| Date |
Text |
| 2019-02-12 09:17:38 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1. |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 |
| | 6TH EDITION |
| | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 |
| | 6TH EDITION |
| | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION |
| | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE |
| | FS = FLORIDA STATUTES |
| | |
| | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED |
| | SATISFACTORILY HAVE BEEN REMOVED. PREVIOUS COMMENTS |
| | THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY HAVE |
| | ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW COMMENTS |
| | WILL BE LISTED AFTER PREVIOUS COMMENTS. |
| | |
| | |
| | 14. SHEET E-102B, CIRCUIT AL-17 IS SHOWN FEEDING THE |
| | TRATAM ROOM. WHAT IS THIS ROOM USED FOR, IS GFCI |
| | PROTECTION REQUIRED. PROVIDE CLARIFICATION AND/OR |
| | CORRECTION. NEC 210.8; WPB FBC 107.2.1 (BASED ON |
| | DESCRIPTION PROVIDED, GFCI PROTECTION IS REQUIRED. |
| | PROVIDE CORRECTION. NEC 210.8(B)(7) ) |
| | 15. SHEET E-102B, CIRCUIT AL-1, 3, 5 IS SHOWN FEEDING |
| | HP-2L-2, BUT THE PANEL SCHEDULE SHOWS CIRCUIT 1 AND 3 |
| | FEEDING POOL RECEPTACLES. PROVIDE CORRECTION. WPB FBC |
| | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED |
| | SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | 16. SHEET E-103, ALL RECEPTACLE OUTLETS IN CATERING |
| | KITCHEN AND PERFORMANCE KITCHEN REQUIRE GFCI |
| | PROTECTION. PROVIDE CORRECTION. NEC 210.8(B)(2) (IT |
| | SEEMS WE DID NOT RECEIVE THE CORRECTED SHEET, THIS |
| | INFORMATION IS STILL SHOWN.) |
| | 84. LIGHTING SHEETS (ALL) DO NOT SHOW THE AUTOMATIC |
| | CONTROL REQUIRED. PROVIDE THE ADDITIONAL AUTOMATIC |
| | LIGHTING CONTROLS STIPULATED IN THE FBC ENERGY CODE. |
| | FBC EC C405.2 (NOT PROVIDED, THIS IS FOR INTERIOR |
| | SPACES NOT PART OF A DWELLING UNIT.) |
| | 85. PROVIDE GRAPH/CALCULATION OF EXTERIOR LIGHTING |
| | POWER ALLOWANCES PER THE FBC ENERGY CONSERVATION IN |
| | RELATION TO THE CONNECTED EXTERIOR LIGHTING PROPOSED TO |
| | COMPLY WITH CODE. FBC EC C405.5.1 (NOT PROVIDED.) |
| | 87. SHEET E-501, LABEL ALL FEEDERS TO SHOW WIRE AND |
| | CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 (FROM FPL |
| | VAULT TO MAINS NOT SHOWN.) |
| | 91. SHEET E-502, LABEL ALL FEEDERS TO SHOW WIRE AND |
| | CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 (FROM FPL |
| | VAULT TO MAINS NOT SHOWN. TRANSFORMER SCHEDULE PASTED |
| | OVER RISER AND IS DIFFICULT TO READ.) |
| | 94. PROVIDE DETAILS OF ARC FLASH MITIGATION FOR ALL |
| | MAINS PER CODE. NEC 240.87 (ARC FAULT MITIGATION IS NOT |
| | RELIANT ON THE AIC CALCULATION. SEE CODE SECTION FOR |
| | METHODS OF COMPLIANCE.) |
| | 95. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR |
| | EACH PANEL INCLUDING INFORMATION FROM THE POWER COMPANY |
| | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR |
| | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE |
| | SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE. |
| | NEC 110.9, 110.10 (NOT PROVIDED, NOTED THAT THE |
| | APPLICANT IS WAITING ON FPL. THIS CAN BE A DEFERRED |
| | SUBMITTAL IF YOU CHOOSE. BE AWARE THAT APPLICANT WOULD |
| | BE PROCEEDING AT YOUR OWN RISK UNTIL THIS INFORMATION |
| | IS OBTAINED. IF SO DESIRED, PROVIDE NOTE ON PLAN TO |
| | THAT EFFECT.) |
| | 96. ON RISER DIAGRAM PANEL EQPH IS SHOWN AS A 100 AMP |
| | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS |
| | SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC |
| | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED |
| | PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | 97. ON RISER DIAGRAM PANEL EQEH IS SHOWN AS A 1200 AMP |
| | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS |
| | SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC |
| | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED |
| | PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | 98. ON RISER DIAGRAM PANEL EDPH IS SHOWN AS A 600 AMP |
| | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS |
| | SHOWN AS AN 1200 AMP PANEL. PROVIDE CORRECTION. WPB FBC |
| | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED |
| | PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | 102. AS ADJUSTMENTS ARE MADE TO DISCREPANCIES IN PLAN, |
| | PROVIDE UPDATED LOAD CALCULATION FOR EACH PANEL AND |
| | SERVICE. NEC 220 (IT SEEMS WE DID NOT RECEIVE THE |
| | CORRECTED SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | 103. SHEET E-601A, LOADS LISTED FOR LOAD CALCULATION |
| | SHOWN ARE MUCH DIFFERENT THAN THE LOADS SHOWN IN THE |
| | CORRESPONDING PANEL SCHEDULES. PROVIDE CLARIFICATION |
| | AND CORRECTION. WPB FBC 107.2.1; NEC 220 (IT SEEMS WE |
| | DID NOT RECEIVE THE CORRECTED SHEET, THIS INFORMATION |
| | IS STILL SHOWN.) |
| | 104. WHERE ARE ELEVATORS FED FROM? I COULD NOT FIND |
| | THIS LOAD INCLUDED IN THE LOAD CALCULATION OR IN ANY |
| | PANEL SCHEDULES. PROVIDE CORRECTION. WPB FBC 107.2.1; |
| | NEC 220 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED |
| | SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | 105. MANY OF THE PANEL SCHEDULES PROVIDED ARE |
| | INCOMPLETE. HOW CAN AN ACCURATE LOAD CALCULATION BE |
| | PROVIDED WITH THIS MUCH MISSING INFORMATION. PROVIDE |
| | CORRECTION. WPB FBC 107.2.1; NEC 220 (IT SEEMS WE DID |
| | NOT RECEIVE THE CORRECTED SHEET, THIS INFORMATION IS |
| | STILL SHOWN.) |
| | 106. RISER DIAGRAM STATES THAT MDP1 IS ONE OF THE |
| | MAINS. THE PANEL SCHEDULE FOR THIS PANEL DOES NOT SHOW |
| | A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; NEC 230.2 |
| | (IT SEEMS WE DID NOT RECEIVE THE CORRECTED SHEET, THIS |
| | INFORMATION IS STILL SHOWN.) |
| | 107. LOAD FOR PANEL H SHOWN IN PANEL SCHEDULE FOR PANEL |
| | MDP1 IS MUCH DIFFERENT THAN THE LOAD SHOWN IN THE PANEL |
| | SCHEDULE FOR PANEL H. PROVIDE CORRECTION. WPB FBC |
| | 107.2.1; NEC 220 (IT SEEMS WE DID NOT RECEIVE THE |
| | CORRECTED SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | 108. RISER DIAGRAM STATES THAT THE EMERGENCY MAINS ARE |
| | MAINS 2 AND 3. THE PANEL SCHEDULE FOR THESE PANELS DOES |
| | NOT SHOW A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; |
| | NEC 230.2 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED |
| | SHEET, THIS INFORMATION IS STILL SHOWN.) |
| | |
| | NEW COMMENTS: |
| | |
| | 109. PROVIDE LEGIBLE SHEET FOR E-502. THERE ARE |
| | GENERATOR SPECS PASTED OVER THE DRAWING KEYNOTES, |
| | MAKING PART OF THIS SHEET ILLEGIBLE. WPB FBC 107.2.1 |
| | 110. CORRECT DISCREPANCY FOR 75KVA TRANSFORMER FEEDING |
| | PANEL RL. RISER SHOWS IT BEING FED FROM PANEL RH. PANEL |
| | SCHEDULE SHOWS IT BEING FED FROM PANEL RDH. WPB FBC |
| | 107.2.1 |
| | 111. PROVIDE PANEL SCHEDULE FOR ALL PANELS. SOME ARE |
| | MISSING, SUCH AS RDEH AND RH. WPB FBC 107.2.1; NEC |
| | 408.4 |
| | 112. SHEET E-701, GENERATOR AND EMERGENCY ROOM ? |
| | ENLARGED PLAN, IT APPEARS THERE IS A WALL BUILT IN |
| | FRONT OF PANELS EOPH, EOL, EQEH, EQH, EQL, AND THE TWO |
| | TRANSFORMERS ON THAT WALL. PROVIDE CLARIFICATION AND/OR |
| | CORRECTION. NEC 110.26; WPB FBC 107.2.1 |
| | 113. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS, |
| | DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD |
| | SYSTEMS, WALK IN COOLERS, SIGNS, SITE LIGHTING, AND |
| | SWIMMING POOLS (WHERE APPLICABLE) ARE NOT INCLUDED IN |
| | THE SCOPE OF THIS PLAN REVIEW. PROVIDE A BLOCK NOTE |
| | INDICATING THE REQUIRED SEPARATE PERMITS AND PLAN |
| | SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC |
| | 105.1, 107.2.1 |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY |
| | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED |
| | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD |
| | SHEETS. |
| | |
| | SINCERELY, |
| | |
| | JOHN PEARSON |
| | ELECTRICAL PLANS EXAMINER |
| | 561-805-6746 |
| | [email protected] |
| | |
| | |