| 2018-10-05 15:09:20 | CONTACT ENGINEERING DEPT AND PROVIDE THE FOLLOWING: |
| | |
| | #1 PROVIDE A DEMOLOTION PLAN, PLAN SHOULD INCLUDE |
| | DEMOLITION, STORM WATER POLLUTION PREVENTION, AND TREE |
| | SURVEY. CAPPING OF SERVICES, |
| | WATER SOURCE (SERVICE) TO BE UTILIZED FOR DEMO. IT |
| | SHOULD DETAIL TREE PROTECTION AND/OR REMOVAL, GROUND |
| | COVER, SILT FENCE. |
| | #2 PROVIDE ENGINEER'S OPINION OF COST FOR RESTORING THE |
| | DISTURBED AREAS SHOULD THE PROJECT FAIL BEFORE A |
| | VERTICAL INSPECTION IS PERFORMED. |
| | #3 ENGINEERING SERVICES EROSION CONTROL & LAND |
| | STABILIZATION BOND (ORD. 4060-07) FOR 110% OF THE VALUE |
| | OF THE OPINION OF COST. |
| | YOU ARE WELSOME TO UTILIZE OUR PERFORMANCE BOND |
| | DOCUMENT AND COST ESTIMATE DOC AT THE INTERNET ADDRESS |
| | BELOW. |
| | HTTP://WPBFL.US/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO |
| | RMS,-PERMITS-APPLICATIONS. |
| | #4 BOND WILL BE RETURNED UPON SUCCESSFULLY PASSING THE |
| | VERTICAL INSPECTION. |
| | THANK YOU! |
| | |
| | MANNY GONZALEZ |
| | SENIOR ENGINEERING PROJECT COORDINATOR |
| | PUBLIC WORKS DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 818-1322 |
| | FAX: (561) 494-1116 |
| | EMAIL: [email protected] |
| | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS |
| | /FORMS,-PERMITS-APPLICATIONS |
| | |
| | IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF |
| | WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD |
| | FREE." |
| | FOR MORE INFORMATION REFER TO THE LINK BELOW: |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |