| Date |
Text |
| 2019-02-13 12:56:20 | 2ND REVIEW FBC-2017 MECHANICAL |
| | PERMIT #18081528 |
| | 1515 S FLAGLER DR. |
| | 2/12/19 |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE REVISED ENERGYGAUGE COMPLIANCE FORM IS STILL |
| | MISSING COMPLIANCE DATA FOR THE VERTICAL HEAT PUMPS |
| | WITH THE EXCEPTION OF HP-3L-2. |
| | |
| | 2) SHEET M001: THE REVISED VENTILATION CALCULATIONS ARE |
| | NOT IN COMPLIANCE WITH TABLE 403.3.1.1. FBC M, OR |
| | ASHRAE 62.1- 2013. |
| | A) LOBBY AND RECEPTION ROOMS AND AREAS ARE CALCULATED |
| | AT 30 PERSONS PER 1000 SF. |
| | B) MEETING & MULTI-PURPOSE- 120 PERSONS PER 1000 SF. |
| | C) FITNESS- 40 PERSONS PER 1000 SF. |
| | D) LOUNGE- 150 PERSONS PER 1000 SF. |
| | PLEASE REFER TO SECTION 403.3.1.1 OUTDOOR AIRFLOW RATE |
| | FBC M: |
| | VENTILATION SYSTEMS SHALL BE DESIGNED TO HAVE THE |
| | CAPACITY TO SUPPLY THE MINIMUM OUTDOOR AIRFLOW RATE, |
| | DETERMINED IN ACCORDANCE WITH THIS SECTION. IN EACH |
| | OCCUPIABLE SPACE, THE VENTILATION SYSTEM SHALL BE |
| | DESIGNED TO DELIVER THE REQUIRED RATE OF OUTDOOR |
| | AIRFLOW TO THE BREATHING ZONE. THE OCCUPANT LOAD |
| | UTILIZED FOR DESIGN OF THE VENTILATION SYSTEM SHALL BE |
| | NOT LESS THAN THE NUMBER DETERMINED FROM THE ESTIMATED |
| | MAXIMUM OCCUPANT LOAD RATE INDICATED IN TABLE |
| | 403.3.1.1. VENTILATION RATES FOR OCCUPANCIES NOT |
| | REPRESENTED IN TABLE 403.3.1.1 SHALL BE THOSE FOR A |
| | LISTED OCCUPANCY CLASSIFICATION THAT IS MOST SIMILAR IN |
| | TERMS OF OCCUPANT DENSITY, ACTIVITIES AND BUILDING |
| | CONSTRUCTION; OR SHALL BE DETERMINED BY AN APPROVED |
| | ENGINEERING ANALYSIS. THE VENTILATION SYSTEM SHALL BE |
| | DESIGNED TO SUPPLY THE REQUIRED RATE OF VENTILATION AIR |
| | CONTINUOUSLY DURING THE PERIOD THE BUILDING IS |
| | OCCUPIED, EXCEPT AS OTHERWISE STATED IN OTHER |
| | PROVISIONS OF THE CODE. |
| | WITH THE EXCEPTION OF SMOKING LOUNGES, THE VENTILATION |
| | RATES IN TABLE 403.3.1.1 ARE BASED ON THE ABSENCE OF |
| | SMOKING IN OCCUPIABLE SPACES. WHERE SMOKING IS |
| | ANTICIPATED IN A SPACE OTHER THAN A SMOKING LOUNGE, THE |
| | VENTILATION SYSTEM SERVING THE SPACE SHALL BE DESIGNED |
| | TO PROVIDE VENTILATION OVER AND ABOVE THAT REQUIRED BY |
| | TABLE 403.3.1.1 IN ACCORDANCE WITH ACCEPTED ENGINEERING |
| | PRACTICE. |
| | EXCEPTION: THE OCCUPANT LOAD IS NOT REQUIRED TO BE |
| | DETERMINED BASED ON THE ESTIMATED MAXIMUM OCCUPANT LOAD |
| | RATE INDICATED IN TABLE 403.3.1.1 WHERE APPROVED |
| | STATISTICAL DATA DOCUMENT THE ACCURACY OF AN ALTERNATE |
| | ANTICIPATED OCCUPANT DENSITY. |
| | |
| | 4) SHEET M100, M101A & M101B: COMMENT #10 FROM THE 1ST |
| | REVIEW CONCERNING MECHANICAL EQUIPMENT INSTALLED BELOW |
| | FLOOD ELEVATION WILL STAND UNTIL EVIDENCE OF COMPLIANCE |
| | IS PROVIDED BY SUBMITTAL OF THE ELEVATION CERTIFICATE. |
| | |
| | 5) M100, M101A & B: COMMENT #13B FROM THE 1ST REVIEW IS |
| | STILL NOT RESOLVED. REQUIRED EXHAUST VENTILATION FOR |
| | BASEMENT AND GROUND FLOOR GARAGES- (32407 + 41182 = |
| | 73589 CFMS). TOTAL EXHAUST CAPACITY OF EXHAUST FANS- |
| | (70,800 CFMS). PLEASE NOTE THAT SHEET M101B INDICATES |
| | THE REQUIRED EXHAUST VENTILATION FOR THE BASEMENT |
| | GARAGE TO BE (36258 CFMS), AS OPPOSED TO (32407 CFMS) |
| | SHOWN ON SHEET M100. |
| | |
| | 6) M100, M101A & B: AS NOTED IN 1ST REVIEW COMMENT |
| | #13C, THE LOCATIONS OF THE EXHAUST INLETS FOR THE |
| | GARAGE EXHAUST DO NOT APPEAR TO BE IN THE AREAS OF THE |
| | HEAVIEST CONCENTRATIONS OF CONTAMINANTS BECAUSE THEY |
| | ARE LOCATED ONLY ON THE EAST SIDE OF THE GARAGES. IT IS |
| | ACKNOWLEDGED THAT THE NEW CIRCULATION FANS MAY HELP TO |
| | MOVE THE CONTAMINATED AIR FROM THE WEST END TO THE |
| | EAST, HOWEVER THIS WILL HAVE TO BE CONFIRMED BY FIELD |
| | TESTING WHICH WILL BE REQUIRED FOR FINAL APPROVAL. |
| | |
| | 7) M100: PLEASE CLARIFY THE RESPONSE TO COMMENT #13F |
| | CONCERNING THE FD'S IN THE AIR SHAFT. THE NARRATIVE |
| | STATES THERE IS "NO SEQUENCE OF OPERATIONS". PLEASE |
| | EXPLAIN WHAT WILL CAUSE THE DAMPERS TO CLOSE- FUSIBLE |
| | LINK? |
| | |
| | 8) M100 & M101A: THE LOCATION OF THE BASEMENT AIR SHAFT |
| | OPENING DOES NOT APPEAR TO HAVE A MINIMUM 10' CLEARANCE |
| | FOR THE GARAGE DRIVEWAY AREA- SEE SECTION 401.4 (2) FBC |
| | M. |
| | |
| | 9) M100, M101A & B: THE GARAGE CIRCULATION FANS SHALL |
| | BE INSTALLED A MINIMUM OF 8' ABOVE THE FINISHED FLOOR |
| | OF THE GARAGE. THE NOTE ON THE PLAN INDICATES 7'0" |
| | HIGH. |
| | |
| | 10) M101A: ADDITIONAL INFORMATION AND SPECIFICATIONS |
| | FOR THE GENERATOR ARE REQUIRED. |
| | A) SEE TABLE 4.1(A) AND 4.2 NFPA 110-2013 AND INDICATE |
| | THE"CLASSIFICATION" OF THE EMERGENCY GENERATOR (EPSS). |
| | B) SEE TABLE 4.1(B) AND SECTION 4.3 AND INDICATE THE |
| | "TYPE" OF EPSS. |
| | C) SEE SECTION 4.4 AND INDICATE WHICH "LEVEL" EPSS |
| | SYSTEM IS TO BE INSTALLED- LEVEL 1 OR LEVEL 2. |
| | D) VERIFY COMPLIANCE WITH SECTION 7.7.1 WHICH REQUIRES |
| | THE VENTILATION AIRFLOW FOR THE EPS ROOM TO BE CAPABLE |
| | OF LIMITING THE MAXIMUM AIR TEMPERATURE AIR TEMPERATURE |
| | IN THE ROOM PER MANUFACTURER'S RECOMMENDATIONS. |
| | E) INDICATE THE EPSS STANDBY LOADS AND EMERGENCY LOADS |
| | AS OUTLINED IN SECTIONS 403.4.8.3 AND 403.4.8.4 FBC B. |
| | F) INDICATE WHICH STANDARD WAS USED TO CALCULATE THE |
| | AIR CHANGES IN THE EPSS ROOM. |
| | G) VERIFY THERE WILL BE A MINIMUM 10' CLEARANCE |
| | PROVIDED FROM THE RADIATOR DISCHARGE TO THE AIR INTAKE |
| | LOUVER. |
| | H) VERIFY MINIMUM 10' CLEARANCE FROM THE ENGINE EXHAUST |
| | PIPE TERMINATION TO ANY AIR INTAKES INTO THE BUILDING. |
| | I) FUEL OIL TANK: SHOW THE TYPE AND SIZE OF TANK VENT |
| | PIPE, SHOW THE PIPE RUN AND TERMINATION LOCATION. |
| | J) FUEL OIL FILL PIPING: SHOW THE TYPE AND SIZE OF FILL |
| | PIPING, EXTERIOR FILL PIPE LOCATION, AND PIPING RUN TO |
| | THE TANK. |
| | |
| | 11) M101A, POOL EQUIPMENT ROOM: |
| | A) PROVIDE EQUIPMENT SCHEDULES FOR THE POOL BOILERS. |
| | THE BOILERS ARE ASSUMED TO BE GAS-FIRED BASED ON THE 6" |
| | FLUES. AS PREVIOUSLY NOTED A VESTIBULE IS REQUIRED |
| | BETWEEN THE EQUIPMENT ROOM AND THE GARAGE. |
| | 305.3.2 PARKING GARAGES. CONNECTION OF A PARKING GARAGE |
| | WITH ANY ROOM IN WHICH THERE IS A FUEL-FIRED APPLIANCE |
| | SHALL BE BY MEANS OF A VESTIBULE PROVIDING A |
| | TWO-DOORWAY SEPARATION, EXCEPT THAT A SINGLE DOOR IS |
| | PERMITTED WHERE THE SOURCES OF IGNITION IN THE |
| | APPLIANCE ARE ELEVATED IN ACCORDANCE WITH SECTION |
| | 305.3. EXCEPTION: THIS SECTION SHALL NOT APPLY TO |
| | APPLIANCE INSTALLATIONS COMPLYING WITH SECTION 305.4. |
| | B) IT APPEARS THAT COMBUSTION AIR FOR THE BOILERS IS |
| | BEING TAKEN FROM THE ENCLOSED GARAGE WHICH IS |
| | PROHIBITED- SECTION 304.9 FBC FG AND TABLE 403.3.1.1 |
| | FBC M. |
| | C) THERE APPEARS TO BE A LOUVERED OPENING IN THE EAST |
| | SIDE OF THE EQUIPMENT ROOM WHICH WOULD REQUIRE A FIRE |
| | DAMPER, HOWEVER THIS OPENING IS NOT PERMITTED TO |
| | PROVIDE MAKEUP AIR FROM THE ENCLOSED GARAGE FOR PEEF-2, |
| | OR COMBUSTION AIR FOR THE BOILERS BECAUSE EACH MUST BE |
| | TAKEN FROM THE OUTDOORS AS PREVIOUSLY NOTED ABOVE. |
| | D) PLEASE INDICATE WHICH STANDARD OR METHOD WAS USED |
| | FOR THE POOL EQUIPMENT ROOM EXHAUST VENTILATION |
| | CALCULATION. |
| | E) INDICATE THE TYPE OF VENT FLUE PIPING AND EXHAUST |
| | DUCT TO BE INSTALLED. |
| | F) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE POOL |
| | HEATERS AND FLUE PIPING. (MAY BE DEFERRED SUBMITTALS |
| | |
| | 12) M101A, M101B B, M-708: COMMENTS #19A, 22, 23 & 24 |
| | FROM THE 1ST REVIEW ARE STILL NOT RESOLVED. FIRE |
| | DAMPERS ARE NOT SHOWN FOR THE EF-IL-4 & 5 EXHAUST DUCTS |
| | PENETRATING THE 2HR FIRE-RATED EXTERIOR WALLS OF THE |
| | WATER PUMP ROOM. PROVIDE EXHAUST VENTILATION |
| | CALCULATIONS AND THE SEQUENCES OF OPERATIONS FOR |
| | EF-1L-2, 3, 4 & 5. |
| | |
| | 13) M-101B, & M-706: IMPACT PROTECTION FOR THE GARAGE |
| | EXHAUST FANS NOT PROVIDED- 9N-3 FAC. |
| | |
| | 14) M102A: IT IS NOT CLEAR WHERE THE POOL EXHAUST DUCT |
| | AND BOILER VENT FLUES ARE TERMINATING. PLEASE PROVIDE |
| | NOTES AND DETAILS TO CLARIFY. A) INDICATE HOW THE DUCT |
| | AND FLUE WILL BE SUPPORTED AND ANCHORED TO RESIST WIND |
| | PRESSURES- SECTION 301.15 FBC M. |
| | |
| | 15) M102A: COMMENT #26 FROM THE 1ST REVIEW NOT |
| | RESOLVED- IDENTIFY THE ROOM TO THE WEST OF CHNG RM |
| | 1134. |
| | |
| | 16) M102A, M102B: COMMENT #27 FROM THE 1ST REVIEW NOT |
| | RESOLVED- VENTILATION FOR THE TRASH ROOM NOT PROVIDED. |
| | |
| | 17) M102B: THE NARRATIVE RESPONSE TO COMMENT #30 |
| | INDICATES A NEW UPDATED PLAN SHEET WAS UPLOADED, |
| | HOWEVER THIS SHEET WAS NOT PROVIDED. |
| | |
| | 18) M103: COMMENT #33 FROM THE 1ST REVIEW NOT RESOLVED. |
| | THE NARRATIVE STATES ALL "TO BE PROVIDED BY THE |
| | ARCHITECT", HOWEVER, I AM NOT SEEING ANY ARCHITECTURAL |
| | PLANS FOR THE KITCHEN, EQUIPMENT SCHEDULE, OR THE |
| | REQUESTED AIR BALANCE CALCULATION. |
| | |
| | 19) M103: COMMENTS #33 & 34 WILL STAND UNTIL FURTHER |
| | INFORMATION ABOUT THE KITCHEN IS PROVIDED. |
| | |
| | 20) M104, 106, 107, & 108: COMMENTS #36 & 37 FROM THE |
| | 1ST REVIEW STILL NOT RESOLVED- THE PLAN SHEETS HAVE NOT |
| | BEEN UPDATED. |
| | |
| | 21) M104: COMMENT #38 NOT RESOLVED. FD'S MISSING FOR |
| | O/A DUCTS PENETRATING FIRE-RATED CORRIDOR WALLS AT |
| | FOYER 643 AND ELECT RM 403. |
| | |
| | 22) M107 & M701: COMMENT #39 FROM THE 1ST REVIEW NOT |
| | RESOLVED. PLEASE PROVIDE AN ENLARGED PLAN FOR THE |
| | BOILER ROOM SHOWING THE LOCATIONS OF ALL EQUIPMENT AND |
| | WORKING CLEARANCES. INCLUDE AN EQUIPMENT SCHEDULE AND |
| | SUBMIT SPECS FOR ALL EQUIPMENT. A) PROVIDE VENTILATION |
| | FOR THE ROOM. |
| | |
| | 23) M707 & M103: COMMENT #40 FROM THE 1ST REVIEW NOT |
| | RESOLVED. PROVIDE DETAILS SHOWING HOW THE |
| | PRESSURIZATION DUCTS WILL CONNECT INTO THE INTERIOR |
| | EXIT STAIRWAYS AND HOISTWAYS. WILL FSD'S BE INSTALLED |
| | AT THESE LOCATIONS? WILL FLAMEBAR BE USED OR DUCTS |
| | ENCLOSED WITH 2HR FIRE-RATED DUCTWRAP? |
| | |
| | 24) M103: THE SMOKE DETECTORS SHOWN IN THE |
| | PRESSURIZATION DUCTS ARE NOT INCLUDED IN THE SLS SMOKE |
| | CONTROL REPORT. PLEASE CONSULT WITH THE SMOKE CONTROL |
| | ENGINEER AND HAVE THE REPORT REVISED, AND PROVIDE NOTES |
| | ON THE PLAN TO CLARIFY THEIR SEQUENCE OF OPERATION. |
| | |
| | 25) M109: COMMENT #41 FROM THE 1ST REVIEW NOT RESOLVED. |
| | DS DETECTORS REQUIRED IN THE SUPPLY SYSTEMS OF THE |
| | 5-TON HP'S. |
| | |
| | 26) M110: COMMENT #42- IT IS ACKNOWLEDGED THAT WIND |
| | LOAD ENGINEERING WILL BE DEFERRED. |
| | |
| | 27) M110: THE SMOKE DETECTORS SHOWN IN THE |
| | PRESSURIZATION DUCTS ARE NOT INCLUDED IN THE SLS SMOKE |
| | CONTROL REPORT. PLEASE CONSULT WITH THE SMOKE CONTROL |
| | ENGINEER AND HAVE THE REPORT REVISED, AND PROVIDE NOTES |
| | ON THE PLAN TO CLARIFY THEIR SEQUENCE OF OPERATION. |
| | PLEASE NOTE ACCORDING TO THE REPORT, SMOKE DETECTORS |
| | ARE REQUIRED AT THE TOP OF THE HOISTWAY ENCLOSURES. |
| | |
| | 28) M220-229 A: COMMENT #44 NOTE RESOLVED. A) EVIDENCE |
| | OF UL LISTING AND LABELING FOR THE MIELE ELECTRIC |
| | COOKING APPLIANCES AND RANGE HOOD NOT PROVIDED- SECTION |
| | 917.1 AND 505.1 EXCEPTION 1 FBC M. B) EVIDENCE OF ANSI |
| | TESTING APPROVAL FOR THE GAS-FIRED COOKING APPLIANCES |
| | NOT PROVIDED- SECTION 623.1 FBC FG. C) EVIDENCE OF UL |
| | LISTING AND LABELING FOR THE VENTLESS DRYERS NOT |
| | PROVIDED, AND INSTALLATION INSTRUCTIONS ARE REQUIRED- |
| | SECTION 504.21 EXCEPTION FBC M. PLEASE CLARIFY WHY |
| | SPECS FOR VENTLESS DRYERS HAVE BE SUBMITTED BUT THE |
| | PLANS SHOW DYER EXHAUST DUCT RUNS |
| | |
| | 29) M222: COMMENT #45B NOT RESOLVED. PROVIDE RETURN AIR |
| | FROM BEDROOM #2. |
| | |
| | 30) M224: COMMENT #45D NOT RESOLVED. THE TRANSFER |
| | GRILLS ARE STILL UNDERSIZED- SEE SECTION 601.6 |
| | EXCEPTIONS 2 & 3. PLEASE NOTE THE KITCHEN EXHAUST FAN |
| | IS MISSING- SEE TABLE 403.3.1.1 FBC M. |
| | |
| | 31) M227: COMMENT #45G NOT RESOLVED. THE MASTER BEDROOM |
| | TRANSFER GRILL IS UNDERSIZED- SEE SECTION 601.6 |
| | EXCEPTIONS 2 & 3. |
| | |
| | 32) M229: COMMENT 45H-3, 4, & 5 NOT RESOLVED- PLEASE |
| | COMPLY. 3) PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY |
| | SYSTEM OF HP-H. 4) LABEL ALL THE HP'S IN THE SPACE. 5) |
| | BEDROOM #2 & 3 TRANSFER DUCTS ARE UNDERSIZED. |
| | |
| | 33) M502: COMMENTS #55 & 56 PRINTED BELOW NOT RESOLVED- |
| | THE UPDATED PLANS WAS NOT SUBMITTED. |
| | |
| | 54) M502: THE DUCTWORK CONNECTING THE PRESSURIZATION |
| | FANS TO THE SHAFTS SHALL BE FIRE-RATED PER SECTION- |
| | 909.21.3 FBC B. |
| | |
| | 55) M502: THE HOISTWAY SHAFT VENTS SHALL BE PROVIDED |
| | WITH CLASS I MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE |
| | RATE OF 4 CFM/FT2 AT 1.0 INCH WATER GAUGE (W.G.) (249 |
| | PA) WHEN TESTED IN ACCORDANCE WITH AMCA 500D- SECTION |
| | C403.2.4.3 FBC M. |
| | |
| | COMMENTS LISTED BELOW FROM THE 1ST REVIEW ARE COPIED |
| | FOR REFERENCE. |
| | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL |
| | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE |
| | PROJECT WILL BE REQUIRED TO ATTEND A MEETING AT THE WPB |
| | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL |
| | INSPECTOR , PLANS EXAMINER, AND OTHERS- TO DISCUSS |
| | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE |
| | DEFERRED SUBMITTAL PROCESS. |
| | |
| | 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE |
| | WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND |
| | LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17 |
| | ENERGY CONSERVATION. |
| | PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW. |
| | C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING |
| | SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS. |
| | PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, |
| | THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, |
| | MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE |
| | EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND |
| | COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS |
| | SECTION. |
| | CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE |
| | PROVISIONS FOR COMMISSIONING AND COMPLETION |
| | REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE |
| | PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER |
| | REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE |
| | GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE |
| | AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN |
| | ACCORDANCE WITH SECTIONS |
| | C408.2.4 AND C408.2.5. |
| | |
| | C408.2.1. COMMISSIONING PLAN. |
| | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED |
| | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL |
| | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE |
| | FOLLOWING ITEMS: |
| | |
| | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL |
| | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, |
| | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF |
| | THE ACTIVITIES. |
| | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR |
| | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO |
| | BE PERFORMED. |
| | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED |
| | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. |
| | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. |
| | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN |
| | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. |
| | 5. MEASURABLE CRITERIA FOR PERFORMANCE' |
| | |
| | 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS |
| | REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN |
| | THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES |
| | 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE |
| | TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A |
| | REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN |
| | FIRE PROTECTION ENGINEERING AND/OR MECHANICAL |
| | ENGINEERING. |
| | PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM, |
| | DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED |
| | TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR |
| | AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED |
| | TO BE REVIEWED BY THE WPB BUILDING AND FIRE |
| | DEPARTMENTS. |
| | PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE |
| | PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED |
| | BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT |
| | SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE |
| | DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED |
| | IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER) |
| | IN THE BUILDING. |
| | |
| | 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST |
| | HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND |
| | FREEZERS. |
| | |
| | 4) REQUIRED SUBMITTALS: |
| | |
| | A) COMMISSION PLAN AND FINAL REPORT. |
| | B) SMOKE CONTROL TESTING AND FINAL REPORTS. |
| | C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS. |
| | D) MOTORIZED AND BAROMETRIC DAMPERS |
| | E) DUCT SMOKE DETECTORS |
| | F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING |
| | MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS |
| | AND/OR MIAMI-DADE NOA'S |
| | G) C02 AND N02 SENSORS |
| | H) COOLING TOWERS |
| | I) GENERATOR |
| | J) ACCESS PANELS |
| | K) DUCT FIRE WRAPPING |
| | L) FIRESTOPPING AND FIRE CAULKING |
| | M) CONDENSER WATER PIPING AND PIPE INSULATION. |
| | N) BOILERS AND WATER HEATERS, PIPING AND INSULATION |
| | O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP |
| | FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL. |
| | PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE |
| | STANDS. |
| | P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS. |
| | PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL |
| | BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN |
| | PROFESSIONAL OF RECORD. |
| | |
| | DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED |
| | BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |