| Date |
Text |
| 2021-03-04 16:11:47 | 1. SATISFIED- SHEET A0.102 LIST BUILDING FOOTPRINT |
| | REQUIREMENT AS MINIMUM PERCENTAGE, IT IS A MAXIMUM |
| | PERCENTAGE. PLEASE CORRECT DATA TO ACCURATELY REFLECT |
| | REQUIREMENT. |
| | 2. SATISFIED. SHEET A0.102 STILL LIST 328 RESIDENTIAL |
| | UNITS WITHIN THE PROJECT DESCRIPTION AND THE REQUIRED |
| | PARKING DATA. PLEASE ADJUST TO THE CURRENT PROPOSAL OF |
| | 230 UNITS. TABLE IN THE SAME SHEET LIST 202 REGULAR |
| | RESIDENTIAL UNITS AND 23 MICRO UNITS FOR A TOTAL OF 205 |
| | NOT THE NEW 230 LISTED. PLEASE CORRECT AND ADJUST ALL |
| | RELATED CALCULATIONS. |
| | 3. NOT SATISFIED. SHEET A1.500 WAS NOT UPLOADED. BASED |
| | ON SHEET A1.500 PROVIDED BY ARCHITECT IT SEEMS THERE |
| | ARE SOME HOTEL ROOMS BELOW THE MINIMUM 350SF |
| | REQUIRED.PREVIOUS COMMENT:IN SHEET A1.500, THE HOTEL |
| | UNITS DESCRIPTION AND AREAS SUITE 1.3C AND 1.3W UNIT |
| | AREA IS NOT LISTED. PLEASE UPDATE TABLE AND INCLUDE |
| | INFORMATION TO CONFIRM COMPLIANCE WITH MINIMUM 350SF |
| | UNITS SIZE. |
| | 4. SATISFIED. BASED ON SHEET A1.500 PROVIDED BY |
| | ARCHITECT, NOT IN THE PERMIT SET.PLEASE INCLUDE THIS |
| | SHEET IN RESUBMITTAL. PREVIOUS COMMENT:PLEASE PROVIDE |
| | INFORMATION TO CONFIRM THAT REGULAR RESIDENTIAL UNITS |
| | COMPLY WITH THE AVERAGE 800SF UNIT SIZE. |
| | 5. NOT SATISFIED.PLEASE SUBMIT COLORED ELEVATIONS WITH |
| | CALL OUT MATERIALS. |
| | 6. NOT SATISFIED. TABLE SUBMITTED BUT NOT GRAPHIC BY |
| | FLOOR. PLEASE SUBMIT REFLECTING ANY CAHNGES TO THE FAR |
| | CACLUALTION. PREVIOSU COMMENT:PLEASE SUBMIT THE FAR |
| | DETAIL INFORMATION PER FLOOR AS SUBMITTED FOR SITE PLAN |
| | APPROVAL. |
| | 7. NOT SATISTIED.PLEASE INDICATE THE PLANTING AREAS IN |
| | THE GARAGE LEVESL.PREVIOUS COMMENT:PLEASE EXPLAIN HOW |
| | THE PLANTS PROPOSED FOR THE GARAGE SCREENING WILL GROW |
| | AND STILL MAINTAIN THE AIR FLOW REQUIRED FOR GARAGE |
| | VENTILATION. |
| | 8. SATISFIED.PLEASE CONFIRM THE GLASS UTILIZED FOR THIS |
| | PROJECT AT THE GROUND FLOOR IS NOT DARK TINTED OR |
| | REFLECTIVE TO THE POINT THAT THE INTERIOR IS NOT |
| | VISIBLE FROM OUTSIDE. |
| | 9. SATISFIED. PLEASE INCLUDE DETAILS IN THE LANDSCAPE |
| | PERMIT. PREVIOUS COMMENT: FURTHER DISCUSSION IS |
| | NECESSARY FOR THE SELECTION OF THE LANDSCAPE MATERIAL |
| | TO BE LOCATED ON THE QUADRILLE BLVD MEDIAN. |
| | 10. PARTIALLY SATISFIED. FOR PROJECT RECORDS, PLEASE |
| | INCLUDE INFORMATION IN THE PERMIT SET. PREVIOUS |
| | COMMENT: PLEASE CONFIRM PALM TRAM APPROVED THE |
| | RELOCATION OF THE EXISTING SHELTER TO THE PROPOSED |
| | LOCATION. |
| | 11. SATISFIED.DUE TO THE PROPOSED MICROUNITS PROJECT IS |
| | REQUIRED TO PROVIDE 1 CAR SHARING STATION PER EVERY 13 |
| | MICROUNITS. IF PARKING IS PROVIDED FOR THE MICROUNITS |
| | THERE MUST BE AT LEAST ONE CAR SHARING STATION ON SITE. |
| | PLEASE IDENTIFY LOCATION OF CAR SHARING STATION INSIDE |
| | PARKING GARAGE. |
| | 12. ACKNOWLEDGED.DUE TO THE PROPOSED MICROUNITS, |
| | PROJECT IS REQUIRED TO CONTRIBUTE A FEE INTO THE |
| | TROLLEY OPERATION FUND. FEE IS EQUAL TO $10 PER |
| | UNIT/MONTH. AN AGREEMENT WILL BE REQUIRED WITH THE |
| | PROPERTY OWNER BEFORE FINAL CO. |
| | 13. NOT SATISFIED. PLEASE INCLUDE IN PERMIT SET. |
| | PREVIOUS COMMENT:PLEASE IDENTIFY THE LOCATION FOR |
| | MICRO-MOBILITY STATION WITHIN THE PROJECT PUBLIC REALM |
| | AREA. |
| | 14. NOT SATISFIED. PLEASE INCLUDE IN PERMIT SET. |
| | MINIMUM ACTIVE USE REQUIREMENT ALONG DIXIE HWAY IS 80% |
| | NOT 79%. PLEASE ADJUST TO CONFIRM COMPLIANCE. |
| | 15. NOT SATISFIED. PLEASE INCLUDE IN PERMIT SET.THE |
| | VARIANCE APPROVED BY THE DAC TO REDUCE ACTIVE USES |
| | ABOVE THE FIRST FLOOR ALONG QUADRILLE BLVD ALLOWED A |
| | REDUCTION FROM 60% TO 47%. PROPOSED PROJECT LISTS |
| | ACTIVE USES ONLY ALONG 31.9%. PLEASE INCREASE AMOUNT OF |
| | ACTIVE USES TO COMPLY WITH VARIANCE APPROVED. |
| | 16. PARTIALLY SATISFIED. THE ADA RAMP NEEDS TO EXPAND |
| | TO COVER BOTH PEDESTRIAN CROSSINGS N-S AND E-W. |
| | PREVIOUS COMMENT: PLEASE PROVIDE A PEDESTRIAN CROSSING |
| | ACROSS DIXIE HWAY FROM THE SE CORNER OF THE PROJECT. |
| | 17. SATISFIED.PLEASE RELOCATE AT LEAST 3 BIKE RACKS |
| | CLOSER TO THE OFFICE TOWER OPEN SPACE, AND RELOCATE AT |
| | LEAST 2 BIKE RACKS TO THE AREA CLOSER TO THE PROPOSED |
| | RETAIL. |
| | 18. GRADING PLAN SHEET 4 HAS LABELS BLACKED OUT. |
| | 19. NOT SATISFIED. LANDSCAPE PERMIT WAS FAILED IN 2018 |
| | AND IT HAS NOT BEEN RESUBMITTED SINCE THEN. A SEPARATE |
| | LANDSCAPE PERMIT WILL BE REQUIRED FOR THIS PERMIT. |
| | 20. NOT SATISFIED.PLEASE PROVIDE INFORMATION TO CONFIRM |
| | COMPLIANCE WITH PLANAR BREAK AT ALL APPLICABLE FACADES. |
| | 21. NOT SATISFIED. PLEASE SEE COMMENTS PROVIDED ON |
| | 11/29/2018 AS SOME OF THOSE HAVE NTO BEEN ADDRESSED. |
| | ADDITIONAL COMMENTS: |
| | 22. WHEN YOU RESUBMIT, PLEASE INCLUDE UPDATED SHEETS TO |
| | CONFIRM THE ZONING REQUIREMENTS ARE MET AND NOTHING HAS |
| | CHANGED SINCE SITE PLAN APPROVAL IN RELATIONS TO PLANAR |
| | BREAKS, ACTIVE USE PERCENTAGES ETC. |
| | 23. IN THE RESPONSE SHEET PLEASE IDENTIFY THE SHEET IN |
| | WHICH STAFF CAN FIND THE INFORMATION REQUESTED. |
| | 24. PLEASE PROVIDE A NARRATIVE EXPLAINING HOW THE |
| | PARKING OPERATION IS GOING TO WORK. THERE ARE SEVERAL |
| | TANDEM SPACES THAT CAN ONLY WORK WITH VALET PARKING |
| | BECAUSE THE PARKING IS CALCULATED BASED ON A SHARED |
| | SYSTEM AND SPACES CANNOT BE ASSIGNED TO INDIVIDUAL |
| | TENANTS. |
| | 25. PLEASE PROVIDE PHOTOMETRICS FOR THE STREETLIGHTS TO |
| | CONFIRM COMPLIANCE WITH THE MINIMUM 06 FOOTCANDLES |
| | REQUIRED. STREETLIGHT FIXTURE AND POLE SHALL BE THE |
| | DOWNTOWN STANDARD. |
| | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |