| Date |
Text |
| 2018-09-04 17:22:45 | 09/04/2018 1ST PLUMBING/POOL REVIEW **DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER |
| | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 |
| | EDITION ADDRESSES FLOW RATE IN GALLONS PER MINUTE |
| | (GPM). IT REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES |
| | NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE SUCTION |
| | OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| | CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM COMPONENTS |
| | IN THE PIPING SYSTEM INCLUDING THE FILTER. |
| | 2. IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS |
| | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS |
| | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE |
| | TDH CALCULATIONS. WPB AMENDMENTS TO THE FBC SEC. |
| | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 3. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN |
| | DRAIN AND THE PUMP. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | 4. SUBMIT CLEAR AND LEGIBLE SPECIFICATIONS FOR THE |
| | CARTRIDGE FILTER. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 6. BACKFLOW PREVENTER REQUIRED PER THE CITY OF WEST |
| | PALM BEACH ORD #2853-95. A PERMIT REQUIRED BY A |
| | LICENSED CONTRACTOR AND MUST BE CERTIFIED BY UTILITIES |
| | PRIOR TO FINAL INSPECTION. PLEASE CONTACT CITY OF WPB |
| | UTILITIES AT 561-822-2240 FOR FURTHER DIRECTIONS. |
| | 7. THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON |
| | THE APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED |
| | CONTRACT. WPB AMENDMENTS TO THE FBC SEC. 109.3 BUILDING |
| | PERMIT VALUATIONS. . IF IN THE OPINION OF THE BUILDING |
| | OFFICIAL, THE CLAIMED VALUATION OF BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR |
| | PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE |
| | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |