| 2018-10-15 10:57:30 | 1) SHOW 6 INCH DIP LATERAL AND ASSOCIATED ON-SITE FIRE |
| | HYDRANT. BOTH ARE IN VINCINITY OF PROPOSED PARKING LOT |
| | IMPROVEMENTS. |
| | 2) THERE ARE WATER AND SEWER LINES IN THE VICINITY OF |
| | THIS PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE |
| | STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT |
| | LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY |
| | CONSTRUCTION OR DEMOLITION WORK. MORE INFORMATION CAN |
| | BE FOUND HERE: HTTP://WWW.SUNSHINE811.COM/ |
| | 3) COMPLY WITH WPB PARKING DETAILS (ATTACHED TO |
| | APPLICATION PACKAGE FOR YOUR USE). |
| | |
| | THE FOLLOWING COMMENTS ARE FROM TRACY WARD, SENIOR |
| | STORMWATER ENGINEER, CITY OF WPB ENGINEERING SERVICES, |
| | 561-494-1120 |
| | SHEET C-1 |
| | 1) IS PARKING LOT ENTRANCE TOO CLOSE TO ROAD RIGHT OF |
| | WAY (15 FEET)? |
| | SHEET C-2 |
| | 1) DRAWINGS PROPOSE 12? HDPE PIPE BETWEEN SECTIONS OF |
| | 15? PERFORATED PIPE. PLEASE REVISE. |
| | 2) CONSIDER SHORTENING PARKING SPACES TO 16? SINCE |
| | CURBING IS ALREADY BEING USED. |
| | SHEET C-3 |
| | 1) H2 IS DEPTH TO WATER TABLE OR TRENCH, WHICHEVER IS |
| | LESS. IT IS MEASURED FROM THE CONTROL ELEVATION (WEIR) |
| | OR THE MINIMUM GRATE ELEVATION. SINCE THERE IS NO |
| | OUTFALL, THE MINIMUM GRATE ELEVATION IS USED (14.80). |
| | TOP OF TRENCH ELEVATION IS SHOWN AS 13.50, AND TRENCH |
| | IS 4 FEET DEEP. BOTTOM OF TRENCH IS 13.50 ? 4 = 9.50. |
| | H2 = 14.80 ? 9.50 = 5.3. VOLUME TREATED = 1780 C.F. |
| | LESS THAN 15.16 C.F. IS OK. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | RICK ROSSANO |
| | PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1098 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 246-9525 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | MANNY GONZALEZ |
| | SENIOR ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |