Plan Review Notes
Plan Review Notes For Permit 18100540
Permit Number 18100540
Review Stop M
Sequence Number 1
Notes
Date Text
2019-04-08 17:58:151ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18100540
 550 N QUADRILLE BLVD
 4/2/19
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
 PLAN REVIEW RESULTS: DENIED.
  
 THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES
 AND OMISSIONS LISTED BELOW. PLEASE REVIEW ALL COMMENTS,
 INCLUDING THOSE LISTED FOR ADVISORY PURPOSES, AND
 RESUBMIT CORRECTED PLANS AND REQUIRED DOCUMENTS. WHEN
 RESUBMITTING, PLEASE PROVIDE A RESPONSE LETTER
 ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL
 FORM.
 PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL
 CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE
 PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB
 BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL
 INSPECTOR, PLANS EXAMINER, AND OTHER OFFICIALS- TO
 DISCUSS TIMELINES AND GUIDELINES FOR INSPECTIONS AND
 THE DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION
 WILL FOLLOW ONCE ALL PLANS ARE APPROVED.
  
 1) THE FOLLOWING LIST OF DOCUMENTS WERE NOT SUBMITTED
 BUT ARE REQUIRED TO PERFORM A COMPLETE MECHANICAL
 REVIEW FOR THE PROJECT.
 1A) SMOKE CONTROL RATIONAL ANALYSIS- SECTION 513.4 FBC
 M: A RATIONAL ANALYSIS SUPPORTING THE TYPES OF SMOKE
 CONTROL SYSTEMS TO BE EMPLOYED, THEIR METHODS OF
 OPERATION, THE SYSTEMS SUPPORTING THEM AND THE METHODS
 OF CONSTRUCTION TO BE UTILIZED SHALL ACCOMPANY THE
 SUBMITTED CONSTRUCTION DOCUMENTS AND SHALL INCLUDE, BUT
 NOT BE LIMITED TO, THE ITEMS INDICATED IN SECTIONS
 513.4.1 THROUGH 513.4.7.
 513.4.1 STACK EFFECT: THE SYSTEM SHALL BE DESIGNED SUCH
 THAT THE MAXIMUM PROBABLE NORMAL OR REVERSE STACK
 EFFECTS WILL NOT ADVERSELY INTERFERE WITH THE SYSTEM'S
 CAPABILITIES. IN DETERMINING THE MAXIMUM PROBABLE STACK
 EFFECTS, ALTITUDE, ELEVATION, WEATHER HISTORY AND
 INTERIOR TEMPERATURES SHALL BE USED.
 513.4.2 TEMPERATURE EFFECT OF FIRE: BUOYANCY AND
 EXPANSION CAUSED BY THE DESIGN FIRE IN ACCORDANCE WITH
 SECTION 513.9 SHALL BE ANALYZED. THE SYSTEM SHALL BE
 DESIGNED SUCH THAT THESE EFFECTS DO NOT ADVERSELY
 INTERFERE WITH ITS CAPABILITIES.
 513.4.3 WIND EFFECT: THE DESIGN SHALL CONSIDER THE
 ADVERSE EFFECTS OF WIND. SUCH CONSIDERATION SHALL BE
 CONSISTENT WITH THE WIND-LOADING PROVISIONS OF THE
 FLORIDA BUILDING CODE, BUILDING.
 513.4.4 HVAC SYSTEMS: THE DESIGN SHALL CONSIDER THE
 EFFECTS OF THE HEATING, VENTILATING AND
 AIR-CONDITIONING (HVAC) SYSTEMS ON BOTH SMOKE AND FIRE
 TRANSPORT. THE ANALYSIS SHALL INCLUDE ALL PERMUTATIONS
 OF SYSTEMS STATUS. THE DESIGN SHALL CONSIDER THE
 EFFECTS OF FIRE ON THE HVAC SYSTEMS.
 513.4.5 CLIMATE: THE DESIGN SHALL CONSIDER THE EFFECTS
 OF LOW TEMPERATURES ON SYSTEMS, PROPERTY AND OCCUPANTS.
 AIR INLETS AND EXHAUSTS SHALL BE LOCATED SO AS TO
 PREVENT SNOW OR ICE BLOCKAGE.
 513.4.6 DURATION OF OPERATION: ALL PORTIONS OF ACTIVE
 OR ENGINEERED SMOKE CONTROL SYSTEMS SHALL BE CAPABLE OF
 CONTINUED OPERATION AFTER DETECTION OF THE FIRE EVENT
 FOR A PERIOD OF NOT LESS THAN EITHER 20 MINUTES OR 1.5
 TIMES THE CALCULATED EGRESS TIME, WHICHEVER IS GREATER.
 513.4.7 SMOKE CONTROL SYSTEM INTERACTION: THE DESIGN
 SHALL CONSIDER THE INTERACTION EFFECTS OF THE OPERATION
 OF MULTIPLE SMOKE CONTROL SYSTEMS FOR ALL DESIGN
 SCENARIOS.
 THE SMOKE ANALYSIS SHALL CONTAIN A PROJECT DESCRIPTION
 OF SMOKE CONTROL SYSTEMS, SPRINKLER AND STANDPIPE
 SYSTEMS, FIRE ALARM SYSTEMS, SHAFT VENTING, AND CONTROL
 SYSTEMS. INCLUDED IN THE ANALYSIS SHALL BE SPECIAL
 INSPECTION AND TEST REQUIREMENTS, TESTING PROCEDURES,
 AND FINAL COMMISSIONING REQUIREMENTS FOR THE SYSTEMS.
 IMPORTANT NOTE: ACCEPTANCE TESTING OF THE PROJECT'S
 SMOKE CONTROL SYSTEMS SHALL BE COMPLETED UNDER NORMAL
 AND EMERGENCY POWER. PLEASE PROVIDE A DESCRIPTION OF
 THE EMERGENCY PROCEDURE THAT INCLUDES BOTH EMERGENCY
 GENERATORS AND HOW THE FIRE ALARM AND LIFE SAFETY
 SYSTEMS IN THE TWO TOWERS AND PODIUM WILL COORDINATE
 AND INTERACT TOGETHER.
  
 1B) AC COOLING AND HEATING CALCULATIONS- SECTION
 C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING,
 VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL
 BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA
 STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED
 EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN
 PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING
 LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS
 THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE
 UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE
 ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN
 APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN
 LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM
 SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING
 IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS
 OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL
 BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL
 PERMIT.
  
 1C) ENERGY EFFICIENCY COMPLIANCE REPORT- SECTION C401.2
 FBC EC.
 COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF THE
 FOLLOWING:\]
 1.THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1, EXCLUDING
 SECTION 9.4.1.1(G) OF THE STANDARD.
 2.THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN
 ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH
 SECTION C406 AND TENANT SPACES SHALL COMPLY WITH
 SECTION C406.1.1.
 3.THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404,
 C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING
 ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT
 OF THE STANDARD REFERENCE DESIGN BUILDING.
 PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA
 BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER
 SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO
 APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER
 SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE.
  
 1D) COMMISSIONING PLAN: COMMISSIONING OF THE MECHANICAL
 SYSTEMS AND SERVICE WATER HEATING SYSTEMS IS REQUIRED
 PER SECTION C408.2 FBC EC. COMMISSIONING PLAN. "PRIOR
 TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, THE
 LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER, OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION".
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 2) SUBMITTALS: REQUIRED SUBMITTALS LISTED BELOW SHALL
 HAVE SHOP DRAWING STAMPS BY THE EOR AND BE IN THE FIELD
 AT TIME OF INSPECTION.
 A) SMOKE CONTROL FANS INCLUDING SMOKE EXHAUST FANS, AND
 STAIRWELL AND ELEVATOR PRESSURIZATION FANS.
 B) FIRE DAMPERS AND FIRE/SMOKE DAMPERS.
 C) MOTORIZED AND GRAVITY DAMPERS
 D) DUCT SMOKE DETECTORS
 E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES
 INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
 F) AC STAND NOA'S OR FL. PRODUCT APPROVALS
 G) C0, N02, & CO2 SENSORS, AND REFRIGERANT LEAK
 DETECTORS.
 H) COOLING TOWERS AND CHILLERS
 I) FACTORY BUILT DUCTWORK
 J) DUCT FIRE WRAPPING
 K) CLOTHES DRYERS
 L) TOILET AND DRYER EXHAUST WALL CAPS
 M) COOKING APPLIANCES
 N) TEST AND BALANCE REPORTS
 O) SMOKE CONTROL TEST REPORTS.
  
 2A) SUBMITTALS TO BE PROVIDED TO THE BUILDING
 DEPARTMENT FOR REVIEW.
 A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR
 INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND
 APPLIANCES. ALL DELEGATED ENGINEERING SHALL BEAR THE
 SHOP DRAWING STAMP OF THE STRUCTURAL ENGINEER RECORD.
 B) GENERATORS AND FUEL TANKS AND ALL ASSOCIATED
 EQUIPMENT, VENT FLUES, AND FUEL OIL PIPING.
 C) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR
 DUCTS AND VENT FLUES.
 D) COMMISSIONING REPORTS
 PLEASE NOTE: ALL SUBMITTALS AND SHOP DRAWINGS SHALL
 BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN
 PROFESSIONAL OF RECORD. ALL REQUIRED SUBMITTALS MAY BE
 DEFERRED IN ACCORDANCE WITH SECTION 107.3.4.1 WPB. IT
 WILL BE HELPFUL TO UPLOAD A MASTER LIST OF DEFERRED
 SUBMITTALS IN DOCUMENT FORM, OR IN THE FORM OF NOTES ON
 THE MECHANICAL PLANS.
 DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS SECTION,
 DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF
 THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING.
  
 3) SEPARATE PERMITS: SEPARATE PERMITS ARE REQUIRED FOR
 COMMERCIAL KITCHEN EXHAUST HOODS, FIRE SUPPRESSION
 SYSTEMS, AND WALK-IN COOLERS AND FREEZERS. PLEASE PLACE
 NOTES ON THE MAIN BUILDING PLANS ACCORDINGLY AND
 PROVIDE THE FOLLOWING INFORMATION FOR THE KITCHEN
 HOODS.
 A) LOCATIONS OF HOODS, EXHAUST AND MAKEUP AIR FANS AND
 DUCTWORK, EXHAUST AND MAKEUP AIR OUTLETS AND INLETS,
 MUA UNITS IF PROVIDED.
 B) AIR BALANCE CALCULATIONS.
 C) ADVISORY: REFER TO SECTION 508.1.1 FBC M. MAKEUP AIR
 TEMPERATURE: THE TEMPERATURE DIFFERENTIAL BETWEEN
 MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE SHALL
 NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT WHERE THE
 ADDED HEATING AND COOLING LOADS OF THE MAKEUP AIR DO
 NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM.
  
 4) PROVIDE VENTILATION CALCULATIONS AND A SCHEDULE THAT
 INDICATES THE REQUIRED AND PROVIDED OUTDOOR AND EXHAUST
 AIRFLOW RATES. THE O/A CFMS LISTED IN THE 100% O/A-ERU
 AND AHU EQUIPMENT SCHEDULES SHALL CORRELATE WITH THE
 CALCULATIONS. PLEASE ALSO PROVIDE AIR BALANCE
 CALCULATIONS ? TABLE 403.3.1.1 FBC M & SECTION C403.2.7
 FBC EC.
 5) PROVIDE CALCULATIONS FOR THE POST FIRE SMOKE PURGE
 SYSTEM AND FANS- SEE SECTION 403.4.7 FBC B.
 6) PARKING GARAGE EXHAUST- PODIUM LEVELS 1- 6 (SHEETS
 M201, 202, 203, 204, 205, 206) PROVIDE CALCULATIONS-
 TABLE 403.3.1.1 AND SECTION 404.1 FBC M. A) INDICATE
 THE SEQUENCE OF OPERATION FOR THE EXHAUST SYSTEM-
 SECTION 404.2 FBC M. ADVISORY: PLEASE PROVIDE NOTES AND
 DETAILS ON THE PLANS THAT ARE CONSISTENT WITH THE
 SEQUENCING NOTES ON SHEET M.813. B) SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE CO AND NO2
 SENSORS (MAY BE DEFERRED PER COMMENT #2). C) REFER TO
 SECTION C403.2.6.2 FBC EC FOR ENERGY COMPLIANCE
 REQUIREMENTS.
  
 PODIUM
 7) SHEETS M.201-M.208 A, B, C, & D QUADRANTS: DUCT
 SMOKE DETECTORS ARE REQUIRED IN THE SUPPLY SYSTEMS OF
 THE AHU'S PER SECTION 606.2.1 FBC M. PLEASE PROVIDE DS
 SYMBOLS ON THE PLANS AND RISER DRAWINGS TO SHOW THE
 LOCATIONS.
 8) M.201-M.208 A, B, C, & D QUADRANTS: DUCT SMOKE
 DETECTORS ARE REQUIRED IN THE SUPPLY SYSTEMS OF THE
 100% O/A ERU SYSTEMS, AND AT EACH STORY OF THE RA/EA
 RISER- SECTION 606.2.3. PLEASE PROVIDE DS SYMBOLS ON
 THE PLANS AND RISER DRAWINGS TO SHOW THE LOCATIONS.
 9) M.201-M.208 A, B, C, & D QUADRANTS: SHOW CLEARANCE
 DISTANCE MEASUREMENTS FOR O/A INTAKES AND EXHAUST
 OUTLETS IN COMPLIANCE WITH SECTIONS 401.4 AND 501.3.1
 FBC M OR PROVIDE GENERAL KEYNOTES.
 10) M.201-M.208 A, B, C, & D QUADRANTS: REFER TO
 SECTION 306.1 AND VERIFY ACCESS IS PROVIDED FOR AC AND
 FAN UNITS LOCATED ABOVE HARD CEILING. SHOW AN ACCESS
 PANEL WITH DIMENSIONS ON THE DRAWINGS WHERE REQUIRED-
 SECTION 306.1 FBC M.1
 11) M.201-M.208 A, B, C, & D QUADRANTS: PLACE NOTES TO
 INDICATE LOCATIONS OF ABOVE CEILING PLENUMS AND NO
 COMBUSTIBLE MATERIALS PERMITTED.
 12) SHEETS M.201-M.208 A, B, C, & D QUADRANTS: BRANCH
 AND FLEX DUCT SIZES NOT SHOWN- SECTION 603.1 FBC M.
 13) M.201- M.208 A, B, C, D QUADRANTS WHERE APPLICABLE:
 FIRE DAMPERS MISSING FOR THE O/A BRANCH DUCTS
 PENETRATING THE FIRE-RATED CORRIDOR/SUITE, AND
 CORRIDOR/RESIDENTIAL UNIT WALLS- SECTION 607.5.3 FBC M.
 14) M.201- M.208 A, B, C, D QUADRANTS WHERE APPLICABLE:
 PLACE NOTES TO INDICATE NO COMBUSTIBLE MATERIALS
 PERMITTED IN THE VHP CLOSETS INCLUDING THE DOORS-
 SECTION 602.2.1 FBC M. IT APPEARS THE DOORS WILL BE
 LOUVERED TO ALLOW RETURN AIR TO THE HEAT PUMPS,
 OTHERWISE INDICATE MEANS OF RETURN AIR- SECTION 601.6
 FBC M.
 15) M.201- M.208 A, B, C, D: AUTOMATICALLY OPERATING
 SHUTOFF DAMPERS ARE REQUIRED FOR THE O/A DUCTS SERVING
 THE SUITES AND THE UNITS- SECTION C403.2.4.3 FBC EC.
 16) M.201A: AN AUTOMATIC SHUTOFF DAMPER IS REQUIRED FOR
 THE O/A SUPPLY TO AHU-5- SECTION C403.2.4.3 FBC EC
 17) SHEET ALS1.101 & M.201B: FIRE DAMPERS MISSING FOR
 TOILET EXHAUST DUCT PENETRATING OFFICE/LOBBY &
 VALET/LOBBY WALLS, & 48X20 EXHAUST DUCT PENETRATING
 MENS WC/VALET WALL- SECTION 607.5.2 FBC M.
 18) M.201B: IDENTIFY THE AC SYSTEM CONNECTED TO THE
 SUPPLY AND RETURN DROPS IN THE OFFICE/LOBBY ROOM-
 PROVIDE A NOTE ON THE PLAN- SECTION 107.2.1 WPB. A)
 IDENTIFY WITH A NOTE THE SYSTEM CONNECTED TO THE 40X20
 RETURN DUCT- SECTION 107.2.1 WPB. B) FIRE DAMPERS
 MISSING FOR THE 48X20 EXHAUST DUCT PENETRATING
 FIRE-RATED WALLS AT THE FIRE LOBBY, RECEIVING ROOM, AND
 MENS WC. C) FIRE DAMPER MISSING FOR THE 6X6 SUPPLY
 PENETRATING FIRE-RATED WALL AT THE FIRE LOBBY.
 19) M.201C: LABEL THE SYSTEM CONNECTED TO THE 60X24
 DROPS IN THE SCREENING ROOM- SECTION 107.2.1 WPB.
 20) ALS1.101 & M.201C: THERE ARE NUMEROUS FIRE DAMPERS
 MISSING FOR SUPPLY, RETURN, AND EXHAUST DUCTS RUNNING
 THROUGH THE FIRE-RATED WALLS AT THE TRASH ROOM, OFFICE,
 RESIDENT?S LOUNGE, ETC.- SECTION 607.5.2 FBC M. MANY OF
 THESE ARE BRANCHING OFF THE TWO MAIN 60X24 DUCTS.
 21) M.201C: SHOW THE LOCATION OF MAU-01.
 22) M.201C: SUBMIT MANUFACTURER'S SPECIFICATIONS AND UL
 CERTIFICATE FOR THE 2000-GALLON FUEL TANK.
 23) M.201C: VENTILATION IS REQUIRED FOR THE FUEL TANK
 ROOM AND IT CANNOT BE ACHIEVED NATURALLY BECAUSE OF THE
 ROOM LOCATION. REFER TO SECTION 24.10.2 NFPA 30 AND
 PROVIDE A MECHANICAL VENTILATION SYSTEM THAT INCLUDES
 CALCULATIONS AND SPECIFICATIONS FOR EXHAUST AND MAKEUP
 AIR. A) PROVIDE DETAILS AND SPECIFICATIONS FOR NORM AND
 EMERGENCY RELIEF VENTING OF THE TANK, INCLUDING VENT
 PIPING RUNS AND TERMINATION LOCATIONS AT THE EXTERIOR
 OF THE BUILDING- SECTION 24.13 NFPA 30.
 24) THE EXHAUST SYSTEM FOR THE FIRE PUMP ROOM IS
 INCOMPLETE- PLEASE PROVIDE THE TYPE AND SIZE OF EXHAUST
 DUCT, LOCATION OF EXHAUST FAN, FAN EQUIPMENT SCHEDULE,
 EXHAUST CALCULATIONS AND SEQUENCE OF OPERATION, AND
 SOURCE OF MAKEUP AIR.
 25) M.201D: FIRE DAMPERS MISSING FOR THE DUCTS
 PENETRATING THE FIRE-RATED WALLS AT THE SERVICE
 CORRIDOR AND AHU LOBBY ROOM- SECTION 607.5.2 FBC M.
 26) M202B: THE EXHAUST FROM EF-A01 & EF-A02 SHALL
 DISCHARGE TO THE OUTDOORS AND NOT INTO THE ENCLOSED
 GARAGE- SECTION 501.3 FBC M.
 27) M.202B: DUCTWORK IN THE OPEN AREA IS INCOMPLETE- NO
 DUCT SIZES, AIRFLOWS, SYSTEM IDENTIFICATION ETC.-
 SECTION 107.2.1 WPB.
 28) M.202B: PROVIDE NOTES AT AHU-03 TO INDICATE WHICH
 AREA IS BEING CONDITIONED BY THE SYSTEM, AND HOW O/A IS
 BEING PROVIDED AND AUTOMATICALLY CONTROLLED- SECTION
 C404.2.4.3 FBC EC.
 29) M.202B: FIRE DAMPER MISSING FOR THE 8X8 SUPPLY DUCT
 PENETRATING FIRE-RATED WALL AT THE FIRE LOBBY.
 30) M.202C: PROVIDE A TERMINATION CAP FOR THE PFP SMOKE
 PURGE DUCT, AND INDICATE MINIMUM 10' CLEARANCE TO THE
 O/A INTAKES LOCATED IN PROXIMITY OF THE OUTLET- SECTION
 501.3.1 FBC M.
 31) M.202C: AUTOMATIC SHUTOFF DAMPERS ARE REQUIRED FOR
 THE O/A SUPPLY DUCTS TO AHU-5 AND SPF-01- SECTION
 C403.2.4.3 FBC EC.
 32) M.202C: IDENTIFY THE SOURCE OF THE O/A DUCT TRUCK
 SUPPLYING THE VERTICAL HEAT PUMPS (VHP) IN THE UNITS
 AND PROVIDE AUTOMATIC SHUTOFF DAMPERS AT EACH SUPPLY-
 SECTION 107.2.1 WPB AND SECTION C403.2.4.3 FBC EC.
 33) M.202C: THE 22X22 SPF-01 INTAKE DUCT SHALL BE
 COMPLETELY ENCLOSED IN A FIRE-RATED HORIZONTAL ASSEMBLY
 AS REQUIRED BY SECTION 909.20.6.1 FBC B. SUBMIT
 MANUFACTURER?S SPECIFICATIONS FOR THE 2-HR FIRE
 WRAPPING (MAY BE DEFERRED SUBMITTAL). A FIRE/SMOKE
 DAMPER IS REQUIRED AT SG-3 PENETRATION INTO STAIR-1 -
 SECTION 1023.5 FBC B.
 34) M.202D: PROVIDE NOTES AT AHU-04 TO INDICATE WHICH
 AREA IS BEING CONDITIONED BY THE SYSTEM, AND HOW O/A IS
 BEING PROVIDED AND AUTOMATICALLY CONTROLLED- SECTION
 C404.2.4.3 FBC EC.
 35) M.202D: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR WALLS.
 36) M.203B: IDENTIFY THE SOURCE OF THE O/A DUCT TRUCK
 SUPPLYING THE FAN COIL UNITS (FCU) IN THE UNITS AND
 PROVIDE AUTOMATIC SHUTOFF DAMPERS FOR THE SUPPLY AT
 EACH UNIT- SECTION 107.2.1 WPB AND SECTION C403.2.4.3
 FBC EC.
 37) M.203B: INDICATE WHAT AIR IS BEING RETURNED VIA THE
 54X24 RA DUCT IN THE SHAFT. THE PLAN SHOWS NO DUCTS
 CONNECTING TO IT.
 38) M.203B: FIRE DAMPER MISSING FOR THE 6X6 SUPPLY DUCT
 PENETRATING FIRE-RATED WALL AT THE FIRE LOBBY.
 39) M.203C: THE SPF-03 INTAKE DUCT SHALL BE COMPLETELY
 ENCLOSED IN A FIRE-RATED HORIZONTAL ASSEMBLY AS
 REQUIRED BY SECTION 909.20.6.1 FBC B. A FIRE/SMOKE
 DAMPER IS REQUIRED AT SG-2 PENETRATION INTO STAIR-2 -
 SECTION 1023.5 FBC B.
 40) M.203C & D: IDENTIFY THE SOURCE OF THE O/A DUCT
 TRUCK SUPPLYING THE VERTICAL HEAT PUMPS (VHP) IN THE
 UNITS AND PROVIDE AUTOMATIC SHUTOFF DAMPERS FOR THE
 SUPPLY AT EACH UNIT- SECTION 107.2.1 WPB AND SECTION
 C403.2.4.3 FBC EC.
 41) M.203C & D: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR WALLS-
 SECTION 607.5.3 FBC M.
 42) M.203C & D: PLACE NOTES TO INDICATE NO COMBUSTIBLE
 MATERIALS PERMITTED IN THE VHP CLOSETS INCLUDING THE
 DOORS- SECTION 602.2.1 FBC M. IT APPEARS THE DOORS WILL
 BE LOUVERED TO ALLOW RETURN AIR TO THE HEAT PUMPS.,
 OTHERWISE INDICATE MEANS OF RETURN AIR- SECTION 601.6
 FBC M.
 43) M.204B: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR/SUITE WALLS-
 SECTION 607.5.3 FBC M.
 44) M.204B: INDICATE WHAT AIR IS BEING RETURNED VIA THE
 54X24 RA DUCT IN THE SHAFT. THE PLAN SHOWS NO DUCTS
 CONNECTING TO IT.
 45) M.204B: FIRE DAMPER MISSING FOR THE 6X6 SUPPLY DUCT
 PENETRATING FIRE-RATED WALL AT THE FIRE LOBBY.
 46) M.204C & D: IDENTIFY THE SOURCE OF THE O/A DUCT
 TRUCK SUPPLYING THE VERTICAL HEAT PUMPS (VHP) IN THE
 UNITS AND PROVIDE AUTOMATIC SHUTOFF DAMPERS FOR THE
 SUPPLY AT EACH UNIT- SECTION 107.2.1 WPB AND SECTION
 C403.2.4.3 FBC EC.
 47) M.204C & D: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR WALLS-
 SECTION 607.5.3 FBC M.
 48) M.205B: SHOW THE O/A AND EXHAUST DUCT RUNS AND
 INLET AND OUTLET LOCATIONS FOR ERU-01- SECTION 107.2.1
 WPB AND SECTIONS 401.4 & 501.3.1 FBC M.
 49) M.205B: FIRE DAMPER MISSING FOR THE 6X6 SUPPLY DUCT
 PENETRATING FIRE-RATED WALL AT THE FIRE LOBBY.
 50) M.205C: SHOW THE O/A AND EXHAUST DUCT RUNS AND
 INLET AND OUTLET LOCATIONS FOR ERU-02- SECTION 107.2.1
 WPB AND SECTIONS 401.4 & 501.3.1 FBC M.
 51) M.205C & D: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR WALLS-
 SECTION 607.5.3 FBC M.
 52) M.205C & D: IDENTIFY THE SOURCE OF THE O/A DUCT
 TRUCK SUPPLYING THE VERTICAL HEAT PUMPS (VHP) IN THE
 UNITS AND PROVIDE AUTOMATIC SHUTOFF DAMPERS FOR THE
 SUPPLY AT EACH UNIT- SECTION 107.2.1 WPB AND SECTION
 C403.2.4.3 FBC EC.
 53) M.206A: PROVIDE AN ENLARGED DRAWING OF THE EPSS
 (EMERGENCY GENERATOR) ROOM SHOWING THE LOCATIONS OF THE
 GENERATOR AND FUEL TANK, FUEL OIL PIPE AND EXHAUST PIPE
 RUNS AND TERMINATION LOCATIONS, AND ALL OTHER
 ASSOCIATED EQUIPMENT INCLUDING EMERGENCY ELECTRICAL
 PANELS ETC. PLEASE INCLUDE THE REQUIRED CLEARANCE
 DISTANCE MEASUREMENTS FOR ALL EQUIPMENT VENT PIPING
 RUNS AND SPECIFICATIONS INCLUDING FILL PIPING
 LOCATIONS.
 A) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR AND THE 190-GALLON FUEL TANK, FUEL PIPING,
 ENGINE EXHAUST PIPE, MUFFLER, AND ALL OTHER ASSOCIATED
 SYSTEM COMPONENTS- SECTION 304.1 FBC M
 B) SUBMIT THE UL 2200 CERTIFICATE OF COMPLIANCE FOR THE
 GENERATOR- SECTION 915.1 FBC M.
 C) THE MANUFACTURER'S SPECIFICATIONS AND/OR UL
 CERTIFICATE SHALL INDICATE THE GENERATOR IS COMPLIANT
 WITH THE NFPA 37 AND NFPA 110 STANDARDS
 D) SUBMIT A CUT SHEET FOR THE FUEL TANK THAT INCLUDES
 THE TANK'S UL LISTING- UL 142 OR UL 2085- SEE SECTION
 21.4.2.1.1 NFPA 30.
 E) REFER TO 4.1 NFPA 110 AND INDICATE THE
 CLASSIFICATION AND LEVEL OF THE EPSS SYSTEM. PLEASE
 INCLUDE THIS INFORMATION IN THE SMOKE CONTROL RATIONAL
 ANALYSIS.
 F) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS AND
 PROVIDE AN EXHAUST PIPE DIAGRAM SHOWING THE TOTAL
 SYSTEM RUN AND LENGTH MEASUREMENT, AND TERMINATION
 LOCATION PLEASE INCLUDE ALL COMPONENTS OF THE SYSTEM
 INCLUDING THE SILENCER, AND ANY CONTRACTOR SUPPLIED
 PIPING- SEE SECTION 8.1 ? 8.4 NFPA 37, AND SECTION
 501.3.1 FBC M.
 G) PROVIDE BACKPRESSURE CALCULATIONS FOR THE GENERATOR
 EXHAUST PIPE RUN- SECTION 304.1 FBC M.
 H) REFER TO SECTIONS 7.7.2,1 &, 7.7.2.3 & 7.7.3 NFPA
 110: PER THE ENGINEER'S PLAN AND NARRATIVE, THE
 VENTILATION AIR FOR THE GENERATOR ROOM IS BEING DRAWN
 IN THROUGH A LOUVERED OPENING IN THE 2HR. FIRE-RATED
 WALL GENERATOR ROOM WALL THAT ADJACENT TO THE PARKING
 GARAGE WHICH IS NOT PERMITTED PER SECTION 7.7.2.1 &
 7.7.2.3. THESE SECTIONS STATE THAT VENTILATION AIR MUST
 BE SUPPLIED DIRECTLY FROM A SOURCE OUTSIDE THE
 BUILDING. SECTION 7.7.2.3 PROHIBITS THE USE OF A FIRE
 DAMPER TO PROTECT THE OPENING, THEREFORE THE
 VENTILATION OPENING LOCATION WOULD NOT BE COMPLIANT
 BECAUSE OPENINGS IN FIRE BARRIERS REQUIRE PROTECTION
 ACCORDING TO SECTION 607.5.2 FBC M. INDICATE HOW
 VENTILATION WILL BE PROVIDED FOR THE GENERATOR/FUEL
 TANK ROOM.
 J) PROVIDE DETAILS AND SPECIFICATIONS FOR NORM AND
 EMERGENCY RELIEF VENTING OF THE TANK, INCLUDING VENT
 PIPING RUNS AND TERMINATION LOCATIONS AT THE EXTERIOR
 OF THE BUILDING- SECTION 24.13 NFPA 30.
 K) M-401: REFER TO SECTION 7.7.1 NFPA 110- 2016 AND
 VERIFY THAT THE VENTILATION AIRFLOW IN THE
 GENERATOR/TANK (EPS) ROOM IS DESIGNED TO LIMIT THE
 MAXIMUM AIR TEMPERATURE IN THE ROOM TO THE MAXIMUM
 AMBIENT AIR TEMPERATURE REQUIRED BY THE GENERATOR
 MANUFACTURER. CONSIDERATION SHALL BE GIVEN TO ALL THE
 HEAT EMITTED TO THE ROOM BY THE ENERGY CONVERTER,
 EXHAUST PIPES, AND ALL OTHER HEAT PRODUCING EQUIPMENT-
 SECTION 7.7.1.1. DESIGN OF THE HEATING, COOLING, AND
 VENTILATION SYSTEM SHALL AMONG OTHER THINGS, INCLUDE
 PROVISIONS FOR FACTORS SUCH AS HEAT, COLD, HUMIDITY,
 LOUVERS, ETC.- SECTION 7.7.7. 57) M.205A, B, C, & D:
 SHOW CLEARANCE DISTANCE MEASUREMENTS FOR O/A INTAKES
 AND EXHAUST OUTLETS IN COMPLIANCE WITH SECTIONS 401.4
 AND 501.3.1 FBC M OR PROVIDE GENERAL KEYNOTES.
 54) M.206A & B: INDICATE WHAT APPLIANCES ARE CONNECTED
 TO THE INTAKE VENT AND EXHAUST FLUE PIPES AT THE H.
 AMENITIES ROOM. SHOW THE APPLIANCES IN THE ROOM,
 PROVIDE EQUIPMENT SCHEDULES ON THE PLAN AND SUBMIT
 MANUFACTURER?S SPECIFICATIONS- SECTIONS 503.1 AND 624.1
 FG. ASSUMING THESE APPLIANCES ARE GAS-FIRED PLEASE
 PROVIDE THE GAS PIPING REQUIREMENTS TO THE MAIN GAS
 PLAN- SECTION 402.1 FBC FG.
 55) M.206B: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR/SUITE WALLS-
 SECTION 607.5.3 FBC M.
 56) M.206B: THE 16X6 O/A DUCT SHALL NOT PENETRATE AND
 RUN THROUGH THE INTERIOR EXIT STAIRWAY- 1023.5 FBC B.
 57) M.206B: THE ERU EXHAUST SHALL TERMINATE OUTDOORS OF
 THE BUILDING. IT APPEARS TO BE EXHAUSTING INTO AN
 INTERSTITIAL SPACE- SECTION 501.3 FBC M.
 58) M.206C: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR WALLS-
 SECTION 607.5.3 FBC M.
 59) M.206C: DUCT DROPS TO ERU-02 ARE MISLABELED AS
 DROPS TO AHU-02- SECTION 107.2.1 FBC M.
 60) M.206C: IN-LINE EXHAUST FANS ARE SHOWN ON EXHAUST
 DUCTS THAT ARE SPECIFIED TO HAVE FIRE WRAPPING WHICH IS
 NOT IN COMPLIANCE WITH EITHER THE FAN OR THE DUCT WRAP
 LISTING AND INSTALLATION INSTRUCTIONS- SECTION 304.1
 FBC M.
 61) M.206C: THE SPF-13 INTAKE DUCT SHALL BE COMPLETELY
 ENCLOSED IN A FIRE-RATED HORIZONTAL ASSEMBLY AS
 REQUIRED BY SECTION 909.20.6.1 FBC B. A FIRE/SMOKE
 DAMPER IS REQUIRED AT SG-3 PENETRATION INTO STAIR-12 -
 SECTION 1023.5 FBC B.
 62) M.207A: FIRE DAMPERS MISSING FOR SUPPLY AND RETURN
 DUCTS FROM AHU-08 & AHU-09 PENETRATING FIRE-RATED WALLS
 AT POOL EQUIP, POOL DECK, FITNESS STUDIO, AND MENS WC
 WALLS- SECTION 607.5.2 FBC M.
 63) M.207A: FIRE DAMPERS MISSING FOR SUPPLY AND RETURN
 DUCTS FROM AHU-08 & AHU-09 PENETRATING FIRE-RATED WALLS
 AT MENS WC AND PREFUNCTION- SECTION 607.5.2 FBC M. A)
 INDICATE THE DIMENSIONS OF THE AHU-09 SUPPLY DUCT.
 64) M.207A: THE EXHAUST DUCT FROM MENS WC AND WOMENS WC
 SHALL DISCHARGE TO THE OUTDOORS- SECTION 501.3 FBC M.
 65) M.207A: AUTOMATIC DAMPERS ARE REQUIRED FOR THE O/A
 INTAKES AT AHU-08 & 09- SECTION C403.2.4.3 FBC EC.
 66) M.207A: PROVIDE EXHAUST VENTILATION CALCULATIONS
 FOR EF-A07 & EF-A09. IT APPEARS ONE OF FANS IS
 CONNECTED TO THE RA DUCT AT AHU-09.
 67) M.207A: IT APPEARS THE PRESSURIZATION DUCTS FROM
 SPF-07, 10, & 15 ARE ENCLOSED IN FIRE WRAPPING. PLEASE
 CLARIFY BY PLACING A NOTE ON THE PLAN- SECTION
 909.20.6.1 FBC B.
 68) M.207A: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE 3-HR FIRE WRAP ENCLOSING THE GENERATOR EXHAUST
 DUCT. TERMINATE DUCT AT THE EXTERIOR WITH AN ENDCAP.
 69) M.207A: PROVIDE AN ENLARGED DRAWING OF THE LAUNDRY
 ROOM THAT SHOWS THE LOCATION OF ALL EQUIPMENT, AND THE
 EXHAUST AND MAKEUP AIR SYSTEM DETAILS AND
 SPECIFICATIONS. SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR THE DRYERS PER SECTION- 504.1 FBC M.
 70) M.207A: INDICATE THE TYPE OF DUCTWORK TO BE USED IN
 THE LAP POOL ROOM- SECTION 603 FBC M.
 71) M.207A: PROVIDE EXHAUST VENTILATION CALCULATIONS
 FOR THE POOL ROOM AND SHOW HOW MAKEUP AIR IS BEING
 PROVIDED- SECTION 501.4 FBC M. CLARIFY IF THE POOL
 EQUIPMENT IS TO BE INSTALLED UNDER SEPARATE PERMIT-
 PLACE A NOTE ON THE PLANS.
 72) M.207B: VERIFY THE EXHAUST AIR LOUVER FOR THE
 FUTURE KITCHEN IS IN COMPLIANCE WITH SECTION 506.3.13.2
 AND 506.3.13.3 FBC M. REFER TO COMMENT #3 FOR MORE
 INFORMATION.
 73) M.207B: FIRE DAMPERS MISSING FOR THE O/A BRANCH
 DUCTS PENETRATING THE FIRE-RATED CORRIDOR WALLS-
 SECTION 607.5.3 FBC M.
 74) M.207B: FIRE/SMOKE DAMPERS REQUIRED AT SG-3
 PRESSURIZATION INLETS AT STAIR-4 AND STAIR-8.
 75) M.207C: FIRE DAMPERS REQUIRED FOR THE AHU-09 SUPPLY
 DUCT AND 36X30 TRANSFER DUCT PENETRATING THE FITNESS
 AND SPA FIRE-RATED WALLS, AND THE 10' DUCT PENETRATING
 THE SPA/FITNESS OFFICE WALL- SECTION 607.5.2 FBC M.
 FIRE WRAPPING OF THE DUCT IN JUST THESE SECTIONS OF THE
 DUCT MUST BE VERIFIED TO BE CONSISTENT WITH THE
 MANUFACTURER'S LISTING AND INSTALLATION INSTRUCTIONS-
 SECTION 304.1 FBC M.
 76) M.207C: NO DIFFUSER IS SHOWN AT THE END OF THE
 16X14 SUPPLY DUCT AT THE SPA- SECTION 603.
 77) M.207C: FIRE DAMPERS MISSING FOR THE LOCKER ROOM
 EXHAUST DUCTS PENETRATING THE FIRE-RATED LOCKER ROOM
 WALLS- SECTION 607.5.3 FBC M.
 79) M.207C: FIRE DAMPERS MISSING FOR THE LOCKER ROOM
 SUPPLY AND RETURN DUCTS PENETRATING THE FIRE-RATED
 LOCKER ROOM WALLS- SECTION 607.5.2 FBC M.
 80) M.207C: IT APPEARS NO O/A HAS BEEN PROVIDED FOR
 UNITS A6, B1, AND S6- TABLE 403.3.1.1. FBC M.
 81) M.207D: FIRE DAMPERS MISSING AT THE DUCTS
 PENETRATING THE CORRIDOR/WOMENSWC/MENSWC FIRE RATED
 WALLS- SECTION 607.5.2 FBC M.
 82) M.208A: LABEL THE PRESSURIZATION FAN SHOWN AT THE
 UNIDENTIFIED INTERIOR EXIT STAIRWAY THE INTAKE DUCT
 SHALL BE COMPLETELY ENCLOSED IN A FIRE-RATED HORIZONTAL
 ASSEMBLY AS REQUIRED BY SECTION 909.20.6.1 FBC B. A
 FIRE/SMOKE DAMPER IS REQUIRED AT THE DIFFUSER
 PENETRATION INTO THE STAIRWAY- SECTION 1023.5 FBC
 83) M.208A: FIRE DAMPERS AND O/A DAMPER MISSING AT THE
 28X28 INTAKE DUCT PENETRATING INTO THE STORAGE ROOM
 84) M.208A: FIRE DAMPERS MISSING FOR THE TENNIS COURTS
 SUPPLY AND RETURN DUCTS PENETRATING INTO THE STORAGE
 ROOM.
 85) M.208AAC SYSTEM FOR THE TENNIS COURTS IN THE
 STORAGE ROOM NOT IDENTIFIED.
 86) M.208C: IT APPEARS NO O/A HAS BEEN PROVIDED FOR
 UNITS B1, B2, B3, & A4- TABLE 403.3.1.1. FBC M.
 87) M.208C: FIRE DAMPERS MISSING FOR THE 18X14 SUPPLY
 AND RETURN DUCTS PENETRATING THROUGH THE FIRE-RATED
 CORRIDOR WALL- SECTION 607.5.3 FBC M.
 88) M.208D: FIRE DAMPERS MISSING FOR THE BRANCH DUCT
 PENETRATING THE FIRE LOBBY WALL, AND ALL OTHER BRANCH
 DUCTS PENETRATING FIRE-RATED CORRIDOR WALLS- SECTION
 607.5.2 & 607.5.3 FBC M.
  
 HOTEL TOWER
 89) SHEETS M.209, M.211, & M.212: DUCT SMOKE DETECTORS
 ARE REQUIRED IN THE SUPPLY SYSTEMS OF THE AHU'S PER
 SECTION 606.2.1 FBC M. PLEASE PROVIDE DS SYMBOLS ON THE
 PLANS AND RISER DRAWINGS TO SHOW THE LOCATIONS.
 91) M.209, M.211, M.212: DUCT SMOKE DETECTORS ARE
 REQUIRED IN THE SUPPLY SYSTEMS OF THE 100% O/A ERU
 SYSTEMS, AND AT EACH STORY OF THE RA/EA RISER- SECTION
 606.2.3. PLEASE PROVIDE DS SYMBOLS ON THE PLANS AND
 RISER DRAWINGS TO SHOW THE LOCATIONS.
 92) M.209, M.211, M.212: PROVIDE A FIRE-RATED ENCLOSURE
 AND ACCESS PANEL FOR THE DEF'S AND SUBMIT SPECS FOR THE
 FAN AND THE EXHAUST DUCT FIRE WRAPPING- SECTIONS 304.1
 & 306.1. A) REFER TO SECTION 504.1 AND SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE CLOTHES DRYERS.
 PROVIDE ON THE PLANS DRYER EXHAUST DUCT DIAGRAMS THAT
 SHOW THE TOTAL RUN LENGTHS OF THE SYSTEMS CONSISTENT
 WITH THE MANUFACTURER'S GUIDELINES. B) REFER TO SECTION
 504.9 AND PROVIDE A SEQUENCE OF OPERATION FOR THE
 DEF?S.
 93) M.209, M.211, M.212: FIRE DAMPERS MISSING FOR THE
 O/A BRANCH DUCTS AND TOILET EXHAUST DUCTS PENETRATING
 THE FIRE-RATED CORRIDOR/SUITE WALLS- SECTION 607.5.3
 FBC M.
 94) M.209, M.211, M.212: SHOW CLEARANCE DISTANCE
 MEASUREMENTS FOR THE EXHAUST OUTLETS IN COMPLIANCE WITH
 SECTIONS 501.3.1 FBC M OR PROVIDE GENERAL KEYNOTES.
 95) M.209, M.211, M.212: REFER TO SECTION 306.1 AND
 VERIFY ACCESS IS PROVIDED FOR AC AND FAN UNITS LOCATED
 ABOVE HARD CEILING. SHOW AN ACCESS PANEL WITH
 DIMENSIONS ON THE DRAWINGS WHERE REQUIRED- SECTION
 306.1 FBC M.
 96) M.209, M.211, M.212: INDICATE LOCATIONS OF ABOVE
 CEILING PLENUMS AND AIR HANDLER CLOSETS AND NOTE NO
 COMBUSTIBLE MATERIALS PERMITTED.
 97) M.209, M.211, M.212: BRANCH DUCT SIZES NOT SHOWN-
 SECTION 603.1 FBC M.
 98) M.209, M.211, M.212: AUTOMATICALLY OPERATING
 SHUTOFF DAMPERS ARE REQUIRED FOR THE O/A DUCTS SERVING
 THE SUITES- SECTION C403.2.4.3 FBC EC.
  
 OFFICE TOWER
 100) SHEETS M.213, M.214, M.215: INCOMPLETE PLANS AND
 DETAILS. IT APPEARS THAT OFFICE SHELL SPACES ARE
 DEPICTED HOWEVER THERE ARE NO NOTES TO CLARIFY. PLEASE
 LABEL ALL THE ROOMS SHOWN ON THE PLAN- SECTION 107.2.1
 WPB.
 101) M.213, M.214, M.215: LABEL THE SYSTEMS IN THE MECH
 RM- SECTION 107.2.1 WPB.102)
 102) M.213, M.214, M.215: FIRE/SMOKE DAMPERS MISSING
 FOR THE 64X28 SUPPLY AND RETURN DUCTS PENETRATING THE
 FIRE-RATED MECH RM WALLS- SECTION 607.5.3 FBC M.
 103) M.213, M.214, M.215: NO O/A OR CONDITIONING HAS
 BEEN PROVIDED IN THE FIRE AND ELEVATOR LOBBIES- SECTION
 107.2.1 WPB.
 104): M.213, M.214, M.215: DUCT SMOKE DETECTORS ARE
 REQUIRED IN THE SUPPLY SYSTEMS OF THE AHU'S PER SECTION
 606.2.1 FBC M. PLEASE PROVIDE DS SYMBOLS ON THE PLANS
 AND RISER DRAWINGS TO SHOW THE LOCATIONS.
 105) M.213, M.214, M.215: DUCT SMOKE DETECTORS ARE
 REQUIRED IN THE SUPPLY SYSTEMS OF THE 100% O/A ERU
 SYSTEMS, AND AT EACH STORY OF THE RA/EA RISER- SECTION
 606.2.3. PLEASE PROVIDE DS SYMBOLS ON THE PLANS AND
 RISER DRAWINGS TO SHOW THE LOCATIONS.
 106) M.216: LABEL ALL ROOMS AND AREAS SHOWN ON THE
 PLANS- SECTION 107.2.1 WPB.
 107) M.216: FIRE DAMPERS MISSING FOR ERU-03 SUPPLY AND
 RETURN DUCTS PENETRATING THE FIRE-RATED MECHANICAL ROOM
 WALLS- SECTION 607.5.3 FBC M.
 108) M.216: NO O/A OR CONDITIONING HAS BEEN PROVIDED IN
 THE FIRE AND ELEVATOR LOBBIES- SECTION 107.2.1 WPB.
 109) M.216: LABEL THE AIR INLET OPENING AT THE ERU-03
 MECHANICAL ROOM- SECTION 107.2.1 WPB.
 110) M.216: IT APPEARS THE SMOKE PURGE EXHAUST AND
 ERU-03 RETURN DUCTS ARE CONNECTED OR IN THE SAME SHAFT-
 PLEASE CLARIFY- SECTION 107.2.1 WPB.
 110) M.216: PROVIDE ENLARGED DRAWINGS OF THE CHILLER
 MECHANICAL ROOMS AND SHOW HOW THE ROOMS ARE BEING
 VENTILATED PER SECTIONS 1105.6 FBC M. A) PROVIDE NORMAL
 AND EMERGENCY VENTILATION CALCULATIONS AND DETAILS-
 SECTIONS 1105.6.3.1 & 1105.6.3.2 FBC M. C) SHOW THE
 LOCATIONS OF REFRIGERANT DETECTORS AND SUBMIT
 MANUFACTURER'S SPECIFICATIONS. D) SHOW HOW THE CHILLERS
 ARE BEING ANCHORED TO THE STRUCTURE. E) LABEL ALL
 EQUIPMENT IN THE ROOM AND PROVIDE AN EQUIPMENT
 SCHEDULE.
 111) M.216: PROVIDE AN ENLARGED DRAWING OF THE COOLING
 TOWER ROOM AND SHOW HOW THE ROOM IS BEING VENTILATED-
 NATURALLY OR MECHANICALLY- PROVIDE CALCULATIONS AND
 DETAILS. A) SHOW VAPOR PLUME DISCHARGE LOCATIONS AND
 REQUIRED CLEARANCE DISTANCES PER SECTION 908.3 FBC M.
 B) SHOW HOW THE TOWERS ARE BEING ANCHORED TO THE
 STRUCTURE- SECTION 908.4 FBC M (ENGINEERING FOR SUPPORT
 AND PLATFORM STRUCTURES MAY BE DEFERRED). C) PROVIDED
 WATER PIPING SUPPLY AND RETURN DIAGRAMS. D) SHOW THE
 WATER FEED LINE PIPE AND BACKFLOW PREVENTER
 CONNECTIONS- SECTION 908.5 FBC M.
 112) M.217: CLARIFY IF THE ELEVATOR HOISTWAYS ARE TO BE
 VENTILATED AND PROVIDE DETAILS- SECTION 909.21.2 FBC B.
 113) M.216 & M.217: SHOW THE LOCATION OF THE ELEVATOR
 CONTROL ROOM AND SHOW COMPLIANCE WITH SECTION 3005.2
 FBC B FOR INDEPENDENT VENTILATION SYSTEMS.
  
 RESIDENTIAL TOWER
 114) SHEETS M.218, M.219, M.220, & M.221: DUCT SMOKE
 DETECTORS ARE REQUIRED IN THE SUPPLY SYSTEMS OF THE
 AHU'S PER SECTION 606.2.1 FBC M. PLEASE PROVIDE DS
 SYMBOLS ON THE PLANS AND RISER DRAWINGS TO SHOW THE
 LOCATIONS.
 115) M.218, M.219, M.220, & M.221: DUCT SMOKE DETECTORS
 ARE REQUIRED IN THE SUPPLY SYSTEMS OF THE 100% O/A ERU
 SYSTEMS, AND AT EACH STORY OF THE RA/EA RISER- SECTION
 606.2.3. PLEASE PROVIDE DS SYMBOLS ON THE PLANS AND
 RISER DRAWINGS TO SHOW THE LOCATIONS.
 116) M.218, M.219, M.220, & M.221: INDICATE HOW O/A IS
 BEING PROVIDED TO THE UNITS AND PROVIDE CALCULATIONS-
 SECTION 401.2 FBC M.
 117) M.218, M.219, M.220, & M.221: SHOW CLEARANCE
 DISTANCE MEASUREMENTS FOR THE TOILET AND DRYER EXHAUST
 OUTLETS IN COMPLIANCE WITH SECTIONS 501.3.1 FBC M OR
 PROVIDE GENERAL KEYNOTES.
 118) M.218, M.219, M.220, & M.221: REFER TO SECTION
 306.1 AND VERIFY ACCESS IS PROVIDED FOR AC AND FAN
 UNITS LOCATED ABOVE HARD CEILING. SHOW AN ACCESS PANEL
 WITH DIMENSIONS ON THE DRAWINGS WHERE REQUIRED- SECTION
 306.1 FBC M.
 119) M.218, M.219, M.220, & M.221: INDICATE LOCATIONS
 OF ABOVE CEILING PLENUMS AND AIR HANDLER CLOSETS AND
 NOTE NO COMBUSTIBLE MATERIALS PERMITTED.120
 120) M.218, M.219, M.220, & M.221: BRANCH DUCT SIZES
 NOT SHOWN- SECTION 603.1 FBC M.
 121) M.218, M.219, M.220, & M.221: AUTOMATICALLY
 OPERATING SHUTOFF DAMPERS WILL BE REQUIRED FOR O/A
 DUCTS SERVING THE UNITS- SECTION C403.2.4.3 FBC EC.
 122) M.218, M.219, M.220, & M.221: PROVIDE VENTILATION
 FOR THE CORRIDORS, ELEVATOR AND FIRE LOBBIES- TABLE
 403.3.1.1 FBC M.
 123) M.220: NO DUCT LAYOUT PLANS PROVIDED- SECTION
 107.2.1 FBC M.
 124) M.218, M.219, M.220, & M.221: REFER TO SECTION
 504.1 AND SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 CLOTHES DRYERS. PROVIDE ON THE PLANS DRYER EXHAUST DUCT
 DIAGRAMS THAT SHOW THE TOTAL RUN LENGTHS OF THE SYSTEMS
 CONSISTENT WITH THE MANUFACTURER'S GUIDELINES.
 125) M.222: PROVIDE ENLARGED DRAWINGS OF THE MECHANICAL
 ROOM AND SHOW HOW THE ROOMS IS BEING VENTILATED PER
 SECTIONS 1105.6 FBC M. A) PROVIDE NORMAL AND EMERGENCY
 VENTILATION CALCULATIONS AND DETAILS- SECTIONS
 1105.6.3.1 & 1105.6.3.2 FBC M. C) SHOW THE LOCATIONS OF
 REFRIGERANT DETECTORS AND SUBMIT MANUFACTURER'S
 SPECIFICATIONS. D) SHOW HOW THE CHILLERS ARE BEING
 ANCHORED TO THE STRUCTURE. E) LABEL ALL EQUIPMENT IN
 THE ROOM AND PROVIDE AN EQUIPMENT SCHEDULE. E) PROVIDE
 MANUFACTURER?S SPECIFICATIONS FOR THE BOILERS- SECTION
 631.1 FBC FG. PLEASE NOTE THAT OPEN FAME GAS EQUIPMENT
 SHALL NOT USE COMBUSTION AIR FROM THE MACHINERY ROOM-
 SECTION 1105.5 FBC FG.
 126) M.222: PROVIDE AN ENLARGED DRAWING OF THE COOLING
 TOWER ROOM AND SHOW HOW THE ROOM IS BEING VENTILATED-
 NATURALLY OR MECHANICALLY- PROVIDE CALCULATIONS AND
 DETAILS. A) SHOW VAPOR PLUME DISCHARGE LOCATIONS AND
 REQUIRED CLEARANCE DISTANCES PER SECTION 908.3 FBC M.
 B) SHOW HOW THE TOWERS ARE BEING ANCHORED TO THE
 STRUCTURE- SECTION 908.4 FBC M (ENGINEERING FOR SUPPORT
 AND PLATFORM STRUCTURES MAY BE DEFERRED). C) PROVIDED
 WATER PIPING SUPPLY AND RETURN DIAGRAMS. D) SHOW THE
 WATER FEED LINE PIPE AND BACKFLOW PREVENTER
 CONNECTIONS- SECTION 908.5 FBC M.
 127) M.222: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE GENERATOR, FUEL PIPING, ENGINE EXHAUST PIPE,
 MUFFLER, AND ALL OTHER ASSOCIATED SYSTEM COMPONENTS-
 SECTION 304.1 FBC M. A) SUBMIT THE UL 2200 CERTIFICATE
 OF COMPLIANCE FOR THE GENERATOR- SECTION 915.1 FBC M.
 THE MANUFACTURER'S SPECIFICATIONS AND/OR UL CERTIFICATE
 SHALL INDICATE THE GENERATOR IS COMPLIANT WITH THE NFPA
 37 AND NFPA 110 STANDARDS. B) SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE FUEL TANK THAT INCLUDES THE
 TANK'S UL LISTING- UL 142 OR UL 2085- SEE SECTION
 21.4.2.1.1 NFPA 30. C) REFER TO 4.1 NFPA 110 AND
 INDICATE THE CLASSIFICATION AND LEVEL OF THE EPSS
 SYSTEM. PLEASE INCLUDE THIS INFORMATION IN THE SMOKE
 CONTROL RATIONAL ANALYSIS. D) SUBMIT THE GENERATOR
 EXHAUST PIPE SPECIFICATIONS AND PROVIDE AN EXHAUST PIPE
 DIAGRAM SHOWING THE TOTAL SYSTEM RUN AND LENGTH
 MEASUREMENT, AND TERMINATION LOCATION PLEASE INCLUDE
 ALL COMPONENTS OF THE SYSTEM INCLUDING THE SILENCER,
 AND ANY CONTRACTOR SUPPLIED PIPING- SEE SECTION 8.1.
 8.4 NFPA 37, AND SECTION 501.3.1 FBC M. E) PROVIDE
 DETAILS AND SPECIFICATIONS FOR NORMAL AND EMERGENCY
 RELIEF VENTING OF THE TANK, INCLUDING VENT PIPING RUNS
 AND TERMINATION LOCATIONS- SECTION 24.13 NFPA 30.
 128) M.222: PROVIDE WIND LOAD ENGINEERING FOR
 ATTACHMENT OF THE GENERATOR TO THE ROOF STRUCTURE-
 SECTION 301.15 FBC M.
 129) M.223: SHOW THE LOCATIONS OF THE ELEVATOR CONTROL
 ROOMS AND SHOW COMPLIANCE WITH SECTION 3005.2 FBC B FOR
 INDEPENDENT VENTILATION SYSTEMS.
  
 HOTEL SUITES:
 130) M.250- M.253: SHOW HOW O/A IS BEING PROVIDED TO
 THE SUITES- SECTION 401.2 FBC M, AND HOW IT IS BEING
 AUTOMATICALLY CONTROLLED- SECTION C403.2.4.3 FBC EC.
 131) M.250- M.253: REFER TO SECTION 306.1 AND VERIFY
 ACCESS IS PROVIDED FOR THE FCU'S LOCATED ABOVE HARD
 CEILINGS OR IN CLOSETS. SHOW AN ACCESS PANEL WITH
 DIMENSIONS ON THE DRAWINGS WHERE REQUIRED- SECTION
 306.1 FBC M.
 132) M.250- M.253: INDICATE LOCATIONS OF ABOVE CEILING
 PLENUMS AND AIR HANDLER PLENUM CLOSETS AND NOTE NO
 COMBUSTIBLE MATERIALS PERMITTED.
  
 RESIDENTIAL UNITS
 133) M.254- M.258: LABEL ALL ROOMS AND SPACES ON THE
 PLANS- SECTION 107.2.1 WPB.
 134) M.254- M.258: SHOW HOW O/A IS BEING PROVIDED TO
 THE UNITS- SECTION 401.2 FBC M, AND HOW IT IS BEING
 AUTOMATICALLY CONTROLLED- SECTION C403.2.4.3 FBC EC.
 135) M.254- M.258: PLACE NOTES TO INDICATE NO
 COMBUSTIBLE MATERIALS PERMITTED IN THE VHP CLOSETS
 INCLUDING THE DOORS- SECTION 602.2.1 FBC M. IT APPEARS
 THE DOORS WILL BE LOUVERED TO ALLOW RETURN AIR TO THE
 HEAT PUMPS, OTHERWISE INDICATE MEANS OF RETURN AIR-
 SECTION 601.6 FBC M.
 136) M.254- M.258: INDICATE HOW AIR IS BEING RETURNED
 FROM THE BEDROOMS- SECTION 601.6.
 137) M.254- M.258: REFER TO SECTION 504.1 AND SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE CLOTHES DRYERS.
 PROVIDE ON THE PLANS DRYER EXHAUST DUCT DIAGRAMS THAT
 SHOW THE TOTAL RUN LENGTHS OF THE SYSTEMS CONSISTENT
 WITH THE MANUFACTURER'S GUIDELINES.
 138) M.254- M.258: PROVIDE AN ENLARGED DRAWING OF THE
 VHP CLOSETS SHOWING REQUIRED CLEARANCES- SECTION
 C403.2.9.3.3 FBC EC, AND PRIMARY AND SECONDARY MEANS OF
 CONDENSATE DISPOSAL- SECTION 307.2.1, 307.2.2, &
 307.2.3 FBC M.
 139) PROVIDE A CONDENSATE DISPOSAL RISER DRAWING- TABLE
 307.2.2 FBC M.
 140) PROVIDE FIRESTOPPING DETAILS FOR CHILLED AND HOT
 WATER PIPES, AND DUCTWORK.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  