| Plan Review Notes For Permit 18100526 |
| Permit Number |
18100526 |
|
| Review Stop |
NFIP |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-09-23 09:09:21 | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE | | | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD | | | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE | | | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL | | | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT | | | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE | | | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD | | | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. | | | FIRST, A PRECONSTRUCTION ELEV. CERT. BASED ON THE | | | CONSTRUCTION DRAWING. SECOND, A CONSTRUCTION ELEV. | | | CERT. BASED ON THE LOWEST FLOOR FORMS. THIRD A FINAL | | | ELEV. CERT. BASED ON THE FINISHED BUILDING. PLEASE | | | SUBMIT THE PRECONSTRUCTION ELEVATION CERTIFICATE AT | | | THIS TIME. THE CITY'S FLOOD ORDINANCE ARTICLE XVII - | | | FLOOD PREVENTION AND CONTROL SEC. 94-546 - PROVISIONS | | | FOR FLOOD HAZARD REDUCTION. | | | NOTE: THE PRECONSTRUCTION ELEVATION THAT WAS SUBMITTED | | | HAS ERRORS AND A CORRECTED ONE IS REQUIRED BEFORE THE | | | PERMIT TO BEGIN VERTICAL CONSTRUCTION IS ISSUED. THE | | | BASE FLOOD ELEVATION IS 6' ON THE FORM AND IT SHOULD BE | | | 7' NAVD 88. THERE IS AN ATTACHED GARAGE WITH AN | | | ELEVATION OF 9.0' NAVD 88. |
|