| Date |
Text |
| 2018-08-23 12:47:17 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | |
| | 1) SHEET G 001 - THERE ARE INCORRECT REFERNCES, 2010 |
| | AND 2012, TO THE CURRENT EDITION OF THE FIRE CODE |
| | |
| | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| | 6TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| | THE 2015 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| | APPLICABLE CODES OR STANDARDS. |
| | |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2013 EDITION. |
| | STANDPIPE WORK SHALL COMPLY WITH NFPA 14, STANDARD FOR |
| | THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS, 2013 |
| | EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2013 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2013 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2013 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2014 EDITION. |
| | CLEAN AGENT SYSTEMS SHALL COMPLY WITH NFPA 2001, 2012 |
| | EDITION. |
| | EMERGENCY AND STANDBY POWER SYSTEMS SHALL COMPLY WITH |
| | NFPA 110, 2013 EDITION. |
| | COMMERCIAL COOKING SHALL COMPLY WITH NFPA 96, 2014 |
| | EDITION. |
| | SMOKE CONTRO SHALL COMPLY WITH NFPA 92, STANDARD FOR |
| | SMOKE CONTROL SYSTEMS, 2012 EDITION. |
| | COMPRESSED GAS SHLL COMPLY WITH NFPA 55, COMPRESSED |
| | GASES AND CRYOGENIC FLUIDS CODE, 2013 EDITION. |
| | PARKING GARAGES SHALL COMLY WITH NFPA 88A, STANDARD FOR |
| | PARKING STRUCTURES, 2015 EDITION. |
| | HEALTHCARE FACILITIES SHALL COMPLY WITH NFPA 99, HEALTH |
| | CARE FACILITIES CODE, 2015 EDITION. |
| | |
| | |
| | PLEASE REVIEW AND CORRECT OR JUSTIFY WITH A DETAILED |
| | NARRATIVE. |
| | |
| | |
| | |
| | |
| | 2) ALL SHEET - THERE IS NO INDICATIONS OF ANY FIRE LINE |
| | WORK OR FIRE PUMP ROOM. |
| | |
| | THERE MAY BE REQUIRED FIRE LINE WORK WITHIN THE SCOPE |
| | OF THE FOUNDATION. |
| | |
| | PLEASE REVIEW AND CORRECT OR JUSTIFY OMISSION OF SUCH |
| | WORK WITH A DETAILED NARRATIVE. |
| | |
| | |
| | |
| | 3) SHEET P 200 - THERE IS NO INDICATION OF A DRAIN |
| | WITHIN A FIRE PUMP ROOM. |
| | |
| | PER NFPA 20, NFPA 20, STANDARD FOR THE INSTALLATION OF |
| | STATIONARY PUMPS |
| | FOR FIRE PROTECTION, 2013 EDITION. |
| | |
| | 4.12.7* DRAINAGE. |
| | 4.12.7.1 FLOORS SHALL BE PITCHED FOR ADEQUATE DRAINAGE |
| | OF ESCAPING |
| | WATER AWAY FROM CRITICAL EQUIPMENT SUCH AS THE PUMP, |
| | DRIVER, CONTROLLER, AND SO FORTH. |
| | 4.12.7.2 THE PUMP ROOM OR PUMP HOUSE SHALL BE PROVIDED |
| | WITH A FLOOR DRAIN THAT WILL DISCHARGE TO A FROST-FREE |
| | LOCATION. |
| | |
| | |
| | DOES THIS PROJECT PROPOSE A FIRE PUMP TO SUPPORT THE |
| | REQUIRED FIRE SPRINKLER SYSTEM? |
| | |
| | PLEASE PROVIDE INDICATIONS OF A FLOOR DRAIN IN THE FIRE |
| | PUMP ROOM OR JUSTIFY WITH SPECIFIC DETAIL AND CODE |
| | REFERENCES. |
| | |
| | |
| | |
| | |
| | 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |