Plan Review Notes
Plan Review Notes For Permit 18081417
Permit Number 18081417
Review Stop P
Sequence Number 1
Notes
Date Text
2018-09-17 11:06:561) THE SIMPLIFIED TOTAL DYNAMIC HEAD CALCULATION METHOD
 IS NO LONGER PERMITTED BY APSP 7- 2013. THEREFORE, THE
 SUBMITTTED TOTAL DYNAMIC HEAD CALCULATION SHEET IS
 UNACCEPTABLE. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS
 FOR THE MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE
 PUMP FROM ITS PUMP CURVE IS NO LONGER ALLOWED TO BE
 USED IN DETERMINING MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013
 EDITION ADDRESSES FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES
 NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE SUCTION
 OUTLET FITTING ASSEMBLY (DRAIN COVER).THE TDH
 CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM COMPONENTS
 INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES,
 HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS
 EXCEPT THE PUMP.
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS
 3) INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR
 THE PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO
 FBC SEC. 107.2.1.
 4) INDICATE ON THE POOL EQUIPMENT DOCUMENTS WHICH MODEL
 FILTER IS BEING INSTALLED. 2017 FBC SEC. 107.2.1.
 5) INDICATE ON THE POOL EQUIPMENT DOCUMENTS WHICH MODEL
 PUMP IS BEING INSTALLED. 2017 FBC SEC. 107.2.1.
 6) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR THE POOL MAIN DRAINS. 2017 FBC SEC.
 107.2.1.
 7) THE PRINTING ON THE SUBMITTTED SIGNED AND SEALED
 PLANS BY CHARLES ADAMS IS BARELY LEGIBLE. SUBMIT TWO
 LEGIBLE COPIES OF THE DOCUMENTS SIGNED AND SEALED BY
 CHARLES ADAMS FOR REVIEW. 2017 FBC SEC. 107.2.1, FL.
 ADMIN. CODE RULE 61G15-23.001.
 8) THE PIPE SIZES ARE MISSING FROM THE PIPING SCHEMATIC
 ON THE DDRAWINGS FROM MR. ADAMS, ENGINEER. 2017 FBC
 SEC. 107.2.1.
 9) SHT. 2 - NOTES - THE STANDARDS LISTED IN NOTE 13 OF
 PLANS FROM CHARLES ADAMS ARE OUTDATED. REVISE THE NOTE.
 THE FOLLOWING STANDARDS ARE IN EFFECT:
 ANSI/NSPI 3 - 2015
 ANSI/NSPI 5 - 2011
 ANSI/NSPI 7 - 2013
 10) INDICATE ON SHT. 2 OF THE PLANS FROM CHARLES
 EDWARDS WHICH MODEL OF THE POOL IS BEING INSTALLED.
 2017 FBC SEC. 107.2.1.
 11) SHT. 2, NOTE #19 OF PLANS BY CHARLES ADAMS STATES
 THAT THE PIPE SIZING AND HYDRAULIC VELOCITY WERE DONE
 BY THE CONTRACTOR. CLARIFY. THE ENGINEER OF RECORD IS
 RESPONSIBLE FOR THE DESIGN OF THE POOL. FL. ADMIN. CODE
 RULE 61G15-30.003.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  