET E1.0 THAT IS LISTED IN THE |
| | TABLE OF CONTENTS ON SHEET P1.0 WAS NOT UPLOADED. WITH |
| | THIS SUBMITTAL. FBC 107.2.1 |
| | 2) STRUCTURAL FOAM FILL IS SHOWN ON SHEET P2.2 BELOW |
| | THE POOL. IT APPEARS THAT THIS FOAM WILL BE SUPPORTING |
| | THE POOL. SUBMIT THE PRODUCT SPECIFICATIONS FOR THIS |
| | FOAM WITH SIGNED AND SEALED ENGINEERED CALCULATIONS TO |
| | SHOW THAT THE STRUCTURAL FOAM WILL SUPPORT THE FILLED |
| | POOL. FBC 107.2.1.2 NOTE: FOAM IN TYPE I AND II |
| | BUILDINGS IS REQUIRED TO BE ENCASED IN CONCRETE. FBC |
| | 603.1. |
| | 3) SHT. P2.1 - THE EQUALIZER IS SHOWN AS 2 INCH AND |
| | ALSO AS 4 INCH. CLARIFY. |
| | 4) THE PLANS SHALL BE DIGITALLY SIGNED AND SEALED PER |
| | FL. ADMIN. CODE RULE 61G15-23.003, |
| | 5) A VAPOR RETARDANT COVER ON OR AT THE WATER SURFACE |
| | OR A LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT |
| | LOSS SHALL BE PROVIDED PER THE 2017 FBC-ENERGY SEC. |
| | C404.9.3. |
| | 6) THE EQUIPMENT ROOM SHALL HAVE EITHER FORCED DRAFT OR |
| | CROSS VENTILATION PER 2017 FBC SEC. 4541.5.4. PROVIDE |
| | DDETAILS. |
| | 7) SHT. P2.2 - SHOW THE SIZE AND TERMINATION POINT OF |
| | THE CONDENSATE DRAINS. |
| | 8) SHT. P2.3 - TYPICAL MAIN DRAIN DETAILS CALLS OUT 3 |
| | MAIN DRAINS BUT SHT. P2.1 SHOWS 4. CLARIFY. |
| | 9) SHT.P2.0 - POOL MATERIALS & EQUIPMENT |
| | LIST/PLUMBING/EQUIPMENT ROOM REFERS TO SHT. P4.0 FOR |
| | COMPLETE SPECS. THERE IS NO SHT. P4.0 IN THIS |
| | SUBMITTAL. CLARIFY. |
| | 10) A REDUCED PRESSURE ZONE BACKFLOW PREVENTER IS |
| | REQUIRED ON THE WATER SUPPLY TO THE COLLECTOR TANK PER |
| | CITY OF WEST PALM BEACH CROSS CONNECTION CONTROL |
| | MANUAL. |
| | 11) THE OPERABLE PARTS OF THE RINSE SHOWER SHALL |
| | CCOMPLY WITH THE 2017 FBC-ACCESS. SEC.309. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |