2021-02-18 12:49:051) SHT. P.509 - DETAIL #2 SHOWS A 1 INCH GAS LINE DOWN
 TO AN AHU. WHERE IS THIS AHU LOCATED? THE GAS LINE
 SHOWS A SHUTOFF VALVE ON THE GAS LINE. THE SHUTOFF
 VALVE SHALL BE LOCATED IN THE SAME ROOM AS THE
 APPLIANCE AND WITHIN 6 FEET OF THE APPLIANCE PER
 FBC-FUEL GAS SEC.409.5.1. CLARIFY.
 2) SHT. P.700 - KEYNOTE #7 - PROVIDE A REFERENCE RISER
 TAG FOR THIS LINE OR PROVIDE A SHEET NUMBER AS TO WHERE
 THE CONTINUATION OF THIS LINE CAN BE FOUND AND PROVIDE
 A COMPLETE GAS RISER FOR THIS AREA SHOWING ALL PIPE
 SIZES, BTU LOADS OF APPLIANCES/EQUIPMENT, GAS PRESURE
 OF SYSTEM, VALVES, LONGEST RUN FROM POINT OF DELIVRY,
 ETC. WPB AMEND. TO FBC SEC. 107.2.1,107.3.5.1.5.
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE GAS
 APPLIANCES/EQUIPMENT IN THE RESTAURANT. WPB AMEND. TO
 FBC SEC. 107.2.1.
 4) SHT. P.700 - KEYNOTE #11 - SUBMIT A COMPLETE GAS
 RISER FOR THIS AREA EVEN THOUGH IT IS FOR FUTURE OR THE
 LOAD IS ESTIMATED. WPB AMEND. TO FBC SEC. 107.2.1,
 107.3.5.1.5.
 5) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN 1 FOOT OF EITHER SIDE OF THE
 REGULATORS PER FBC-FUEL GAS SEC.410.2 (7).
 6) THE INSTALLATION OF THE MP REGULATORS SHALL ALSO
 COMPLY WITH FBC-FUEL GAS SEC.410.2 ITEMS #1-#6.
 7) SHT. P.700 - NATURAL GAS SYSTEMS TABLE - SYSTEM #1
 SHOWS THE MAXIMUM BTU LOAD AS 4854 CFH BUT THE GAS
 RISER ON THE SAME PAGE SHOWS THE BTU LOAD AS 3229 CFH.
 CLARIFY.
 8) SHT. P.700 - KEYNOTE #3 - IDENTIFY THIS FUTURE
 LINE/SYSTEM ON THE GAS RISER.WPB AMEND. TO FBC SEC.
 107.2.1.
 9) SHT. P.700 - NATURAL GAS SYSTEMS TABLE - GAS SYSTEM
 #5 - THE TABLE NOTES THE BTU LOAD AS 3,650 CFH BUT THE
 RISER SHOWS 3,500 CFH. CLARIFY..
 10) SHT. P.700 - KEYNOTE #11 - PROVIDE A REFERENCE
 RISER TAG FOR THIS LINE OR PROVIDE A SHEET NUMBER AS TO
 WHERE THE CONTINUATION OF THIS LINE CAN BE FOUND AND
 PROVIDE A COMPLETE GAS RISER FOR THIS AREA SHOWING ALL
 PIPE SIZES, BTU LOADS OF APPLIANCES/EQUIPMENT, GAS
 PRESURE OF SYSTEM, VALVES, LONGEST RUN FROM POINT OF
 DELIVERY, ETC. WPB AMEND. TO FBC SEC. 107.2.1,
 107.3.5.1.5.
 11) SHT. P.700 - KEYNOTE #14 SHOWS THE GAS LINE WITH
 579 CFH AND SHT. P.700A, DETAIL #2 SHOWS 500 CFH.
 CLARIFY.
 12) SHT. P.700 - THERE ARE RISER TAGS AT HE GAS RISER
 ON LEVELS 6,7, & 8 WITH NO DRAWING LOCATIONS/SHEET
 NUMBERS ON THE RISER TAGS. CLARIFY.
 13) SHT. P.700A - DETAIL #6 SHOWS THE THE LONGEST RUN
 AS 550 FEET.THIS LINE IS UNDERSIZED AS DESIGNED. A
 MAXIMUM OF 556,000 BTU'S CAN BE ACCOMMODATED ON A 2 1/2
 INCH LINE AT A DISTANCE OF 550 FEET IN ACCORDANCE WITH
 FBC-FUEL GAS TABLE 402.4(1). CLARIFY.
 14) SHT. P.700A - DETAIL #5 - SIZE THE SHORT SECTION OF
 THE GAS MAIN LINE BETWEEN THE 4 INCH LINE AND THE 2 1/2
 INCH LINE. SIZING SHALL COMPLY WITH FBC-FUEL GAS TABLE
 402.4 (1). 2ND REQUEST. CLARIFY.
 15) SHT. P.700A - DETAILS # 1- #6 - THERE IS A NOTE ON
 ALL THE DETAILS THAT REFER TO DETAIL #10 ON SHT.P.802
 BUT THERE IS NO SUCH DETAIL ON THIS SHEET. 2ND
 REQUEST.CLARIFY. THE RESPONSE NARRATIVE STATES THE
 DETAIL IS ON SHT. P.804, DETAIL #10, BUT THAT DETAIL IS
 FOR A THERMOSTATIC MIXING VALVE AND IS NOT APPLICABLE.
 16) SHT. P.700A - DETAILS #1 & #3 - NOTE #4 STATES TO
 REFER TO SHT. P.802, DETAIL #6 FOR THE WATER HEATER
 DETAIL. DETAIL #6 ON SHT.P.802 IS FOR A CONDENSATE
 DRAIN. 2ND REQUEST. CLARIFY.
 17) SHT. P.700A - PLACE THE SPECIFIC SHEET NUMBER OF
 THE ORIGIN/CONTINUATION OF THE GAS SUPPLY LIINES TO THE
 APPLIANCES/EQUIPMENT ON EACH GAS RISER DETAIL. 2ND
 REQUEST.
 18) SHT. P.804 - SUBMIT THE SPECIFICATIONS/INSTALLATION
 MANUAL FOR THE GAS DETECTION SYSTEM AND REFERENCE THE
 STANDARD ON WHICH THIS SYSTEM IS DESIGNED. 2ND
 REQUEST.WPB AMEEND. TO FBC SEC.107.2.1.
 19) SHT. P.700 - THERE ARE FOUR RISER TAGS ON THIS PAGE
 IDENTIFIED AS G/H1, G/H2, G/H3 AND G/R1 WITH NO DRAWING
 LOCATION ON THESE RISER TAGS. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved