| 2018-11-01 10:47:34 | |
| | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #18081528 |
| | 1515 S FLAGLER DR. |
| | 10/31/18 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES |
| | THAT ARE LISTED BELOW. |
| | COMMENTS #1-4 ADDRESS APPROVED SUBMITTALS THAT WILL BE |
| | REQUIRED IN ORDER TO RECEIVE A FINAL MECHANICAL |
| | INSPECTION APPROVAL AND CO FOR THE PROJECT. |
| | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL |
| | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE |
| | PROJECT WILL BE REQUIRED TO ATTEND A MEETING AT THE WPB |
| | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL |
| | INSPECTOR , PLANS EXAMINER, AND OTHERS- TO DISCUSS |
| | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE |
| | DEFERRED SUBMITTAL PROCESS. |
| | |
| | 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE |
| | WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND |
| | LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17 |
| | ENERGY CONSERVATION. |
| | PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW. |
| | |
| | C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING |
| | SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS. |
| | PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, |
| | THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, |
| | MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE |
| | EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND |
| | COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS |
| | SECTION. |
| | CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE |
| | PROVISIONS FOR COMMISSIONING AND COMPLETION |
| | REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE |
| | PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER |
| | REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE |
| | GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE |
| | AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN |
| | ACCORDANCE WITH SECTIONS |
| | C408.2.4 AND C408.2.5. |
| | |
| | C408.2.1. COMMISSIONING PLAN. |
| | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED |
| | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL |
| | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE |
| | FOLLOWING ITEMS: |
| | |
| | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL |
| | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, |
| | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF |
| | THE ACTIVITIES. |
| | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR |
| | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO |
| | BE PERFORMED. |
| | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED |
| | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. |
| | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. |
| | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN |
| | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. |
| | 5. MEASURABLE CRITERIA FOR PERFORMANCE' |
| | |
| | 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS |
| | REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN |
| | THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES |
| | 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE |
| | TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A |
| | REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN |
| | FIRE PROTECTION ENGINEERING AND/OR MECHANICAL |
| | ENGINEERING. |
| | PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM, |
| | DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED |
| | TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR |
| | AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED |
| | TO BE REVIEWED BY THE WPB BUILDING AND FIRE |
| | DEPARTMENTS. |
| | PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE |
| | PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED |
| | BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT |
| | SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE |
| | DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED |
| | IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER) |
| | IN THE BUILDING. |
| | |
| | 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST |
| | HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND |
| | FREEZERS. |
| | |
| | 4) REQUIRED SUBMITTALS: |
| | |
| | A) COMMISSION PLAN AND FINAL REPORT. |
| | B) SMOKE CONTROL TESTING AND FINAL REPORTS. |
| | C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS. |
| | D) MOTORIZED AND BAROMETRIC DAMPERS |
| | E) DUCT SMOKE DETECTORS |
| | F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING |
| | MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS |
| | AND/OR MIAMI-DADE NOA'S |
| | G) C02 AND N02 SENSORS |
| | H) COOLING TOWERS |
| | I) GENERATOR |
| | J) ACCESS PANELS |
| | K) DUCT FIRE WRAPPING |
| | L) FIRESTOPPING AND FIRE CAULKING |
| | M) CONDENSER WATER PIPING AND PIPE INSULATION. |
| | N) BOILERS AND WATER HEATERS, PIPING AND INSULATION |
| | O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP |
| | FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL. |
| | PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE |
| | STANDS. |
| | P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS. |
| | PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL |
| | BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN |
| | PROFESSIONAL OF RECORD. |
| | |
| | DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED |
| | BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | 5) ENERGYGAUGE COMPLIANCE FORM SUBMITTAL: PLEASE REVIEW |
| | THE FORM AND COMPARE WITH THE AC SCHEDULES ON SHEETS |
| | M601 & M602. IN ADDITION TO THE SYSTEMS' |
| | IDENTIFICATIONS (ID'S) LISTED IN THE FORM NOT MATCHING |
| | THE ID'S LISTED IN THE SCHEDULES, THERE ARE NUMEROUS |
| | INCONSISTENCIES AND SYSTEM OMISSIONS. |
| | |
| | A) THE OAU IS LISTED AS AN RTU AND HAS INCORRECT |
| | COMPLIANCE DATA-CAPACITY AND DESIGN EFFICIENCY. |
| | B) NO COMPLIANCE DATA IS LISTED FOR THE BOILERS AND |
| | PIPING. |
| | C) NO COMPLIANCE DATA FOR HP-H. |
| | D) NO COMPLIANCE DATA FOR THE HORIZONTAL HP'S, AND THE |
| | VERTICAL 8, 18, & 25 TON HP'S- SEE SHEET M602. |
| | E) COOLING TOWER EFFICIENCY IS NOT CONSISTENT WITH THE |
| | PROCEDURE DESCRIBED IN TABLE C403.2.3(8). |
| | |
| | 6) SHEET M001 THERE ARE NO VENTILATION RATES OR OUTDOOR |
| | CFM VALUES LISTED IN THE ASHRAE VENTILATION TABLE- |
| | PLEASE SEE TABLE 403.3.1.1 FBC M. |
| | |
| | 7) THE OAU THAT IS LOCATED ON THE 3RD FLOOR IS |
| | MISLABELED AS AN ENERGY RECOVERY RTU IN THE SCHEDULE, |
| | HOWEVER IS NOT AN RTU AND DOES NOT APPEAR TO BE |
| | EQUIPPED WITH ENERGY RECOVERY. |
| | |
| | 8) M602: IN THE HP SCHEDULES PLEASE PROVIDE A SYSTEM ID |
| | IN THE TAG COLUMN LINES. |
| | |
| | 9) M602: A MANUFACTURER'S SUBMITTAL AND WIND LOAD |
| | ENGINEERING FOR THE COOLING TOWERS IS REQUIRED IN |
| | ACCORDANCE WITH SECTIONS 908.1 AND 301.15 FBC M. PLEASE |
| | NOTE THE SPECS FOR THE TOWERS SHALL INDICATE THE UNITS |
| | ARE LISTED IN ACCORDANCE WITH UL 1995. THE ENGINEERING |
| | FOR THE SUPPORT STRUCTURE AND INSTALLATION OF THE |
| | TOWERS MAY BE DEFERRED IF REQUESTED- SEE COMMENT #3 |
| | ABOVE. |
| | |
| | 10) M100, M101A & M101B: REFER TO SECTION 301.16 FBC M |
| | COPIED BELOW AND PROVIDE COMPLIANCE INFORMATION: |
| | 301.16. FLOOD HAZARD. |
| | FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS, |
| | MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE |
| | LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION |
| | 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR |
| | UTILITIES AND ATTENDANT EQUIPMENT. |
| | EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES |
| | ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION |
| | REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING |
| | CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT |
| | PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO |
| | PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE |
| | COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC |
| | LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY, |
| | DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION. |
| | 301.16.1COASTAL HIGH-HAZARD AREAS AND COASTAL A ZONES. |
| | IN COASTAL HIGH-HAZARD AREAS AND COASTAL A ZONES |
| | MECHANICAL SYSTEMS AND EQUIPMENT SHALL NOT BE MOUNTED. |
| | |
| | 11) M100: REPLACE KEYNOTES 7 & 8 WITH 1 & 2 TO MATCH |
| | THE PLANS. |
| | |
| | 12) M100: PROVIDE OUTDOOR AIR (O/A) IN THE ELEVATOR |
| | LOBBY AND OTHER OCCUPIED STORAGE ROOMS- SEE SECTION |
| | 404.3 AND TABLE 403.3.1.1 FBC M. |
| | |
| | 13) M100, M101A, M101B, M503, M601- PARKING GARAGES: |
| | A) LOCATIONS OF THE BASEMENT EXHAUST FANS NOT SHOWN. |
| | B) CALCULATIONS INDICATE INADEQUATE VENTILATION WITH |
| | ALL 1ST AND 2ND FLOOR FANS OPERATING AT FULL CAPACITY- |
| | SEE CALCULATIONS ON M100, M101A & M101B AND SCHEDULE ON |
| | M601. |
| | C) THE LOCATIONS OF THE GROUND FLOOR EXHAUST FANS DO |
| | NOT MEET COMPLIANCE WITH SECTION 502.1.1 FOR HAVING |
| | EXHAUST INLETS AT AREAS OF HEAVIEST CONCENTRATIONS OF |
| | CONTAMINANTS. |
| | D) PROVIDE SUBMITTALS FOR THE CO AND NO2 SENSORS AND |
| | CONTROLLER- SEE COMMENT #4 ABOVE. |
| | E) PROVIDE CALCULATIONS FOR THE AIR INTAKE LOUVERS AT |
| | THE SHAFT AND SUBMITTALS FOR THE LOUVERS AND THE FIRE |
| | DAMPERS. |
| | F) PROVIDE A SEQUENCE OF OPERATION FOR THE FIRE DAMPERS |
| | AT THE SHAFT. |
| | G) CLARIFY OR SHOW HOW THE AIR SHAFT IS CONNECTING WITH |
| | THE EXTERIOR OF THE BUILDING. |
| | E) INDICATE THE HEIGHT FROM THE FINISHED GARAGE FLOORR |
| | TO THE BOTTOM SIDES OF THE CIRCULATION FANS- SECTION |
| | 304.6. |
| | |
| | 14) M101A- GENERATOR: |
| | A) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | GENERATOR, EXHAUST PIPE, MUFFLER, THIMBLE, SILENCER- |
| | SEE COMMENT #4 ABOVE. |
| | B) SUBMIT THE UL 2200 CERTIFICATE OF COMPLIANCE. |
| | C) PROVIDE EXHAUST VENTILATION CALCULATIONS AND A |
| | SEQUENCE OF OPERATION FOR EF-1L-1. |
| | D) PLEASE REVIEW SECTION 7.7.1 NFPA 110. AN AC SYSTEM |
| | MAY BE REQUIRED FOR THE GENERATOR ROOM IN ORDER TO |
| | LIMIT THE MAXIMUM AIR TEMPERATURE IN THE ROOM TO THE |
| | MAXIMUM AMBIENT AIR TEMPERATURE AS REQUIRED BY THE |
| | GENERATOR MANUFACTURER. |
| | |
| | 15) M101A: INDICATE HOW THE POOL EQUIPMENT ROOM WILL BE |
| | VENTILATED. PLEASE NOTE THAT IF A FUEL FIRED POOL |
| | HEATER IS TO BE INSTALLED IN THE ROOM, COMBUSTION AIR |
| | PER SECTION 304 FBC FG IS REQUIRED, AND A VESTIBULE |
| | WITH A TWO-WAY DOOR SEPARATION SHALL BE PROVIDED- SEE |
| | SECTION 305.3.2 FBC FG AND EXCEPTION. |
| | |
| | 16) M101A: KEYNOTES #7 & 8 SHOWN AT THE BOTTOM OF THE |
| | PLAN SHEET DO NOT APPEAR ON THE ACTUAL PLAN. |
| | |
| | 17) M101A: NOTE #1 BY HP-1L-1 HAS NO CORRESPONDING TEXT |
| | ON THE PLAN SHEET, ALTHOUGH IT APPEARS TO BE |
| | IDENTIFYING A REQUIRED O/A INTAKE DAMPER. |
| | |
| | 18) M101A: PROVIDE VENTILATION FOR THE DOCKMASTER, |
| | TRASH HOLDING, AND FIRE COMMAND ROOMS. |
| | |
| | 19) M101A & M101B: FIRE DAMPERS MISSING AT TRASH ROOM |
| | EXHAUST DUCT PENETRATIONS OF THE FIRE-RATED ELEVATOR |
| | LOBBY AND PUMP ROOM WALLS- SECTION 607.5.2 FBC M. A) |
| | PROVIDE EXHAUST VENTILATION CALCULATIONS AND A SEQUENCE |
| | OF OPERATION FOR THE EF-1L-5. B) IT APPEARS THAT THE |
| | TRASH EXHAUST DOES NOT TERMINATE TO THE OUTDOORS. |
| | |
| | 20) M101A & M101B: PROVIDE WIND LOAD ENGINEERING FOR |
| | INSTALLATION OF THE EXTERIOR CU'S- SEE COMMENT #4 AND |
| | SECTION 301.15 FBC M. |
| | |
| | 21) M101A & M101B: PROVIDE AN ELEVATION VIEW, AND |
| | INSTALLATION DETAILS FOR THE GARAGE EXHAUST FANS ON THE |
| | EXTERIOR WALL. |
| | |
| | 22) M101B: FIRE DAMPER MISSING AT O/A DUCT PENETRATION |
| | OF WATER PUMP FIRE RATED WALL- SECTION 607.5.2 FBC M. |
| | |
| | 23) M101B: PROVIDE AN ENLARGED DRAWING OF THE WATER |
| | PUMP ROOM SHOWING ALL REQUIRED WORKING CLEARANCES |
| | AROUND THE EQUIPMENT, AND SUBMIT MANUFACTURER?S |
| | SPECIFICATIONS FOR THE BOILERS, HEAT EXHANGERS AND THE |
| | PUMPS. IT APPEARS NOTE #4 AT THE BOILER SHOULD BE |
| | CHANGED TO NOTE #6. |
| | |
| | 24) M101B: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR |
| | THE WATER PUMP ROOM AND A SEQUENCE OF OPERATION FOR |
| | EF-1L-4. |
| | |
| | 25) M100, M101A & M101B: REFER TO SECTIONS 401.4 AND |
| | 501.3.1 AND PROVIDE CLEARANCE DISTANCE MEASUREMENTS FOR |
| | THE O/A INLETS AND EXHAUST OUTLETS. SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS |
| | FOR THE LOUVERS. |
| | |
| | 26) M102A: PLEASE IDENTIFY ALL ROOMS AND SPACES SHOWN |
| | ON THE PLAN. |
| | |
| | 27) M102A: PROVIDE VENTILATION FOR THE STORAGE, TRASH |
| | AND PACKING RMS- TABLE 403.3.1.1 FBC M. |
| | |
| | 28) M102A: PROVIDE RETURN DUCT SIZES AT HP-2L-1. |
| | |
| | 29) M102A: PROVIDE EXHAUST VENTILATION CALCULATIONS AND |
| | A SEQUENCE OF OPERATION FOR THE EF'S IN THE ROOMS |
| | ADJACENT TO THE MECHANICAL ROOM. |
| | |
| | 30) M102B: IDENTIFY ALL ROOMS AND SPACES ON THE PLANS |
| | AND PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE |
| | EF'S AND A SEQUENCE OF OPERATION FOR THE FANS. |
| | |
| | 31) M103: FD MISSING AT 70X26" DUCT PENETRATING |
| | FIRE-RATED MECH ROOM (OAU-1) SECTION 607.5.2 FBC M. |
| | |
| | 32) M103: FD?S MISSING AT 30X20" AND 24X20" RETURN |
| | DUCTS PENETRATING FIRE-RATED MECH ROOM WALL (HP-3L-2 |
| | AND 3L-3)- SECTION 607.5.2. |
| | |
| | 33) M103: PROVIDE ENLARGED MECHANICAL PLANS FOR THE |
| | PRIVATE DINING/PERFORMANCE KITCHEN AREA- SECTION |
| | 107.2.1 WPB, AND SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | FOR ALL COOKING APPLIANCES. PLEASE NOTE THAT SEPARATE |
| | PERMITS ARE REQUIRED FOR KITCHEN EXHAUST HOODS, HOWEVER |
| | AN AIR BALANCE CALCULATION IS REQUIRED ON THE MAIN MECH |
| | PLANS- PLEASE PROVIDE. |
| | |
| | 33) M103: THE PLAN INDICATES THAT AIR FROM THE KITCHEN |
| | WILL BE RECIRCULATED TO OTHER ROOMS AND SPACES OUTSIDE |
| | OF THE KITCHEN WHICH IS PROHIBITED PER TABLE 403.3.1.1 |
| | FBC M FOOTNOTE B |
| | |
| | 34) M103: EXHAUST VENTILATION AT A RATE OF 0.7 CFMS PER |
| | SF. IS REQUIRED FOR THE KITCHEN- TABLE 403.3.1.1 FBC M. |
| | |
| | 35) M103: SHOW HOW O/A IS BEING PROVIDED TO GUEST |
| | SUITES 1 & 2- TABLE 403.3.1.1. |
| | |
| | 36) M104, 106, 107, 108: VENTILATION REQUIRED FOR THE |
| | TRASH ROOMS AND CORRIDORS BY STAIRWELL. |
| | |
| | 37) M104, 106, 107, 108, 109, 110: THE FSD'S AT THE |
| | SHAFTS MUST BE MOTORIZED IN ORDER TO OPERATE IN |
| | SEQUENCE WITH THE SMOKE CONTROL SYSTEM- PLEASE PLACE A |
| | SYMBOL AT EACH LOCATION. |
| | |
| | 38) M104: IT APPEARS THAT SOME O/A DUCTS SUPPLYING THE |
| | APARTMENT HAVE FD'S AT THE CORRIDOR WALL PENETRATIONS |
| | AND OTHERS DO NOT- PLEASE CLARIFY. |
| | |
| | 39) M-107: PLEASE PROVIDE AN ENLARGED PLAN FOR THE |
| | BOILER ROOM SHOWING THE LOCATIONS OF ALL EQUIPMENT AND |
| | WORKING CLEARANCES. INCLUDE AN EQUIPMENT SCHEDULE AND |
| | SUBMIT SPECS FOR ALL EQUIPMENT. A) PROVIDE VENTILATION |
| | FOR THE ROOM. |
| | |
| | 40) M109: SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE FLAMEBAR DUCTWORK, |
| | INCLUDING A DETAIL FOR INSTALLATION OF THE FIRE DAMPER |
| | IN THE DUCT- SEE COMMENT #4 ABOVE. |
| | |
| | 41) M109: THE PLAN SHOWS 5-TON AC SYSTEMS WHICH REQUIRE |
| | DUCT SMOKE DETECTORS TO BE INSTALLED AT EACH MAIN |
| | SUPPLY TRUNK. IN ADDITION THE PLAN APPEARS TO INDICATE |
| | A SHARED PLENUM WHICH WILL REQUIRE DUCT SMOKE DETECTORS |
| | AT ALL AIR HANDLER LOCATIONS- SECTIONS 606.2.1 & |
| | 606.2.2 FBC M. |
| | |
| | 42) M110: PROVIDE WIND LOAD ENGINEERING DRAWINGS FOR |
| | THE ROOFTOP FANS AND CURBS, CONDENSERS AND STANDS, AND |
| | ALL REQUIRED DUCT SUPPORTS AND BRACKETS. PLEASE INCLUDE |
| | FL. PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE |
| | STANDS. SHOW HOW THE FANS AND DUCTS WILL CONNECT TO THE |
| | SHAFTS. |
| | |
| | 43) M110: PROVIDE A SEQUENCE OF OPERATION FOR THE SMOKE |
| | DETECTORS IN THE PRESSURIZATION FANS. CLARIFY HOW WILL |
| | THESE DETECTORS WILL INTERACT WITH THE SMOKE CONTROL |
| | SEQUENCING PROCEDURES. |
| | |
| | 44) M220, 221, 222, 223, 224, 225, 226, 227, 228, 229: |
| | A) SUBMIT SPECS FOR THE CLOTHES DRYERS, RECIRCULATION |
| | EXHAUST HOODS, COOKING APPLIANCES AND THE X-VENTS. |
| | B) CLARIFY HOW MAKEUP AIR IS BEING PROVIDED FOR THE |
| | DRYERS- SECTION 504.6 FBC M. |
| | C) VERIFY THAT THE DRYER EXHAUST DUCT IS NOT IN A |
| | RETURN AIR PLENUM- SECTION 504.4 |
| | D) PROVIDE THE TOTAL LENGTH OF THE DRYER EXHAUST DUCT |
| | RUNS- SECTION 504.8.4. |
| | E) VERIFY NO COMBUSTIBLES IN AC CLOSETS INCLUDING THE |
| | CLOSET DOORS. |
| | F) PROVIDE SMOKE DETECTORS IN RETURN AIR PLENUM-RATED |
| | AC CLOSETS |
| | |
| | 45) SHEETS M221, 222, 223, 224, 225, 226, 227, 229, |
| | 230: |
| | LISTED BELOW ARE DEFICIENCIES IN THE RETURN AIR SYSTEMS |
| | OF THE APARTMENTS AND SOME OTHE MISSING INFORMATION |
| | REFER TO SECTION 601.6 FBC M ITEMS 1-3 AND CORRECT. |
| | |
| | A) M221: PROVIDE RETURN AIR FROM THE MASTER BEDROOM. |
| | |
| | B) M222: PROVIDE RETURN AIR FROM THE BEDROOM 2. |
| | |
| | C) M223: IDENTIFY ALL ROOMS ON THE PLAN- SECTION |
| | 107.2.1 |
| | |
| | D) M224: 1) IDENTIFY ALL ROOMS ON THE PLAN. 2) THE |
| | RETURN TRANSFERS FROM THE BEDROOMS ARE UNDERSIZED. |
| | |
| | E) M225: MASTER BEDROOM AND BEDROOM #2 TRANSFER DUCTS |
| | ARE UNDERSIZED. |
| | |
| | F) M226: 1) THE PLAN IS CUT-OFF AT THE NORTHEAST. 2) |
| | PROVIDE RETURN AIR FROM BEDROOMS 2 & 3. |
| | |
| | G) M227: A) IDENTIFY ALL ROOMS. B) THE 20X6 TRANSFER |
| | GRILL IS UNDERSIZED. |
| | |
| | H) M229: 1) PROVIDE COMPLETE ROOM IDENTIFICATIONS. 2) |
| | PROVIDE RETURN AIR FROM THE YOGA ROOM. 3) PROVIDE A |
| | DUCT SMOKE DETECTOR IN THE SUPPLY SYSTEM OF HP-H. 4) |
| | LABEL ALL THE HP'S IN THE SPACE. 5) BEDROOM #2 & 3 |
| | TRANSFER DUCTS ARE UNDERSIZED. 6) DUCT SMOKE DETECTORS |
| | ARE REQUIRED IN THE SUPPLY SYSTEMS OF EACH 5-TON HP- |
| | SECTION 606.2.1, AND ALSO IN THE AC CLOSETS IF SHARING |
| | THE PLENUM. |
| | |
| | 53) M230: THE 18X10" AND 16X10" RETURN DUCTS ARE |
| | UNDERSIZED. |
| | |
| | 54) M502: THE DUCTWORK CONNECTING THE PRESSURIZATION |
| | FANS TO THE SHALFTS SHALL BE FIRE-RATED PER SECTION- |
| | 909.21.3 FBC B. |
| | |
| | 55) M502: THE HOISTWAY SHAFT VENTS SHALL BE PROVIDED |
| | WITH CLASS I MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE |
| | RATE OF 4 CFM/FT2 AT 1.0 INCH WATER GAUGE (W.G.) (249 |
| | PA) WHEN TESTED IN ACCORDANCE WITH AMCA 500D- SECTION |
| | C403.2.4.3 FBC M. |
| | |
| | 56) M-701: SOME OF THE REQUESTED WIND LOAD ENGINEERING |
| | HAS BEEN PROVIDED HOWEVER THE DETAILS ARE INCOMPLETE |
| | AND NO WIND DESIGN CRITERIA HAS BEEN PROVIDED. |
| | |
| | 57) POST FIRE SMOKE REMOVAL SYSTEM: PROVIDE |
| | CALCULATIONS TO VERIFY FAN SIZING IN ACCORDANCE WITH |
| | THE SMOKE CONTROL SYSTEM REQUIREMENTS LISTED ON PAGE 29 |
| | OF THE REPORT. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |