| Date |
Text |
| 2018-11-02 10:29:27 | 1) THE SUBMITTED GAS PLAN NOTES AN EXISTING GAS METER. |
| | CITY RECORDS DO NOT SHOW ANY PREVIOUS PERMITS FOR GAS |
| | INSTALLATION AT THIS ADDRESS.THE EXISTING SYSTEM WILL |
| | HAVE TO BE PERMITTED.FBC 105.1. |
| | 2) THE PLANS INDICATE AN EXISTING GAS METER AND CITY |
| | RECORDS DO NOT SHOW AN EXISTING GAS SYSTEM FOR THIS |
| | ADDRESS. THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST |
| | BE ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO |
| | ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. IF |
| | UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| | ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING |
| | RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| | APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| | SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, |
| | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3. |
| | 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR ) TO THE MOST REMOTE OUTLET IN THE |
| | BUILDING AND / OR SYSTEM PER THE 2017 FBC-FUEL GAS |
| | SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. SEC. G 2413.4.1, |
| | G2413.4.2. |
| | 4) THE GENERATOR SHALL BE LOCATED A MINIMUM OF 10 FT. |
| | FROM BUILDING OPENINGS OR IN ACCORDANCE WITH THE |
| | MANUFACTURER'S INSTALLATION MANUAL. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |