| Date |
Text |
| 2018-11-19 10:19:32 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #18090469 |
| | 360 S. ROSEMARY |
| | 11/19/18 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES |
| | AND OMISSIONS LISTED BELOW. PLEASE REVIEW ALL COMMENTS, |
| | INCLUDING THOSE LISTED FOR ADVISORY PURPOSES, AND |
| | RESUBMIT CORRECTED PLANS AND REQUIRED DOCUMENTS. WHEN |
| | RESUBMITTING, PLEASE PROVIDE A RESPONSE LETTER |
| | ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL |
| | FORM. |
| | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL |
| | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE |
| | PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB |
| | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL |
| | INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS |
| | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE |
| | DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL |
| | FOLLOW ONCE ALL PLANS ARE APPROVED. |
| | |
| | 1) THE FOLLOWING LIST OF DOCUMENTS WERE NOT SUBMITTED |
| | BUT ARE REQUIRED IN ORDER TO PERFORM A COMPLETE |
| | MECHANICAL REVIEW FOR THE PROJECT. |
| | |
| | A) SMOKE CONTROL RATIONAL ANALYSIS- SECTION 513.4 FBC |
| | M: A RATIONAL ANALYSIS SUPPORTING THE TYPES OF SMOKE |
| | CONTROL SYSTEMS TO BE EMPLOYED, THEIR METHODS OF |
| | OPERATION, THE SYSTEMS SUPPORTING THEM AND THE METHODS |
| | OF CONSTRUCTION TO BE UTILIZED SHALL ACCOMPANY THE |
| | SUBMITTED CONSTRUCTION DOCUMENTS AND SHALL INCLUDE, BUT |
| | NOT BE LIMITED TO, THE ITEMS INDICATED IN SECTIONS |
| | 513.4.1 THROUGH 513.4.7. |
| | |
| | B) AC COOLING AND HEATING CALCULATIONS- SECTION |
| | C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING, |
| | VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL |
| | BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA |
| | STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED |
| | EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN |
| | PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING |
| | LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS |
| | THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE |
| | UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE |
| | ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN |
| | APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN |
| | LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM |
| | SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING |
| | IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS |
| | OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL |
| | BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL |
| | PERMIT. |
| | |
| | C) ENERGY EFFICIENCY COMPLIANCE REPORT- SECTION C401.2 |
| | FBC EC. |
| | COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF THE |
| | FOLLOWING: |
| | 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1, |
| | EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD. |
| | 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN |
| | ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH |
| | SECTION C406 AND TENANT SPACES SHALL COMPLY WITH |
| | SECTION C406.1.1. |
| | 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404, |
| | C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING |
| | ENERGY COST SHALL 'E EQUAL TO OR LESS THAN 85 PERCENT |
| | OF THE STANDARD REFERENCE DESIGN BUILDING. |
| | PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA |
| | BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER |
| | SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO |
| | APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER |
| | SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE. |
| | |
| | 2) PRODUCT AND ENGINEERING SUBMITTAL DOCUMENTS REQUIRED |
| | TO PERFORM A COMPLETE MECHANICAL PLAN REVIEW, AND TO |
| | PERFORM COMPLETE INSPECTIONS ON THE PROJECT. |
| | |
| | A) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS. |
| | |
| | B) FIRE DAMPERS |
| | |
| | C) MOTORIZED AND BAROMETRIC DAMPERS |
| | |
| | D) DUCT SMOKE DETECTORS |
| | |
| | E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES |
| | INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT |
| | APPROVALS AND/OR MIAMI-DADE NOA'S |
| | |
| | F) C0, N02, & CO2 SENSORS |
| | |
| | G) COOLING TOWERS |
| | |
| | H) GENERATOR |
| | |
| | I) ACCESS PANELS |
| | |
| | J) DUCT FIRE WRAPPING |
| | |
| | K) FIRESTOPPING AND FIRE CAULKING |
| | |
| | L) CONDENSER WATER PIPING AND PIPE INSULATION. |
| | |
| | M) WIND LOAD ENGINEERING FOR THE ROOFTOP MECHANICAL |
| | EQUIPMENT INCLUDING THE COOLING TOWER, OA UNIT, |
| | PRESSURIZATION FANS AND CURBS, CONDENSER STANDS AND |
| | BRACKETS, DUCTS AND DUCT SUPPORTS, HEAT EXCHANGERS, |
| | PUMPS AND WATER PIPING ETC. PLEASE INCLUDE FL. PRODUCT |
| | APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE CONDENSER |
| | STANDS AND MOUNTING BRACKETS. |
| | PLEASE NOTE: ALL SUBMITTALS AND SHOP DRAWINGS SHALL |
| | BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN |
| | PROFESSIONAL OF RECORD. ALL REQUIRED SUBMITTALS MAY BE |
| | DEFERRED IN ACCORDANCE WITH SECTION 107.3.4.1 WPB. IT |
| | WILL BE HELPFUL TO UPLOAD A MASTER LIST OF DEFERRED |
| | SUBMITTALS IN DOCUMENT FORM, OR IN THE FORM OF NOTES ON |
| | THE MECHANICAL PLANS. |
| | |
| | DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | |
| | 3) SUBMITTAL DOCUMENTS REQUIRED FOR FINAL MECHANICAL |
| | PLAN REVIEW AND INSPECTION APPROVALS, AND CO OF THE |
| | BUILDING. |
| | |
| | A) COMMISSIONING REPORT- COMMISSIONING OF THE |
| | MECHANICAL SYSTEMS, SERVICE WATER HEATING SYSTEMS, AND |
| | ELECTRICAL POWER AND LIGHTING SYSTEMS IS REQUIRED PER |
| | SECTION C408.2 FBC-17 ENERGY CONSERVATION. |
| | PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW. |
| | |
| | C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING |
| | SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS. |
| | PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, |
| | THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, |
| | MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE |
| | EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND |
| | COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS |
| | SECTION. |
| | CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE |
| | PROVISIONS FOR COMMISSIONING AND COMPLETION |
| | REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE |
| | PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER |
| | REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE |
| | GIVEN TO THE OWNER OR OWNER?S AUTHORIZED AGENT AND MADE |
| | AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN |
| | ACCORDANCE WITH SECTIONS C408.2.4 AND C408.2.5. |
| | |
| | C408.2.1. COMMISSIONING PLAN. |
| | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED |
| | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL |
| | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE |
| | FOLLOWING ITEMS: |
| | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL |
| | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, |
| | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF |
| | THE ACTIVITIES. |
| | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR |
| | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO |
| | BE PERFORMED. |
| | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED |
| | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. |
| | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. |
| | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN |
| | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. |
| | 5. MEASURABLE CRITERIA FOR PERFORMANCE' |
| | |
| | B) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS |
| | REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN |
| | THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES |
| | 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE |
| | TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A |
| | REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN |
| | FIRE PROTECTION ENGINEERING AND/OR MECHANICAL |
| | ENGINEERING. |
| | PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM, |
| | DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED |
| | TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR |
| | AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED |
| | TO BE REVIEWED BY THE WPB BUILDING AND FIRE |
| | DEPARTMENTS. |
| | PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE |
| | PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED |
| | BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT |
| | SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE |
| | DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED |
| | IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER) |
| | IN THE BUILDING. |
| | |
| | 4) SEPARATE MECHANICAL PERMITS REQUIRED: SEPARATE |
| | PERMITS ARE REQUIRED FOR KITCHEN EXHAUST HOODS AND FIRE |
| | SUPPRESSION SYSTEMS, WALK-IN COOLERS AND FREEZERS. |
| | |
| | 5) PROVIDE MINIMUM VENTILATION CALCULATIONS FOR ALL |
| | ROOMS AND SPACES PER TABLE 403.3.1.1 FBC-17 MECHANICAL. |
| | PROVIDE A SCHEDULE THAT INDICATES THE REQUIRED AND |
| | PROVIDED CFMS OF OUTDOOR AIR. IT APPEARS THAT THE |
| | REQUIRED CALCULATIONS WERE TO BE PLACED ON THE BLANK |
| | SHEET M8.03 WHICH BEARS A SMALL NOTE REFERENCING THE |
| | CALCULATIONS. |
| | |
| | 6) SHEET M1.1: THERE ARE NO AC SYSTEMS PROVIDED FOR THE |
| | RETAIL AREAS. PLEASE LABEL THESE AREAS AS "FUTURE" IF |
| | APPLICABLE, AND NOTE THAT ALL INTERIOR SPACES INTENDED |
| | FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH ACTIVE OR |
| | PASSIVE SPACE-HEATING SYSTEMS- SECTION 309.1 FBC-M. |
| | |
| | 7) M1.1: NO VENTILATION AIR (O/A) PROVIDED TO THE |
| | ELEVATOR LOBBIES, CORRIDOR, FIRE RESCUE, FIRE COMMAND |
| | AND OTHER OCCUPIED ROOMS AND SPACES- SEE SECTIONS |
| | 401.2, 402.1, 403.1, 403.2 AND TABLE 403.3.1.1 FBC M. |
| | O/A. HOW WILL POSITIVE PRESSURE ME MAINTAINED IN THESE |
| | AREAS THAT ARE ADJACENT TO THE GARAGE AREA WHERE |
| | EXHAUST IS REQUIRED? |
| | |
| | 8) PROVIDE EXHAUST VENTILATION CALCULATIONS AND THE |
| | SEQUENCE OF OPERATION FOR THE |
| | A) ENCLOSED GARAGE/LOADING DOCK AREA. |
| | B) DIESEL TANK ROOM. |
| | C) FIRE PUMP ROOM. |
| | D) SHOP. |
| | E) RESTROOM |
| | F) SMOKE PURGE SYSTEMS. |
| | |
| | 9) M1.1: THE EXHAUST SYSTEMS FOR THE FIRE PUMP ROOM, |
| | SHOP, AND RESTROOM SHALL DISCHARGE TO THE OUTDOORS AND |
| | NOT THE INTERIOR GARAGE AREA- SECTION 501.3. |
| | |
| | 10) M1.1: AUTOMATIC SHUT OFF DAMPERS EITHER MOTORIZED |
| | OR GRAVITY-TYPE ARE REQUIRED ON ALL O/A INTAKES AND |
| | EXHAUST OPENINGS- SECTION C403.2.4.3 FBC EC. |
| | |
| | 11) M1.1: THE MAKEUP AIR OPENING AT THE DIESEL TANK |
| | ROOM/GARAGE WALL IS NOT PERMITTED. ALL AIR FROM THE |
| | GARAGE SHALL BE EXHAUSTED AND NOT TRANSFERRED OR |
| | RECIRCULATED INTO ADJACENT SPACES- TABLE 403.3.1.1. |
| | FOOTNOTE B. |
| | |
| | 12) M1.1: THE LOCATION OF OPEN AIR INTAKE (TIL-1-1) BY |
| | THE DRIVE AREA IS NOT IN COMPLIANCE WITH SECTION 401.4 |
| | (2) FBC M. |
| | |
| | 13) M1.1: THE "EXIT PASSAGEWAY" OR "STAIRWAY EXTENSION" |
| | FROM STAIR #1 IS MISLABELED AS AN "EGRESS CORRIDOR". |
| | PLEASE SEE SECTION 202 DEFINITIONS, AND SECTION 1023 |
| | 1024 FBC B. PLEASE NOTE THAT THIS PASSAGE WAY OR |
| | EXTENSION IS ALSO CLASSIFIED AS A SMOKEPROOF ENCLOSURE |
| | AND SHALL BE PRESSURIZED EQUALLY TO THE PRESSURIZATION |
| | REQUIRED FOR THE STAIRWAY DURING AN EMERGENCY ALARM |
| | EVENT- SEE SECTION 1023.11.1 FBC B. |
| | |
| | 14) M1.1: THE CONDENSING UNITS (CU'S) SHOWN IN THE |
| | INTERIOR GARAGE AREA ARE DESIGNED TO BE INSTALLED IN |
| | ACCORDANCE WITH THE CONDITIONS OF THEIR LISTING AND THE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS- SECTION 304.1 |
| | FBC M. TYPICALLY THESE UNITS MUST BE INSTALLED |
| | OUTDOORS. |
| | |
| | 15) M1.1: AS NOTED ABOVE IN COMMENT #8, THERE IS NO |
| | SEQUENCE OF OPERATION FOR THE EXHAUST SYSTEM IN THE |
| | GARAGE AREA. PLEASE REFER TO SECTIONS 404.1 & 404.2 FBC |
| | M AND PROVIDE A NARRATIVE TO CLARIFY HOW THIS SYSTEM |
| | WILL FUNCTION, AND SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | AND INSTALLATION INSTRUCTIONS FOR THE CO AND NO2 |
| | SENSORS- SEE COMMENT #2 ABOVE. |
| | |
| | 16) M1.1 GENERATOR/DIESEL TANK: A) SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR AND |
| | DIESEL TANK, FUEL AND VENT PIPES, MUFFLER, AND ALL |
| | OTHER ASSOCIATED SYSTEM COMPONENTS. B) SUBMIT A COPY OF |
| | THE UL CERTIFICATE OF COMPLIANCE FOR THE GENERATOR |
| | INDICATING THE UNIT MEETS THE REQUIREMENTS OF UL 2200. |
| | C) SHOW THE TERMINATION LOCATION OF THE ENGINE EXHAUST |
| | VENT PIPE. D) SHOW THE FUEL PIPING RUN FROM THE TANK TO |
| | THE GENERATOR AND INDICATE HOW THE PIPE PENETRATION |
| | WILL BE FIRESTOPPED. E) PLEASE REVIEW SECTION 7.7.1 |
| | NFPA 110. AN AC SYSTEM MAY BE REQUIRED FOR THE |
| | GENERATOR ROOM IN ORDER TO LIMIT THE MAXIMUM AIR |
| | TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR |
| | TEMPERATURE AS REQUIRED BY THE GENERATOR MANUFACTURER. |
| | |
| | 17) M1.1: INDICATE THE CLEARANCE DISTANCE BETWEEN THE |
| | GENERATOR ROOM INTAKE AND EXHAUST LOUVERS- SECTIONS |
| | 401.4 AND 501.3.1 FBC M. |
| | |
| | 18) M1.1: INDICATE THE CLEARANCE DISTANCE HEIGHT OF THE |
| | PFSP-1 & 2, AND EF-1-5 EXHAUST OUTLETS TO THE ADJOINING |
| | GRADE- SECTION 501.3.1 (2) FBC M. |
| | |
| | 19) M1.1: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE |
| | AIR HANDLERS- SECTION 307.2 FBC M. PLEASE NOTE THAT NO |
| | PIPE SIZES OR PIPE DETAILS ARE PROVIDED ON THE RISER |
| | DRAWING- SHEET M4.01. |
| | |
| | 20) LS1.01: THE LIFE SAFETY PLAN SHOWS AN INTERSTITIAL |
| | SPACE WHERE STAIR #2 IS EXTENDED VIA AN EXIT PASSAGEWAY |
| | TO STAIR #6. PLEASE NOTE THAT THERE ARE NO MECHANICAL |
| | PLANS UPLOADED FOR THIS SPACE, AND THE EXIT PASSAGEWAY |
| | IS MISLABELED AS AN EGRESS CORRIDOR. THE PASSAGEWAY AND |
| | STAIR #6 ARE ALSO SMOKEPROOF ENCLOSURES THAT NEED TO BE |
| | PRESSURIZED DURING AN EMERGENCY ALARM- SEE COMMENTS #1A |
| | & #13 ABOVE AND CORRECT THE RISER DRAWINGS ON SHEET |
| | M6.01. |
| | |
| | 21) M1.1: PROVIDE SIZING CALCULATIONS FOR THE SMOKE |
| | PURGE SYSTEMS- SECTION 403.4.7 FBC B. |
| | |
| | 22) M1.2, 1.3, 1.4, 1.5, 1.6, 1.7, & M1.8: THE NOTES ON |
| | THE PLAN INDICATE THE DESIGN PROFESSIONALS HAVE NOT |
| | DECIDED WHETHER THE GARAGE IS DESIGNED AS "OPEN" OR |
| | "ENCLOSED", BUT HAVE STATED THAT THE CURRENT DESIGN |
| | WILL NOT WORK FOR ENCLOSED GARAGES? PLEASE CLARIFY THAT |
| | STATEMENT AND NOTE THAT ENCLOSED GARAGES SHALL HAVE |
| | MECHANICAL EXHAUST VENTILATION SYSTEMS DESIGNED IN |
| | ACCORDANCE WITH SECTION 404 FBC M. THE CURRENT PLAN |
| | SHOWS THE GARAGE EXHAUST FANS LOCATED IN ONE REMOTE |
| | CORNER OF THE GARAGE WHICH MAY LIMIT THEIR ABILITIES TO |
| | EXHAUST THE ENTIRE AREA OF THE GARAGES- PLEASE SEE |
| | SECTION 502.1.1 FBC M. A) THE EXHAUST FAN SCHEDULE FOR |
| | THE GARAGES ON M8.02 SHOWS THE FANS INTERLOCKED WITH |
| | CO/NO2 SENSORS. PLEASE SHOW THE SENSOR LOCATIONS ON THE |
| | PLAN AND PROVIDE A SEQUENCE OF OPERATION. B) PROVIDE |
| | EXHAUST VENTILATION CALCULATIONS FOR EACH GARAGE- TABLE |
| | 403.3.1.1 FBC M. |
| | |
| | 23) LS1.02, 1.03, 1.04, 1.05, 1.06, 1.07, 1.08, 1.09 & |
| | LS1.10: INTERIOR EXIT STAIRWAY ENCLOSURES (STAIR #1 & |
| | #2) SHALL HAVE 2-HR. FIRE-RATED WALLS, HOWEVER THE |
| | DRAWINGS APPEAR TO INDICATE A SMALL SECTION OF THE |
| | ENCLOSURE IS ONLY 1-HR. RATED AT THE LOCATIONS OF THE |
| | PRESSURIZATION DUCT SHAFTS. PLEASE REVIEW SECTION 1023 |
| | FBC B. |
| | |
| | 24) M1.2, 1.3, 1.4, 1.5, 1.6, 1.7, M1.8: A) NO |
| | VENTILATION AIR PROVIDED TO OCCUPIED ROOMS- SECTION |
| | 401.2 B) THE EXHAUST FROM EF-2 SHALL DISCHARGE TO THE |
| | OUTDOORS- SECTION 501.3 FBC M. C) NO VENTILATION OR |
| | SPACE HEATING PROVIDED TO THE OFFICES ON THE SOUTH AND |
| | WEST SIDES OF THE BUILDING DESPITE NOTES ON THE M1.02 & |
| | M1.04 PLANS REFERENCING EQUIPMENT- SECTIONS 309.1 & |
| | 401.2 FBC M. IT APPEARS THESE AREAS ARE SHELL SPACES TO |
| | BE BUILT OUT AT A FUTURE DATE. PLEASE PLACE NOTES ON |
| | THE PLANS TO CLARIFY, AND SHOW HOW O/A WILL BE |
| | PROVIDED. |
| | |
| | 25) M1.09: NO VENTILATION OR SPACE HEATING PROVIDED TO |
| | THE OFFICES- SECTIONS 309.1 & 401.2 FBC M. IT APPEARS |
| | THESE AREAS ARE SHELL SPACES TO BE BUILT OUT AT A |
| | FUTURE DATE. PLEASE PLACE NOTES ON THE PLANS TO |
| | CLARIFY. |
| | |
| | 26) M2.01: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | SUPPLY SYSTEM OF AC-9-1- SECTION 606.2.1 FBC M. |
| | |
| | 27) M2.02: INDICATE WHICH FLOORS THIS "TYPICAL" DRAWING |
| | PERTAINS TO AND WHICH AC SYSTEMS. SHOW THE LOCATION OF |
| | THE REQUIRED DUCT SMOKE DETECTOR- SECTION 606.2.1 FBC |
| | M. |
| | |
| | 28) M2.03 & M.401: A) PROVIDE THE CONDENSATE PIPE SIZES |
| | IN THE RISER DRAWING. B) INDICATE WHERE THE CONDENSATE |
| | BRANCH PIPES ARE DISCHARGING TO, OR HOW THEY ARE ALL |
| | CONNECTING INTO A MAIN STORM DRAIN. C) THE NOTE ON |
| | M.401 REFERENCES RISER CONTINUATIONS ON M.203. PLEASE |
| | NOTE THESE CONTINUATIONS ON M.203. |
| | |
| | 29) M.601: PLEASE CORRECT STAIR #1 & 2 PRESSURIZATION |
| | RISERS IN ACCORDANCE WITH COMMENTS #1A, 13 & 20. |
| | |
| | 30) PROVIDE A REFRIGERANT RISER DRAWING FOR THE DX |
| | SYSTEMS- SECTION 304.1 FBC M. |
| | |
| | 31) PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION OF |
| | ALL ROOFTOP MECHANICAL EQUIPMENT- SECTION 301.15 FBC M. |
| | THIS INFORMATION CAN BE PROVIDED WITH THE CORRECTED |
| | PLANS, OR AS A DEFERRED SUBMITTAL- SEE COMMENT #2. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |