| Date |
Text |
| 2019-03-26 14:39:44 | PLUMBING 3RD REVIEW**DENIED** |
| | |
| | WITH RESPECT TO EVALUATION OF DESIGN PROFESSIONALS & |
| | DOCUMENTS, IF A LOCAL GOVERNMENT FINDS IT NECESSARY, IN |
| | ORDER TO ENFORCE COMPLIANCE WITH THE FLORIDA BUILDING |
| | CODE AND ISSUE A PERMIT, TO REJECT DESIGN DOCUMENTS |
| | REQUIRED BY THE CODE THREE OR MORE TIMES FOR FAILURE TO |
| | CORRECT A CODE VIOLATION SPECIFICALLY AND CONTINUOUSLY |
| | NOTED IN EACH REJECTION, INCLUDING, BUT NOT LIMITED TO, |
| | EGRESS, FIRE PROTECTION, STRUCTURAL STABILITY, ENERGY, |
| | ACCESSIBILITY, LIGHTING, VENTILATION, ELECTRICAL, |
| | MECHANICAL, PLUMBING, AND GAS SYSTEMS, OR OTHER |
| | REQUIREMENTS IDENTIFIED BY RULE OF THE FLORIDA BUILDING |
| | COMMISSION ADOPTED PURSUANT TO CHAPTER 120, THE LOCAL |
| | GOVERNMENT SHALL IMPOSE, EACH TIME AFTER THE THIRD SUCH |
| | REVIEW THE PLANS ARE REJECTED FOR THAT CODE VIOLATION, |
| | A FEE OF FOUR TIMES THE AMOUNT OF THE PROPORTION OF THE |
| | PERMIT FEE ATTRIBUTED TO PLANS REVIEW. |
| | |
| | |
| | 1) PLUMBING SHEETS P1.01 AND P1.02 ARE STILL NOT SIGNED |
| | DIIGITALLY SIGNED AS STATED IN F.A.C RULE 61G1-16.005 |
| | |
| | 2) POWER BATHROOM FITTING APPEAR TO BE BACKWARDS. |
| | FITTING MUST BE INSTALLED IN DIRECTION OF FLOW. FBC |
| | 706.3 |
| | |
| | 3) THE POWER BATH TOILET IS NOT PERMITTED TO BE WET |
| | VENTED INTO THE BUILDING DRAIN. ONLY OTHER BATHROOM |
| | FIXTURES UP TO 2 AND ON THE SAME SAME FLOOR ARE |
| | PERMITTED TO DRAIN INTO THE BATHROOM WET VENT |
| | |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER |
| | BUILDING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 401 CLEMATIS STREET, 1ST FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | 561-248-2703 |
| | [email protected] |
| | |
| | |