| 2018-10-04 12:54:52 | THE FOLLOWING ITEMS ARE PROVISOS AND MUST BE ADDRESSED |
| | BEFORE ANY FINAL INSPECTIONS ARE SCHEDULED FOR ANY OF |
| | THESE SYSTEMS. |
| | |
| | SUBMIT A DETAIL OF THE CONDENSATE DRYWELL FOR REVIEW. |
| | 2017 FBC SEC. 107.2.1. |
| | SHT. P-102 - SHOW THE SQUARE FOOT AREA OF THE ROOF OF |
| | THE PORTE COCHERES BEING DRAINED. INCLUDE ONE-HALF OF |
| | THE AREA OF ANY PARAPET WALLS. 2017 FPC SEC.1106.4. |
| | SUBMIT SPECIFICATIONS FOR THE COMBO ROOF DRAINS. |
| | SHT. P-101. CLOUD AND IDENTIFY THE CHANGES MADE TO THE |
| | PLUMBING SYSTEM. CURRENTLY, THERE ARE NO CHANGES SHOWN |
| | ON THIS SHEET. CLARIFY. |
| | SUBMIT REVISED PIPING RISERS FOR THE SANITARY, STORM, |
| | AND CONDENSATE SYSTEMS THAT CLEARLY REFLECT ALL THE |
| | CHANGES MADE TO THESE SYSTEMS. SHOW THE LINT TRAP ON |
| | THE RISER AND SUBMIT A DETAIL OF THE LINT TRAP. FBC |
| | 107.2.1. |
| | SUBMIT A REVISED GAS RISER WITH THE CORRECT PIPE |
| | SIZING. |
| | |
| | SPECIFICATION SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE |
| | WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS SEC. 301.3. |
| | |
| | LOCATION, LENGTH, SIZE AND |
| | TERMINATION OF THE GAS VENTS PER |
| | FBC-2014 FUEL GAS CODE SEC. 502 THRU |
| | 504. SUBMIT CALCULATIONS FOR |
| | COMBUSTION AIR PER THE FBC-2014 |
| | FUEL GAS CODE SEC. 304. FOR BOILERS |
| | |
| | COMBUSTION AIR PER THE FBC-2014 |
| | FUEL GAS CODE SEC. 304. FOR BOILER |
| | AND DRYERS |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |