| Date |
Text |
| 2018-12-05 16:15:24 | ****CORRECTIONS**** |
| | W.P.B. PERMIT: 18100654 |
| | REVIEWED: DECEMBER 5, 2018 |
| | |
| | DYLAN BATTLES |
| | BUILDING PLANS EXAMINER I |
| | [email protected] |
| | 561-805-6718 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC ENERGY = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | 1. [FBC ENERGY 103.1.1.2]CODE COMPLIANCE CERTIFICATION. |
| | THE BUILDING?S OWNER, THE OWNER?S ARCHITECT OR OTHER |
| | AUTHORIZED AGENT LEGALLY DESIGNATED BY THE OWNER SHALL |
| | CERTIFY THAT THE BUILDING IS IN COMPLIANCE WITH THE |
| | CODE, AS PER SECTION 553.907, FLORIDA STATUTES, PRIOR |
| | TO RECEIVING THE PERMIT TO BEGIN CONSTRUCTION OR |
| | RENOVATION. |
| | 553.907, FLORIDA STATUTES |
| | HAVE OWNER SIGN ENERGY CALCULATIONS UNDER THE PREPARED |
| | BY SIGNATURE. |
| | SUPPLY TWO COPIES BECAUSE WE ONLY RECEIVED ONE COPY OF |
| | UNSIGNED ENERGY CALCULATIONS. |
| | |
| | 2. [FBC 107.2.5]UPDATE CODE REFERENCES ON SHEET 1 TO |
| | STATE COMPLIANCE WITH FBC 2017 6TH EDITION INSTAED OF |
| | THE PREVIOUS VERSION AS SUBMITTED. |
| | |
| | 3. [FBC R318]INDICATE THE MEANS OF TERMITE PROTECTION |
| | PROPOSED AND REFERENCE SECTION R308 FOR STANDARDS. |
| | HOW WILL NEW SPACE MEET REQUIREMENTS FRO TERMITE |
| | TREATMENT? |
| | |
| | 4. [FBC R506.2.3]VAPOR RETARDER. |
| | A 6-MIL (0.006 INCH; 152 ?M) POLYETHYLENE OR APPROVED |
| | VAPOR RETARDER WITH JOINTS LAPPED NOT LESS THAN 6 |
| | INCHES (152 MM) SHALL BE PLACED BETWEEN THE CONCRETE |
| | FLOOR SLAB AND THE BASE COURSE OR THE PREPARED SUBGRADE |
| | WHERE NO BASE COURSE EXISTS. |
| | HOW WILL VAPOR BARRIER BE INSTALLED? |
| | |
| | NOTE: |
| | -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW |
| | EACH COMMENT IS BEING ADDRESSED. |
| | -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW |
| | OF MATERIALS REQUESTED. |
| | -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS |
| | OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS) |
| | SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT |
| | DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER |
| | SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID" |
| | OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS |
| | APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE |
| | NEED "VOID", RENDERING THEM NOT USABLE. |
| | |
| | |