| 2019-07-14 09:17:55 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE VACUUM |
| | PUMPS AND AIR COMPRESSORS, THE MUFFLER/INTAKE AND ALSO |
| | FOR THE RECEIVERS, DRYERS, AFTERCOOLERS, ETC.IF THEY |
| | ARE BEING REPLACED WITH NEW. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 2) THE VACUUM PUMPS SHALL BE PROVIDED WITH |
| | ANTIVIBRATION MOUNTINGS PERR NFPA 99 SEC.5.1.3.7.2.2. |
| | 3) SHOW THE TERMINATION POINT OF THE VACUUM PUMP VENT |
| | LINE. THE DISCHARGE SHALL BE A MINIMUM OF 25 FEET FROM |
| | ANY DOOR, WINDOW, AIR INTAKE, OR OTHER OPENINGS IN |
| | BUILDINGS. NFPA 99 SEC.5.1.3.7.6.2. |
| | 4) THE MEDICAL AIR INTAKE SHALL BE LOCATED A MINIMUM OF |
| | 25 FEET FROM VENTILATING SYSTEM EXHAUSTS, PLUMBING |
| | VENTS, VACUUM DISCHARGES, OR OTHER AREAS THAT CAN |
| | COLLECT OTHER NOXIOUS FUMES. NFPA 99 SEC. 5.1.3.6.3.11. |
| | 5) MEDICAL AIR DRYERS SHALL BE PROVIDED WITH |
| | ANTIVIBRATION MOUNTINGS PER NFPA 99 SEC. 5.1.3.6.3.7 |
| | (4). |
| | 6) SHT.P002 - DETAIL # 7 - A PRESSURE INDICATOR(S) |
| | SHALL BE LOCATED DOWNSTREAM OF EACH REGULATOR OR |
| | IMMEDIATELY DOWNSTREAM OF THE ISOLATING VALVES FOR THE |
| | REGULATORS PER NFPA 99 SEC. 5.1.3.5.5.1 (3). |
| | 7) SUBMIT RISER DIAGRAMS FOR ALL THE MEDICAL GAS PIPING |
| | TO BE INSTALLED. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 8) SHT. P002 - DETAIL #7 - THE PRESSURE RELIEF VALVES |
| | ON THE COMPRESSED AIR SYSTEM SHALL BE VENTED IN |
| | ACCORDANCE WITH NFPA 99 SEC. 5.1.3.5.6.1 (4). |
| | 9) IDENTIFY THE CONTINUATION POINTS OF THE MEDICAL GAS |
| | PIPING ON THE REQUESTED MEDICAL GAS RISER DIAGRAMS. WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | 10) THE AREA(S) HOUSING THE VACUUM PUMP AND AIR |
| | COMPRESSOR SHALL BE VENTILATED PER NFPA 99 |
| | SECS.5.1.3.3.3.3, 5.1.3.6.3.1, 5.1.3.7.1.1. |
| | 11) THE NEW OUTDOOR ENCLOSURE FOR THE MEDICAL GAS SHALL |
| | BE VENTILATED PER NFPA 99 SEC.5.1.3.3.3.4 (1). |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |