| 2018-12-06 10:03:47 | RESIDENTIAL (R3) SECOND BUILDING REVIEW CHECKLIST. |
| | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. |
| | |
| | ORIGINAL COMMENT: |
| | 1- PROVIDE SHUTTERS COMPLETE INSTALLATION SCHEDULE AS |
| | REQUIRED BY CITY IMPLEMENTATION STANDARD FOR WIND-BORNE |
| | DEBRIS IMPACT PROTECTION FOR THE FLORIDA BUILDING CODE. |
| | SEE CITY SAMPLE. ALL THE COLUMNS NEED TO BE COMPLETED. |
| | ALTERNATIVELY, YOU MAY PROVIDE COMPLETE INSTALLATION |
| | SCHEDULE IN ANY OTHER FORMAT AS LONG AS ALL THE |
| | REQUIRED INFORMATION IS PROVIDED. |
| | NOTE: IT LOOKS LIKE THE PROPOSED ACCORDION SHUTTERS ARE |
| | GOING TO BE INSTALLED ON THE SECOND FLOOR. I BELIEVE |
| | THE SECOND FLOOR OF THESE HOUSES ARE WOOD FRAMED. |
| | (CONTRACTOR TO VERIFY) TAKE THIS INTO CONSIDERATION |
| | WHEN COMPLETING THE INSTALLATION SCHEDULE TO AVOID |
| | CONFLICTS/DELAYS. PROPOSED INSTALLATION WILL BE |
| | REVIEWED WHEN COMPLETE SHUTTERS INSTALLATION SCHEDULE |
| | IS PROVIDED. |
| | |
| | RESPONSE: |
| | REVISE SHUTTERS INSTALLATION SCHEDULE SUBMITTED: |
| | A) THE DESIGN PRESSURES DON'T MATCH DESIGN PRESSURES |
| | MARKED ON THE ENGINEERED DESIGN PRESSURES SUBMITTED. |
| | REVISE AS REQUIRED TO MATCH. AND, REVISE ANCHOR SPACING |
| | (TOP AND BOTTOM) ACCORDINGLY. SEC. R301.1 |
| | FBC-RESIDENTIAL. |
| | NOTE: COORDINATE WITH ITEM #2 BELOW. BASED ON THE KEY |
| | PLAN SUBMITTED OPENINGS #1, 2 AND 5 ARE LOCATED IN |
| | LOCATION ZONE 5. (FIGURE R301.2(7) OF FBC-RESIDENTIAL |
| | ALL OPENINGS WITHIN 4 FEET OF END OF WALL ARE |
| | CONSIDERED ZONE 5). |
| | |
| | B) GLASS SEPARATION OF 2-3/4" REQUIRES ONE LOCK AND TWO |
| | LOCKING RODS OR TWO LOCKS. SEE SEPARATION TO GLASS |
| | REQUIREMENTS ON SHEET 11 OF 20 OF SHUTTER DRAWINGS |
| | SUBMITTED. CLARIFY IF USING ONE LOCK AND TWO LOCKING |
| | RODS OR TWO LOCKS ( CONTRACTOR ONLY HIGHLIGHTED THE HV |
| | LOCK ON SHEET 3 OF 20). SEC. 107.2.1 CITY AMENDMENTS. |
| | |
| | C) CLARIFY SHUTTER SPAN DIMENSION SHOWN ON COLUMN SIX |
| | OF INSTALLATION SCHEDULE SUBMITTED. SEE TYPICAL BLADE |
| | SHUTTER ELEVATION ON SHEET 5 OF 20 OF SHUTTERS DRAWINGS |
| | SUBMITTED FOR CORRECT WAY OF DIMENSIONING THE SHUTTER |
| | SPAN AND REVISE AS REQUIRED. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | |
| | |
| | ORIGINAL COMMENT: |
| | 2- ACCORDING TO KEY PLAN SUBMITTED, IT LOOKS LIKE SOME |
| | OPENINGS ARE LOCATED IN THE END ZONE #5. USE THE |
| | CORRESPONDING DESIGN PRESSURES WHEN COMPLETING THE |
| | INSTALLATION SCHEDULE. SEC. R301.1 FBC-RESIDENTIAL. |
| | |
| | RESPONSE: |
| | COORDINATE WITH ITEM #1(A) ABOVE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |