| 2019-01-18 13:25:23 | 1) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS. |
| | WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST. |
| | 2) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37 |
| | PER NFPA 37 SEC. 1.3 & 2017 FBC MECH. SEC. 915. THE |
| | NARRATIVE STATES THAT THE GENERATOR WILL MEET THE |
| | REQUIREMENTS OF NFPA 37 BUT DOCUMENTATION HAS NOT BEEN |
| | PROVIDED TO SUPPORT SUCH STATEMENT. PROVIDE |
| | DOCUMENTATION FROM THE MANUFACTURER THAT CONFIRMS |
| | COMPLIANCE. WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST. |
| | 3) INDICATE ON THE PLANS THE CLASS OF LIQUID OF THE |
| | FUEL IN ACCORDANCE WITH NFPA 30 SEC. 4.3.2. 2ND |
| | REQUEST. |
| | 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FUEL |
| | STORAGE TANK. THE STORAGE TANK SHALL MEET THE |
| | REQUIREMENTS OF NFPA 37 SEC. 22.11.4.1 THROUGH |
| | SECS.22.11.4.10. SUBMIT A SECTION DETAIL AND PLAN VIEW |
| | OF THE TANK SHOW THE SIZE OF ALL TANK OPENINGS, VENTS |
| | AND IDENTIFY EACH OPENING. 2ND REQUEST. |
| | 5) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET |
| | SHOWS THE DIAMETER OF THE EXHAUST AS 5 INCHES BUT |
| | SHT.SK-M401-2 SHOWS THE EXXHAUST AS 6 INCH. CLARIFY AND |
| | SUBMIT A REVISED CALCULATION SHEET. |
| | 6) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET |
| | NOTES TWO SHORT RADIUS ELBOWS BUT SHT. SK-M401-2 |
| | APPEARS TO SHOW THREE ELBOWS: ONE AT THE GENERATOR, ON |
| | AT THE HORIZONTAL TURN AND GOING VERTICAL. CLARIFY AND |
| | SUBMIT A REVISED CALCULATION SHEET. |
| | 7) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF |
| | NFPA 704 OR ANOTHER APPROVED SYSTEM SHALL BE APPLIED TO |
| | STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30 SEC. |
| | 21.7.2.1. PLACE A NOTE ON THE PLAN THAT THIS WILL BE |
| | DONE. |
| | 8) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL |
| | TANK PER NFPA 30 SEC. 22.7. THIS SHALL INCLUDE THE |
| | INTERSTITIAL SPACE.REFER TO NFPA 30 SEC. 22.7.3 AND |
| | TABLE 22.7.3.2. SUBMIT SPECIFICATIONS FOR THE EMERGENCY |
| | VENT. THIS IS NOT SHOWN ON THE PLAN. |
| | 9) SHOW ON THE PLAN HOW THE VENT PIPES AND FILL PIPE |
| | WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS OF |
| | THE STRUCTURE. GROUTING IN PLACE AS NOTED IN THE |
| | NARRATIVE IS UNACCEPTABLE AND DOES NOT MEET CODE. |
| | PIPING THAT PASSES THROUGH THE WALL OF A STRUCTURE |
| | SHALL BE DESIGNED TO PREVENT DAMAGING STRESSES AND |
| | LEAKAGE DUE TO SETTLEMENT OR FIRE EXPOSURE.NFPA 30 |
| | SEC.27.6.3. 2ND REQUEST. |
| | 10) SUBMIT THE UL APPROVAL/ CERTIFICATE/ CERTIFICATION |
| | FOR THE FUEL TANK.SECTION 304.1 2017 FBC-MECH. 2ND |
| | REQUEST. |
| | 11) NORMAL VENTS FROM THE FUEL STORAGE TANK SHALL |
| | COMPLY WITH NFPA 30 SEC.21.4.3.3 NORMAL VENTS SHALL BE |
| | SIZED IN ACCORDANCE WITH EITHER API STANDARD 2000, |
| | VENTING ATMOSPHERIC AND LOW-PRESSURE STORAGE TANKS, OR |
| | ANOTHER APPROVED STANDARD. ALTERNATIVELY, THE NORMAL |
| | VENT SHALL BE AT LEAST AS LARGE AS THE LARGEST FILLING |
| | OR WITHDRAWAL CONNECTION, BUT IN NO CASE SHALL IT BE |
| | LESS THAN 1.25 IN. (32 MM) NOMINAL INSIDE DIAMETER. |
| | 12) THE DOCUMENT FROM EMC ( ENGINEERED MANUFACTURING |
| | CORP.) IS UNACCEPTABLE. WHO IS CERTIFYING THE TANK? |
| | THERE IS NO NAME ON THIS DOCUMENT OR THE TITLE OF SUCH |
| | PERSON. WHO IS THE PERSON AND WHAT IS THEIR RANKING IN |
| | THE COMPANY? IN ADDITION, THIS DOCUMENT SHOWS THE |
| | RESULTS OF A LEAKAGE TEST, NOT A UL CERTIFICATION FOR |
| | THE TANK. THE TANK SHALL BE IN COMPLIANCE WITH UL 2085 |
| | PER THE SPECIFICATIONS ON SHT. E-002. |
| | 13) SHT. E-002 - 2.4 - FUEL OIL STORAGE SPECIFICATIONS |
| | REFER TO A SUB-BASE TANK BUT THAT IS NOT WHAT IS BEING |
| | INSTALLED. CLARIFY. |
| | 14) NFPA 30-12 SEC. 22.11.4. - WHERE A SECONDARY |
| | CONTAINMENT- TYPE TANK IS USED TO PROVIDE SPILL |
| | CONTROL, THE TANK SHALL MEET ALL OF THE REQUIREMENTS OF |
| | NFPA 30-12 SECS. 22.11.4.1 THROUGH 22.22.4.10. |
| | 15) IF A NARRRATIVE RESPONSE IS SUBMITTED UPON REVIEW |
| | OF THESE PLAN REVIEW COMMENTS, THE NARRATIVE SHALL BE |
| | ON THE LETTERHEAD OF THE ENGINEERING FIRM OF RECORD WHO |
| | IS ELLIS & GRITTER, NOT STRATICON WHO IS THE |
| | CONTRACTOR.WPB AMEND TO FBC SEC.107.2. |
| | |
| | THE FOLLOWING ITEMS WILL BE PROVISOS AND ARE TO BE |
| | CHECKED IN THE FIELD BY THE FIELD INSPECTOR: |
| | |
| | 1) THE RETURN LINE TO THE DAY TANK SHALL BE BELOW THE |
| | FUEL RETURN ELEVATION PER NFPA 110SEC.7.9.4.1. |
| | 2) APPROVED FLEXIBLE FUEL LINES SHALL BE USED |
| | BETWEENTHE PRIME MOVER AND THE FUEL PIPING. NFPA 110 |
| | SEC.7.9.3.2. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |