2019-06-18 11:47:323RD REVIEW FBC-2017 MECHANICAL
 PERMIT #18081528
 1515 S FLAGLER DR.
 6/19/19
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
 BASED ON THE REVISED PLANS AND COMMENT RESPONSES FROM
 MANAGED LAND ENTITLEMENTS, PLEASE ADDRESS THESE
 REMAINING ISSUES.
  
 1) PARKING GARAGES- SHEETS M100, M101A, M101B, M503:
 A) THE SEQUENCE OF OPERATION FOR THE GARAGE EXHAUST
 SYSTEM SHALL INDICATE THAT AUTOMATIC OPERATION OF THE
 SYSTEM SHALL NOT REDUCE THE VENTILATION AIRFLOW RATE
 BELOW 0.05 CFM PER SQUARE FOOT OF THE FLOOR AREA. THE
 CURRENT NOTES INDICATE THE FANS WILL OPERATE ONLY BY
 ACTUATION OF THE SENSORS. CONTINUOUS OPERATION AT THE
 MINIMUM RATE IS REQUIRED. THE EXHAUST SYSTEMS SHALL
 ALSO BE IN COMPLIANCE WITH SECTION C403.2.6.2 FBC EC
 WHICH IS COPIED BELOW:
 C403.2.6.2 ENCLOSED PARKING GARAGE VENTILATION
 CONTROLS. ENCLOSED PARKING GARAGES USED FOR STORING OR
 HANDLING AUTOMOBILES OPERATING UNDER THEIR OWN POWER
 SHALL EMPLOY CONTAMINATION-SENSING DEVICES AND
 AUTOMATIC CONTROLS CONFIGURED TO STAGE FANS OR MODULATE
 FAN AVERAGE AIRFLOW RATES TO 50 PERCENT OR LESS OF
 DESIGN CAPACITY, OR INTERMITTENTLY OPERATE FANS LESS
 THAN 20 PERCENT OF THE OCCUPIED TIME OR AS REQUIRED TO
 MAINTAIN ACCEPTABLE CONTAMINANT LEVELS IN ACCORDANCE
 WITH FLORIDA BUILDING CODE, MECHANICAL PROVISIONS.
 FAILURE OF CONTAMINATION SENSING DEVICES SHALL CAUSE
 THE EXHAUST FANS TO OPERATE CONTINUOUSLY AT DESIGN
 AIRFLOW.
 B) INDICATE HOW THE CIRCULATION FANS WILL BE PROTECTED
 FROM DAMAGE- PROVIDE DETAILS- OR RAISE THE FANS TO THE
 MINIMUM REQUIRED HEIGHT OF 8?0? FROM F.F. TO BOTTOM OF
 FAN- SECTION 304.6 FBC M.
 C) COMMENT #13 FROM THE SECOND REVIEW STILL EXISTS.
 IMPACT PROTECTION FOR THE GARAGE EXHAUST FANS SHOWN ON
 M101B & M706 NOT PROVIDED.
  
 2) GENERATOR- SHEETS M101A, P242, & P708:
 A) AS PREVIOUSLY REQUESTED SHOW THE CLEARANCE DISTANCE
 MEASUREMENTS FROM THE GENERATOR RADIATOR EXHAUST AND
 ENGINE EXHAUST OUTLET TO THE ROOM AIR INTAKE LOUVER,
 AND ANY OTHER OPENINGS OR AIR INTAKES INTO THE
 BUILDING.
 B) PROVIDE THE DETAILS AND SPECIFICATIONS FOR THE FUEL
 TANK AND FUEL PIPING THAT ARE INDICATED ON SHEETS P242
 AND P708 ON THE MECHANICAL PLANS, OR NOTE THESE PLAN
 SHEETS ON M101A TO HELP EXPEDITE THE CONSTRUCTION AND
 INSPECTION PROCESS. (THE GENERATOR AND THE FUEL SYSTEM
 ARE MECHANICAL INSPECTIONS).
  
 3) POOL EQUIPMENT ROOM- SHEETS M101A, M603:
 A) PROVIDE A SEQUENCE OF OPERATION FOR THE EXHAUST
 SYSTEM. WILL PEEF-2 RUN CONTINUOUSLY? WILL ANY POOL
 TREATMENT CHEMICALS BE STORED IN THE ROOM? PLEASE
 REVIEW SECTIONS 510.1, 510.2, 510.7.1, AND 510.7.3 FBC
 M AND INDICATE COMPLIANCE.
 B) THE EXHAUST FAN SCHEDULE DOES NOT PROVIDE ANY
 INFORMATION ABOUT THE FANS IN THE ?REMARKS? COLUMN THAT
 WOULD INDICATE THE FANS HAVE BEEN TESTED AND RATED FOR
 GAS BOILER EXHAUST SYSTEMS- SECTION 305.1 FBC FG.
 C) PROVIDE A UL TESTED AND APPROVED FIRESTOPPING
 ASSEMBLY FOR THE BOILER VENT FLUE PENETRATIONS THROUGH
 THE FIRE RATED WALL- SECTION 714 FBC B.
 D) SHEET 101A INDICATES AN EXHAUST LOUVER TERMINATION
 FOR THE POOL VENT FLUES- M706 INDICATES A LOCHINVAR
 TERMINATION KIT FOR AIR INTAKE AND EXHAUST FLUE.
  
 4) KITCHEN: THE COMMENT RESPONSE NARRATIVE INDICATES AN
 EQUIPMENT SCHEDULE ON SHEET G10 WHICH HAS NOT BEEN
 PROVIDED- SECTION 107.2.1 WPB.
  
 5) SHEET M102B: THE REQUESTED VENTILATION FOR THE TRASH
 ROOM NOT PROVIDED- SECTION 502.1 FBC M.
  
 6) SHEETS M106, M107, & M108: AS PREVIOUSLY REQUESTED
 INDICATE HOW THE TRASHROOMS AND CORRIDORS BY THE
 STAIRWAYS WILL BE VENTILATED-
  
 7) SHEETS M103, M502: THE SMOKE ANALYSIS DOES NOT
 SPECIFICALLY CALL OUT SMOKE DETECTORS IN THE STAIRWAY
 PRESSURIZATION DUCTS ON PAGE 28 OF THE ANALYSIS. SMOKE
 DETECTORS ARE REQUIRED IN THE ELEVATOR HOISTWAY
 PRESSURIZATION FAN SYSTEMS- SECTION 909.21.4.2 FBC B,
 HOWEVER THERE IS NO CORRELATING REQUIREMENT IN THE CODE
 FOR PRESSURIZED STAIRWAYS, EXCEPT THE REQUIREMENT UNDER
 SECTION 606.2.1. AS PREVIOUSLY REQUESTED PROVIDE A
 SEQUENCE OF OPERATION AND CLARIFY HOW WILL THESE
 DETECTORS WILL INTERACT WITH THE SMOKE CONTROL
 SEQUENCING PROCEDURES IN THE EVENT OF AN EMERGENCY
 ALARM.
  
  
 THE FOLLOWING INFORMATION COPIED FOR REFERENCE:
  
 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE
 WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND
 LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17
 ENERGY CONSERVATION.
 PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW.
  
 C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS,
 THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE
 AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN
 ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
  
 C408.2.1. COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
  
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS
 REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN
 THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES
 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE
 TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A
 REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN
 FIRE PROTECTION ENGINEERING AND/OR MECHANICAL
 ENGINEERING.
 PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM,
 DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED
 TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR
 AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED
 TO BE REVIEWED BY THE WPB BUILDING AND FIRE
 DEPARTMENTS.
 PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE
 PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED
 BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT
 SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE
 DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED
 IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER)
 IN THE BUILDING.
  
 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST
 HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND
 FREEZERS.
  
 4) REQUIRED SUBMITTALS:
  
 A) COMMISSION PLAN AND FINAL REPORT.
 B) SMOKE CONTROL TESTING AND FINAL REPORTS.
 C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS.
 D) MOTORIZED AND BAROMETRIC DAMPERS
 E) DUCT SMOKE DETECTORS
 F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING
 MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS
 AND/OR MIAMI-DADE NOA'S
 G) C02 AND N02 SENSORS
 H) COOLING TOWERS
 I) GENERATOR
 J) ACCESS PANELS
 K) DUCT FIRE WRAPPING
 L) FIRESTOPPING AND FIRE CAULKING
 M) CONDENSER WATER PIPING AND PIPE INSULATION.
 N) BOILERS AND WATER HEATERS, PIPING AND INSULATION
 O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP
 FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL.
 PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE
 STANDS.
 P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS.
 PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL
 BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN
 PROFESSIONAL OF RECORD.
  
 DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT
 ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED
 BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved