Plan Review Notes
Plan Review Notes For Permit 18090918
Permit Number 18090918
Review Stop ENG
Sequence Number 2
Notes
Date Text
2018-11-13 10:09:55PERMIT 18090918 IS INCLUSIVE OF THE PAVING REMOVAL AND
 FOUNDATION FOOTPRINT LAYOUT. TREE DISPOSITION AND TREE
 MITIGATION WILL BE REQUIRED
 FOR THE PILING PHASE.
  
 POLLUTION PREVENTION PLAN MUST BE IN EFFECT AT ALL
 TIMES. ENGINEERING WILL INSPECT THE SITE WITHOUT NOTICE
 A MINIMUM OF THREE TIMES FOR COMPLIANCE.
 OUR DEPARTMENT WILL USE THE FOLLOWING TEMPLATES FOR
 PERFORMING INSPECTIONS AS PART NPDES MS4
 RESPONSABILITIES.
 HTTP://PBCO-NPDES.ORG/WRITTENPROCEDURES.ASP
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved