| 2018-10-17 15:00:09 | 1) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | 2) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| | FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. |
| | SEC. G 2413.4.1, G2413.4.2. |
| | 3) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3 |
| | THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3. |
| | 4) SUBMIT TWO COPIES OF THE MANUFACTURER?S |
| | SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54, |
| | NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND |
| | 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES |
| | SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| | FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| | THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES. |
| | SEC.G2408.1. |
| | 5) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATERS |
| | ARE THE ONLY GAS APPLIANCES ON THIS SYSTEM. IF NOT, |
| | SUBMIT A COMPLETE GAS RISER SHOWING ALL PIPE SIZES, |
| | TYPE OF PIPE, THE DEVELOPED LENGTH TO THE FURTHEST GAS |
| | OUTLET, THE BTU LOAD OF EACH APPLIANCE, THE PSI OF THE |
| | SYSTEM, THE TYPE OF GAS AND THE TOTAL BTU LOAD ON THE |
| | SYSTEM. THESE REQUIREMENTS ALSO APPLY TO A NEW GAS |
| | SYSTEM. |
| | 6) ). SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 7) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATERS |
| | ARE REPLACING EXISTING TANKLESS WATER HEATERS OR |
| | REPLACING A STORAGE TANK TYPE WATER HEATER OR ARE THEY |
| | BEING ADDED TO THE EXISTING HOT WATER SYSTEM? INDICATE |
| | ON THE APPLICATION IN THE DESCRIPTION OF WORK. |
| | 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL |
| | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) |
| | THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8, |
| | G2413.1, G2413.2, & G2413.3. |
| | 9) YOU MUST SUBMIT SEPARATE APPLICATIONS FOR THE |
| | STRUCTURE WITH THE ADDRESS OF 408 30TH ST. OR CHANGE |
| | THE ADDRESS TO 3015 POINTSETTIA ST. ON THE PLANS. YOU |
| | CAN LABEL IT STRUCTURE #2 IF NECCESSARY. THERE IS NO |
| | 408 30TH ST. ADDRESS IN THE PROPERTY APPRAISER'S |
| | WEBSITE. I UNDERSTAND BOTH STRUCTURES ARE ON THE SAME |
| | PARCEL BUT BOTH STRUCTURES ARE UNDER 3015 POINTSETTIA |
| | STREET IN THE PROPERTY APPRAISER'S OFFICE. |
| | |
| | NOTE - A COMPLETE AND THOROUGH REVIEW COULD NOT BE DONE |
| | AT THIS TIME DUE TO THE LACK OF REQUIRED INFORMATION ON |
| | THE PLANS / DRAWINGS AND ADDITIONAL PLAN REVIEW |
| | COMMENTS MAY BE GENERATED UPON THE RE-REVIEW OF |
| | SUBMITTED CORRECTIONS |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |