| Plan Review Notes For Permit 18090957 |
| Permit Number |
18090957 |
|
| Review Stop |
Z |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2019-01-31 15:49:07 | FAILED | | | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | | | 1) THANK YOU FOR PROVIDING THE ROOFING MATERIAL | | | EXTENDING DOWN THE FACADE OF THE BUILDING TO THE ROOF. | | | HOWEVER, AT THE MEETING BETWEEN DESIGN PROFESSIONALS | | | AND STAFF AGREEMENT WAS REACHED TO HAVE THE COPPER ROOF | | | MATERIAL EXTEND DOWN TO COVER ALL THE NEW HORIZONTAL | | | AREAS THAT REPLACED THE SLOPED ROOF ON THE CITY | | | COMMISSION APPROVED PLANS. THE DESIGN TEAM STATED THAT | | | THE HORIZONTAL AREAS AT THE ALUMINUM LOUVER SYSTEM | | | WOULD NOT BE VISIBLE, BUT HAVE PROVIDED NO PROOF TO | | | THIS STATEMENT, SO THIS AREA (THE BUILT UP FRAMED CURB) | | | MUST INCLUDE THE COOPER ROOF MATERIAL. SEE STAFF | | | MARK-UP OF THE ELEVATION DRAWINGS. | | | | | | 2) DETAIL 4 ON SHEET DA311 DOES NOT CORRESPOND TO THE | | | DETAIL TAG ON SHEET DA310. IT IS SUPPOSED TO BE THE | | | AREA ABOVE THE LOUVER, BUT IS INSTEAD THE ACCESS | | | LADDER. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | | | | |
|