| Date |
Text |
| 2021-08-16 14:34:54 | PROVISOS: |
| | 1.LIGHT FIXTURES AND POLES ALONG DIXIE HWAY, 4TH |
| | STREET, AND QUADRILLE BOULEVARD SHALL MEET THE DOWNTOWN |
| | CITY STANDARD. |
| | |
| | |
| | PLANTING DETAILS FOR GARAGE GREEN SCREEN SHALL BE |
| | INCLUDED IN THE LANDSCAPE DRAWING, AS WELL AS DETAILED |
| | MAINTENANCE PROCEDURES FOR THE GREEN SCREEN. |
| | 6. THE DAC ORDER REQUIRES THE SIDEWALK ELEVATION TO BE |
| | MAINTAINED ACROSS THE DRIVEWAY ENTRANCES. I DON?T THINK |
| | THE DRAWINGS REFLECT THAT CONDITION. PLEASE CONFIRM. I |
| | WOULD NEED A DETAIL OR A NOTE IN THE CIVIL DRAWINGS. IT |
| | IS REALLY HARD TO GET THE CONSTRUCTION TEAM TO DO THIS |
| | BECAUSE THEY ARE USED TO THE DRIVEWAY PREFERENCE. |
| | 7. PLEASE CONFIRM THAT THE GAS LINES ARE OK TO RUN |
| | THROUGH THE STRUCTURAL SOIL. THE GAS LINE ON 4TH IS |
| | GOING THROUGH STRUCTURAL SOIL. THERE ARE ALSO SOME ROOT |
| | BARRIERS PROPOSED ON THE TREES ON 4TH NEXT TO THE |
| | STRUCTURAL SOIL, COULD YOU EXPLAIN THE REASON? IT SEEMS |
| | THAT DEFEATS THE PURPOSE OF THE STRUCTURAL SOIL. |
| | 8. ADA PEDESTRIAN CROSSING AT 4TH AND DIXIE SHALL BE |
| | APPROVED BY THE ENGINEERING DEPARTMENT. |
| | 9. LANDSCAPE PERMIT SHALL BE SUBMITTED AS A SEPARATE |
| | PERMIT. |
| | 10. PLEASE PROVIDE A NARRATIVE EXPLAINING THE PARKING |
| | GARAGE OPERATION THAT ACKNOWLEDGES THE SHARED PARKING |
| | SYSTEM AND VALET OPERATION. |
| | 11. CAR SHARING STATION SHALL BE CLEARLY LABELED. |
| | 12. CONDITIONS OF APPROVAL INCLUDED IN DAC FINAL ORDER |
| | AND SITE PLAN APPROVAL LETTER ARE APPLICABLE TO THE |
| | BUILDING, AND SHALL BE FULFILLED ACCORDINGLY. |
| | FOR ADDITONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |