| Date |
Text |
| 2018-10-25 11:46:26 | 1) TWO DIFFERENT GAS PIPING RISERS HAVE BEEN SUBMITTTED |
| | FOR THIS WORK. ONE IS FROM ROSADO PROPANE SERVICES AND |
| | THE OTHER HAS BEEN DONE BY THE ENGINEER OF RECORD. |
| | SUBMIT TWO COPIES OF THE CORRECT GAS DRAWING TO BE |
| | SUBMITTED. FBC 107.2. |
| | 2) INDICATE ON THE PLAN THE OPERATING PRESSURE OF THE |
| | SYSTEM DOWNSTREAM OF THE REGULATOR FOR THE GENERATOR. |
| | ROSADO PROPANE HAS SUBMITTED A SIZING TABLE FOR 5 PSI |
| | AND SHT. M-1 SHOWS A PRESSURE OF LESS THAN 2 |
| | PSI.CLARIFY. |
| | 3) SHOW THE PSI OF THE SYSTEM DOWNSTREAM OF THE |
| | EXISTING GAS METER AND SHOW THE LOCATION OF ANY |
| | EXISTING GAS REGULATORS ON THE ROSADO PROPANE DRAWING |
| | IF THAT IS THE DRAWING TO BE USED. FBC 107.2.1. |
| | 4) THE GENERATOR SPECIFICATIONS AND THE DRAWING FROM |
| | ROSADO PROPANE CALL OUT A 2 INCH GAS SUPPLY LINE TO THE |
| | GENERATOR AND THE GAS RISER DRAWING ON SHT. M-1 SHOWS A |
| | 1 1/2 INCH GAS SUPPLY LINE. CLARIFY. |
| | 5) SHOW THE DISTANCE OF THE 2ND STAGE REGULATOR TO THE |
| | GENERATOR ON THE GAS DRAWING TO BE USED. FBC 107.2.1. |
| | 6) THE GAS INFO PAGE FROM ROSADO PROPANE NOTES PIPE |
| | SIZING FOR NEW GAS LINE IS BASED ON TABLE 402.4 (7) FOR |
| | A 5 PSI SYSTEM BUT ALSO REFERENCES THE SAME SIZING |
| | TABLE FOR A LESS THAN 2 PSI SYSTEM. CLARIFY.THIS |
| | INFORMATION CONFLICTS WITH THE INFORMATION PROVIDED BY |
| | THE ENGINEER ON SHT. M-1. CLARIFY. |
| | 7) THE GAS DRAWING FROM ROSADO PROPANE SHOWS A 10 PSI |
| | GAS METER YET DRAWING M-1 SHOWS A LESS THAN 2 PSI |
| | PRESSURE. CLARIFY. |
| | 8) THE GAS PIPING FROM ROSADO PROPANE SHOWS GALVANIZED |
| | PIPING TO BE RRUN UNDERGROUND.GALVANIZED PIPING SHALL |
| | NOT BE USED UNDERGROUND PER FBC-FUEL GAS SEC.404.11, |
| | 404.11.1. |
| | 9) SUBMIT COMBUSTION CALCULATIONS FOR CCOMBUSTION AIR. |
| | FBC-FUEL GAS SEC.304.1,304.6.2. |
| | 10) SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION DETAILS FOR THE NEW EXHAUST PIPE FROM THE |
| | GENERATOR ( TYPE OF PIPE, TYPE OF SUPPOTS, SUPPORT |
| | SPACING, ETC.). |
| | 11) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | MINIMUM REQUIRED CLEARANCES AROUND THE GENERATOR. FBC |
| | 107.2.1. |
| | 12) SUBMIT MANUFACTURER?S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS. |
| | IDENTIFY ON THE SPECIFICATION SHEETS WHICH MODEL |
| | REGULATOR IS BEING INSTALLED AND THE ORIFICE SIZE TO |
| | ENSURE THE REGULATOR CAN ACCOMMODATE THE BTU LOAD |
| | THROUGH THE REGULATOR.2017 FGC SEC.410.1, 2017 FBC-RES. |
| | SEC. G2421.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |