| Plan Review Notes For Permit 18100526 |
| Permit Number |
18100526 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2019-08-12 06:16:59 | GAS 1ST REVIEW **DENIED**18100526 | | | | | | 1) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3. GAS | | | APPLIANCES SHALL BE LISTED AND LABELED. THE | | | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT | | | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC | | | SEC.305.1 | | | 2) SHT. P5.115 CALLS OUT FOR L.P CSST PIPING BUT NO | | | SIZING CHART PROVIDED I AM UNABLE TO LOCATE ANY L.P GAS | | | ON THE PLAN. PLEASE CLARIFY. FBC 107.2.1 | | | | | | TIM HUNT | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-248-2703 | | | [email protected] | | | | | | |
|