| 2019-02-21 10:17:58 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | |
| | 1) SHEET D 110 - THERE ARE NO INDICATIONS THAT THE LIFE |
| | SAFETY SYSTEMS SHALL BE MAINTAINED DURING DEMO AND/OR |
| | THROUGHOUT CONSTRUCTION. |
| | |
| | IT IS OF THE UTMOST IMPORTANCE THAT THE FIRE ALARM AND |
| | FIRE SPRINKLER BE MAINTAINED AT ALL TIMES. |
| | |
| | PLEASE PROVIDE A NOTE OF ACKNOWLEDGEMENT. |
| | |
| | |
| | |
| | 2) SHEET A 575 - THERE ARE INDICATIONS OF CARDER |
| | READERS AND ACCESS CONTROL WITHIN THE DOOR SCHEDULE. |
| | |
| | CARD READER AND ACCESS CONTROL SHALL BE INSTALLED UNDER |
| | SPEARATE PERMIT AND SHOP DRAWINGS. |
| | |
| | ALL DEVICES AND EQUIPMENT FOR CARD READERS AND ACCESS |
| | CONTRAL SHALL FUNCTION/OPERATE UNDER THE REQUIREMENTS |
| | OF NFPA 101, CHAPTER 7, MEANS OF EGRESS. |
| | |
| | PLEASE PROVIDE A NOTE OF ACKNOWLEDGEMENT. |
| | |
| | |
| | |
| | 3) SHEET FP 001 - THERE ARE INDICATIONS OF FIRE |
| | SPRINKLER WORK. |
| | |
| | ALL FIRE SPRINKLER WORK, DEMO THRU NEW CONSTRUCTION, |
| | SHALL BE DONE UNDER SEPARATE PERMIT AND SHOP DRAWINGS |
| | BY CERTIFIED FIRE SPRINKLER CONTRATORS. |
| | |
| | PLEASE PROVIDE A NOTE OF ACKNOWLEDGEMENT. |
| | |
| | |
| | |
| | 4) SHEET E 000 - THERE ARE NO INDICATIONS OF FIRE ALARM |
| | DEVICES/ EQUIPMENT OR FIRE ALARM WORK. |
| | |
| | ALL FIRE ALARM WORK, DEMO THRU NEW CONSTRUCTION, SHALL |
| | BE DONE UNDER SEPARATE PERMIT AND SHOP DRAWINGS BY |
| | CERTIFIED FIRE ALARM CONTRATORS. |
| | |
| | PLEASE PROVIDE A NOTE OF ACKNOWLEDGEMENT. |
| | |
| | |
| | 5) SHEET G 410 - THERE IS AN INDICATION OF A TEMPORARY |
| | AMBULANCE CANOPY. THERE IS NO DETAIL PLAN SHEET OR |
| | CALL-OUT DRAWING. |
| | |
| | IF THIS A TENT STRUCTURE, IS THE FABRIC FIRE RETARDENT, |
| | SIZE, HEIGHT, SIDES, LIGHTING, ETC.? |
| | |
| | ANY TEMPORAY TENT STRUCTURE SHALL BE INSTALLED UNDER |
| | SEPARATE PERMIT AND SHOP DRAWINGS THAT INCLUDE, THE |
| | ABOVE. |
| | |
| | PLEASE PROVIDE DETAILS AND/OR A NOTE OF |
| | ACKNOWLEDGEMENT. |
| | |
| | |
| | |
| | 6) SHEET G 410 - A CONSTRUCTION BARRIER IS INDICATED. |
| | THERE IS NO DETAIL PLAN SHEET OR CALL-OUT DRAWING. |
| | |
| | WILL THIS AREA BE CONSTRUCTION MATERIAL, HAVE LIGHTING, |
| | EXIT SIGNAGE, SIDES, SPRINKLER PROTECTION, FIRE ALARM |
| | DEVICES, ETC. |
| | |
| | PLEASE PROVIDE DETAILS. |
| | |
| | |
| | |
| | 7) SHEET G 410 - A TEMPORARY PUB ED CANOPY IS |
| | INDICATED. WHAT IS THE PURPOSE AND OCCUPANCY |
| | CLASSIFICATION OF THIS CANOPY? |
| | |
| | EDUCATION CLASSROOM, ASEEMBLY GATHERING AREA,? HOW WILL |
| | IT BE CONSTRUCTED? IS IT TEMPORARY TENT WITH SIDES? |
| | |
| | ANY TEMPORAY TENT STRUCTURE SHALL BE INSTALLED UNDER |
| | SEPARATE PERMIT AND SHOP DRAWINGS THAT INCLUDE, THE |
| | ABOVE. |
| | |
| | PLEASE PROVIDE DETAILS AND/OR A NOTE OF |
| | ACKNOWLEDGEMENT. |
| | |
| | |
| | |
| | 8) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 9)ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |