| Date |
Text |
| 2018-12-14 11:17:57 | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS, |
| | AND PROVIDE AN EXHAUST PIPE DRAWING SHOWING THE TOTAL |
| | SYSTEM RUN AND LENGTH MEASUREMENT. PLEASE INCLUDE ALL |
| | COMPONENTS OF THE SYSTEM INCLUDING THE SILENCER, ANY |
| | CONTRACTOR SUPPLIED PIPING, AND PIPE SUPPORT AND |
| | SPACING. |
| | 2) THE GENERATOR SPECIFICATIONS NOTE THAT THE GENERATOR |
| | OFFERS A UL 2200 LISTING. SUBMIT A COPY OF THE |
| | CERTIFICATE OF COMPLIANCE SHOWING THE UL 2200 LISTING. |
| | 2017 FBC-MECH. SEC.915. |
| | 3) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37 |
| | PER 2017 FBC-MECH. SEC. 915. I COULD NOT FIND THIS |
| | INFORMATION IN THE SPECIFICATIONS. |
| | 4) SPILL CONTROL, CONTAINMENT AND DRAINAGE MAY BE |
| | REQUIRED FOR THE FUEL TANK DEPENDING ON THE CLASS OF |
| | LIQUID OF THE FUEL. NFPA 30 SEC. 9.13. IT APPEARS THE |
| | FUEL IS A II COMBUSTIBLE LIQUID PER NFPA 30. CLARIF ON |
| | THE PLANS.. |
| | 5) IN ADDITION TO THE TANK PLANS THAT HAVE BEEN |
| | SUBMITTED, SUPPLY ANY ADDITIONAL MANUFACTURER'S |
| | SPECIFICATIONS FOR THE FUEL TANK.WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 6) THE MAXIMUM BACKPRESSURE FOR THE EXHAUST SYSTEMVPER |
| | THE MANUFACTURER'S SPECS IS 10 KPA PLEASE PROVIDE A |
| | BACKPRESSURE CALCULATION TO SHOW COMPLIANCE. THE |
| | CALCULATION MUST INCLUDE ALL COMPONENTS OF THE EXHAUST |
| | SYSTEM, INCLUDING THE SILENCER AND ALL FACTORY OR |
| | CONTRACTOR SUPPLIED PIPING. |
| | 7) THE FUEL TANK VENTS SHALL BE 5 FEET FROM BUILDING |
| | OPENINGS AND 15 FEET FROM POWERED VENTILATION AIR |
| | INTAKES PER NFPA 30-12 SEC.19.5.3.2. |
| | 8) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF |
| | NFPA 704, OR ANOTHER APPROVED SYSTEM, SHALL BE APPLIED |
| | TO STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30 |
| | SEC.21.7.2.1. |
| | 9) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL |
| | TANK PER NFPA 30 SEC.22.7. |
| | 10) SHOW ON THE PLAN HOW THE VENT PIPES FROM THE FUEL |
| | TANK WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS |
| | OF THE STRUCTURE. |
| | 11) THE FILL PORT FOR THE FUEL TANK SHALL BE PROVIDED |
| | ON AN EXTERIOR WALL OF THE ROOM OR STRUCTURE ENCLOSING |
| | THE TANK AT A POINT AT LEAST 24 INCHES FROM ANY |
| | BUILDING OPENING AT THE SAME OR LOWER LEVEL PER NFPA |
| | 37-15 SEC. 6.6.3.3. SHOW THE LOCATION OF THE FILL PORT |
| | ON THE PLANS. |
| | 12) THE MAXIMUM BACKPRESSURE FOR THE EXHAUST SYSTEMVPER |
| | THE MANUFACTURER'S SPECS IS 10 KPA PLEASE PROVIDE A |
| | BACKPRESSURE CALCULATION TO SHOW COMPLIANCE. THE CALC |
| | MUST INCLUDE ALL COMPONENTS OF THE EXHAUST SYSTEM, |
| | INCLUDING THE SILENCER AND ALL FACTORY OR CONTRACTOR |
| | SUPPLIED PIPING. |
| | 13) PROVIDE THE UL CERTIFICATE FOR THE FUEL TANK- |
| | SECTION 304.1 FBC M |
| | 14) SUBMIT A FUEL PIPING RISER DIAGRAM. DAY TANKS ON |
| | DIESEL SYSTEMS SHALL BE INSTALLED BELOW THE ENGINE FUEL |
| | RETURN ELEVATION PER NFPA 110-13 SEC.7.9.4. |
| | 15) THE RETURN LINE TO THE DAY TANK SHALL BE BELOW THE |
| | FUEL RETURN ELEVATION PER NFPA 110 SEC. 7.9.4.1. |
| | 16) APPROVED FLEXIBLE FUEL LINES SHALL BE USED BETWEEN |
| | THE PRIME MOVER AND THE FUEL PIPING. NFPA 110 SEC. |
| | 7.9.3.2. |
| | 17) NORMAL VENTS FROM THE FUEL STORAGE TANK SHALL |
| | COMPLY WITH.NFPA 30 SEC. 21.4.3.3. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |