| Date |
Text |
| 2018-09-26 07:37:33 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) PROVIDE SIGNED AND SEALED ENGINEERING TO SPECIFY THE |
| | REQUIRED LOCATIONS OF THE 30" X 30" CONCRETE DEADMAN |
| | ANCHORS. 107.2.1.2 |
| | |
| | 2) THERE IS A DIFFERENCE BETWEEN THE SIGNED AND SEALED |
| | ENGINEERING AND THE OTHER DRAWINGS. THE POOL SHAPE AND |
| | CROSS SECTIONS OF THE POOLS DO NOT MATCH. FBC107.2.1 |
| | |
| | 3) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND |
| | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| | THE PERSON RESPONSIBLE FOR THE DESIGN. |
| | |
| | 4) THE ADDRESS OF THE PROJECT IS REQUIRED ON THE |
| | DRAWINGS. FBC 107.2.1 |
| | |
| | 5) THE BLOCK DECO WALL DRAWINGS ARE MISSING |
| | INFORMATION. PROVIDE AN ELEVATION DRAWING OF THE WALL. |
| | SPECIFY THE SPACING OF THE VERTICAL REBAR AND THE |
| | SPACING OF THE CROSS BARS IN THE FOOTING. VERTICAL |
| | REINFORCING IS REQUIRED AT EACH END OF THE WALL. A BOND |
| | BEAM WITH HORIZONTAL REINFORCING IS REQUIRED AT THE TOP |
| | OF THE WALL. CLARIFY THE WIDTH AND THICKNESS OF THE |
| | FOOTER. A 12" WIDE FOOTER IS NOT ADEQUATE FOR THE 8" |
| | CONCRETE BLOCK WALL WITHOUT ENGINEERING. THE NAME AND |
| | SIGNATURE OF THE PERSON RESPONSIBLE FOR THE DESIGN IS |
| | REQUIRED ON ALL DRAWINGS. FBC 107.2.1 |
| | |
| | |