| 2018-11-29 17:11:58 | REVISION THIRD BUILDING REVIEW CHECKLIST. |
| | CODE: FBC 5TH EDITION (2014) AND CITY AMENDMENTS. |
| | |
| | ORIGINAL COMMENT: |
| | 1-ENGINEERED PLANS SHOW THE METAL SCREENING ATTACHED TO |
| | THE A/C UNIT. TYPICALLY, A/C UNITS ARE NOT DESIGNED TO |
| | RESIST ADDITIONAL WIND LOADS. PROVIDE A/C MANUFACTURES |
| | SPECS SHOWING THAT THE UNIT IS DESIGNED FOR THIS |
| | ADDITIONAL LOAD OR PROVIDE COMPLETE ENGINEERING |
| | ANALYSIS SHOWING THAT THE EXISTING A/C UNIT WILL RESIST |
| | THE ADDITIONAL LOAD. SEC. 1609 FBC AND SEC. 107.2.1.2 |
| | CITY AMENDMENTS. |
| | |
| | RESPONSE: |
| | SPINNAKER INDUSTRIES SLIDING LOUVERED PANEL |
| | ARCHITECTURAL SCREENING SPECIFICATION SUBMITTED |
| | SPECIFIES "THE SCREENING WILL BE SHIPPED "KOCKED-DOWN" |
| | AS AN ASSEMBLY KIT WHICH WILL MOUNT DIRECTLY TO THE |
| | MECHANICAL EQUIPMENT (NO ROOF-TOP PENETRATION WILL BE |
| | REQUIRED, OR ALLOWED)". NEED TO PROVIDE ENGINEERING |
| | ANALYSIS OR A/C MANUFACTUER SPECIFICATIONS SHOWNG THAT |
| | THE A/C WILL RESIST THE ADDTIONAL LOADS. OR ENGINEER OF |
| | RECORD PROVIDE COMPLETE DETAISLA ND SPECIFICATIONS FOR |
| | SCREENING TO BE ATTACHED TO THE A/C CURB NOT THE A/C |
| | UNIT. SEC. 1609 FBC AND SEC. 107.2.1.2 CITY AMENDMENTS. |
| | |
| | ORIGINAL COMMENT: |
| | 2- PROVIDE PLAN SHOWING THE LOCATION OF THE PROPOSED |
| | SCREENS. SEC. 1107.2.1 CITY AMENDMENTS. |
| | |
| | RESPONSE: |
| | SCOPE OF WORK SHOWN ON DRAWINGS FROM JACOBS SUBMITTED |
| | VIA E-MAI ON 11/27/18 IS NOT CLEAR. EQUIPMENT SHOWN ON |
| | FLOOR PLAN ON SHEET SK-1 AND SK-2 DOESN'T MATCH. NOT |
| | CLEAR IF INSTALLING SCREEN POSTS OR NOT. AND LOCATIOIN |
| | OF POST DON'T MATCH . CLARIFY IS USIING SPINNAKER |
| | INSUATRIES OR CITYSCAPES. COORDIANTE AS REQUIRED. SEC. |
| | 107.2.1 CITY AMENDMENTS. |
| | |
| | 3- RE-SUBMIT COMPLETE COORDINATED PACKAGE FOR REVIEW. |
| | NOTE: MECHANICAL PLAN REVIEWER WILL NEED TO REVIEW |
| | PLANS FOR COMPLIANCE WITH ACCESS FOR SERVICE AND |
| | REPLACEMENT. PROVIDE THIS INFORAMTION FOR MECHANICAL |
| | REVIEW TO AVODI/CONFLICTS DELAYS. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE/VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | PLEASE DON'T STAPLE OLD DRAWINGS/DOCUMENTS . SUBMIT OLD |
| | DRAWINGS/DOCUMENTS FOR REFERENCE. |
| | |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected]. |