| Date |
Text |
| 2019-03-23 10:30:05 | PROVISOS: |
| | |
| | A. SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO |
| | INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH |
| | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND |
| | ENGINEERING (IF APPLICABLE). |
| | |
| | B. COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY |
| | DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING |
| | DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| | |
| | C. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE LIST |
| | SHEET G10.04 ; DOCUMENTS SHOWING COMPLIANCE ARE TO BE |
| | REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS AND OTHER |
| | SPECIFICATION DOCUMENTS, STRUCTURAL ENGINEER OF RECORD |
| | APPROVAL AND REVIEW IS REQUIRED FOR DELEGATED |
| | ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE |
| | REQUIRED PRIOR TO INSTALLATION. |
| | |
| | D. COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH |
| | PRESSURES SHOWN ON SHEET S0.05 AND S0.05A) |
| | |
| | E. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| | REQUIRED FOR: |
| | LIGHT POLES/SITE LIGHTING |
| | FIRE ALARM |
| | FIRE SPRINKLER |
| | LOW VOLTAGE |
| | ACCESS |
| | LANDSCAPING |
| | IRRIGATION |
| | PARKING LOT |
| | ALL OTHER ITEMS OTHER THAN BMEP |
| | |
| | F. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A |
| | PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL. |
| | |
| | G. AIPP COMPLIANCE REQUIRED (VERIFY WITHIN 90 DAYS OF |
| | PERMIT ISSUANCE); VERIFICATION REQUIRED PRIOR TO C.O. |
| | |
| | F. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE |
| | SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE |
| | ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED |
| | PRIOR TO CONCRETE POUR. |
| | |
| | H. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS |
| | REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION. |
| | |
| | I. CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM |
| | SAT-SUN |
| | |