| 2018-10-25 09:39:49 | 1) THE SUBMITTED GAS DRAWING SHOWS THE BTU LOAD OF THE |
| | GENERATOR AS 330,000 BTU'S BUT THE GENERATOR SPECS SHOW |
| | THE FULL BTU LOAD AS 281,000 BTU'S. CLARIFY. |
| | 2) TWO DIFFERENT GAS DRAWINGS ARE SUBMITTED IN THIS |
| | APPLICATION PACKAGE. REMOVE ALL OLDD DOCUMENTS AND |
| | SUBMIT TWO COMPLETE SETS OF PLANS THAT CLEARLY REFLECST |
| | THE SCOPE OF WORK TO BE DONE. FBC 107.2.1. |
| | 3) THERE IS A SHEET FROM ONE STOP GENERATOR SHOP THAT |
| | STATES THE GENERATOR WILL BE CONNECTING TO AN EXISTING |
| | GAS LINE BUT A GAS DRAWING HAS BEEN SUBMITTED THAT |
| | SHOWS A NEW GAS METER FOR THE GENERATOR. CLARIFY. AT |
| | THIS POINT I HAVE NO IDEA AS TO WHAT IS BEING INSTALLED |
| | AT THIS SITE. |
| | 4) THERE ARE TWO SURVEYS IN THIS PERMIT APPLICATION |
| | PACKAGE THAT SHOW TWO DIFFERENT LOCATIONS FOR THE |
| | GENERATOR AND A THIRD PLAN THAT SHOWS AN ALTOGETHER |
| | DIFFERENT LOCATION FOR THE GENERATOR. SUBMIT TWO COPIES |
| | OF A LEGIBLE SURVEY THAT CLEARLY SHOWS THE LOCATION OF |
| | THE GENERATOR AND THE GAS METER(S). REMOVE ALL OLD |
| | OCCUMENTS FROM THE PERMIT PACKAGE. |
| | 5) SUBMIT MANUFACTURER?S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS. |
| | REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING |
| | SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON |
| | THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING |
| | INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR |
| | CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017 |
| | FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1. |
| | 6) THE LOCATION OF THE GENERATOR IN RELATION TO |
| | BUILDING OPENINGS AND OPERABLE DOORS AND WINDOWS SHALL |
| | COMPLY WITH THE MANUFACTURER'S INSTALLATION MANUAL. THE |
| | STANDARD DISTANCE IS 10 FT.BUT THE MANUAL SHALL BE |
| | FOLLOWED. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |