| 2018-09-28 18:59:57 | 09/28/2018 1ST POOL PLUMBING REVIEW**DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. SHOW HOW EXISTING SANITARY WILL CONNECT TO THE NEW |
| | SYSTEM ON THE SECOND FLOOR IN MASTER AND BATH 2 FOR THE |
| | PLUMBING RISER DIAGRAM, WPB AMENDMENTS TO THE FBC SEC. |
| | 107.3.5.3 (11) RESIDENTIAL PLUMBING. |
| | |
| | 2. THERE IS NO VALUE LISTED ON THE PLUMBING |
| | SUB-APPLICATION AND THE OVERALL VALUE IS LOW. WPB |
| | AMENDMENTS TO THE FBC 109.3 BUILDING PERMITS |
| | VALUATIONS. IF IN THE OPINION OF THE BUILDING OFFICIAL, |
| | THE CLAIMED VALUATION OF BUILDING, ALTERATION, |
| | STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR PLUMBING |
| | SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE |
| | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 3. TUB STANDALONE REQUIRED A CONTROL VALVE BY A WATER |
| | TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE 1070 |
| | OR CSA B125.3, EXCEPT WHERE SUCH PROTECTION IS |
| | OTHERWISE PROVIDED BY A COMBINATION TUB/SHOWER VALVE IN |
| | ACCORDANCE WITH SECTION P2708.4. FBC R 2713.3 BATHTUB |
| | AND WHIRLPOOL BATHTUB VALVES. SHOWER PAN MUST HAVE A |
| | SLOPED MORTAR BED THAT IS PRE-PITCHED BENEATH PRIOR TO |
| | LINER INSTALLATION OF 1/4" IN PER FOOT TOWARD THE |
| | DRAIN, MUST HAVE DAM CORNER, BACKING AROUND THE |
| | PERIMETER AND BEFORE FINAL MORTAR APPLICATION PLACE |
| | SOME PEA GRAVEL OVER WEEP HOLES SO THE MORTAR DOES NOT |
| | COVER THEM PER MANUFACTURES SPECIFICATIONS. |
| | |
| | 4. IF THE SHOWER PAN IS NOT RECEDED IT WILL REQUIRE |
| | LINING FBC R 2709.2 SHOW DETAIL OF SHOWER LINING |
| | REQUIRED. THE LINING MATERIAL SHALL EXTEND NOT LESS |
| | THAN 2 INCHES BEYOND OR AROUND THE ROUGH JAMBS AND NOT |
| | LESS THAN 2 INCHES ABOVE FINISHED THRESHOLDS. |
| | SHEET-APPLIED LOAD-BEARING, BONDED WATERPROOF MEMBRANES |
| | SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER?S |
| | INSTRUCTIONS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |