2018-09-12 07:04:59REVIEW COMPLETED BY JERALD SMITH 0017-P
2018-09-11 16:40:071ST REVIEW: FBC 2017 6TH EDITION
 PERMIT 180513
 PLUMBING COMMENTS:
  
 1. RE: PLAN SHEET P-1; DETAIL 1 AND DETAIL 2; WATER AND
 SANITARY PLANS. FIXTURES AND EQUIPMENT ARE NOT LABELED.
 FBC WPB AMEND 107.2.1
 2. RE: PLAN SHEET P-1; FIXTURE SCHEDULE. NUMERIC TAGS
 AND CONNECTION SIZES ARE BARELY DISCERNIBLE. INCREASE
 LEGIBILITY. FBC WPB AMEND 107.2.1
 3. RE: PLAN SHEET P-1; NOTES ARE BARELY DISCERNIBLE.
 INCREASE LEGIBILITY. FBC WPB AMEND 107.2.1
 4. RE: PLAN SHEET P-1; STANDARD PDI-G101 TABLE NOTES
 ARE BARELY DISCERNIBLE. INCREASE LEGIBILITY. FBC WPB
 AMEND 107.2.1
 5. RE: PLAN SHEET P-1; GREASE PRODUCTION TABLE NOTES
 ARE BARELY DISCERNIBLE. INCREASE LEGIBILITY. FBC WPB
 AMEND 107.2.1
 6. RE: PLAN SHEET P-1; DETAIL 3 NUMERIC TAG 05- 1"
 WASTE NEEDS TO BE AN INDIRECT WASTE DISCHARGING THROUGH
 AN AIR GAP TO A TRAPPED AND VENTED WASTE RECEPTOR. IE.
 FLOOR SINK FPC 802.1
 7. RE: PLAN SHEET P-1; DETAIL 3 NUMERIC TAG 08- 3
 COMPARTMENT SINK WASTE NEEDS TO BE AN INDIRECT WASTE
 DISCHARGING THROUGH AN AIR GAP TO A TRAPPED AND VENTED
 WASTE RECEPTOR. IE. FLOOR SINK FPC 802.1 AND IF USED IN
 ACTUAL FOOD HANDLING THEN EACH COMPARTMENT SHALL
 DISCHARGE INDEPENDENTLY TO SAID WASTE RECEPTACLE
 THROUGH AN AIR GAP. FPC 802.1.1. PROVIDE DETAIL. FBC
 WPB AMEND 107.2.1
 8. RE: PLAN SHEET P-1; DETAIL 3 NUMERIC TAG 06- TRAPPED
 AND VENTED HAND SINK TO DISCHARGE DOWNSTREAM OF GREASE
 INTERCEPTOR.
 9. RE: PLAN SHEET P-1; DETAIL 3 NUMERIC TAG 19- PROVIDE
 DETAIL AND MANUFACTURER'S INFO FOR SEWAGE PUMP. INCLUDE
 VALVING AND SIZING OF DISCHARGE TO EXISTING SANITARY.
 SHALL MEET REQUIREMENTS OF FPC 712. FBC WPB AMEND
 107.2.1
 10. RE: PLAN SHEET P-1; DETAIL 3 NUMERIC TAG 19-
 CONDENSER PUMP TO DISCHARGE THROUGH AN AIR GAP TO A
 TRAPPED AND VENTED WASTE RECEPTOR. IE. FLOOR SINK FPC
 802.1. PROVIDE DETAIL AND MANUFACTURER'S INFO FOR
 CONDENSER PUMP. FBC WPB AMEND 107.2.1
 11. RE: PLAN SHEET P-2; HIGH TEMP KITCHEN WATER DETAIL
 SHOWING COLD WATER CONNECTION TO HIGH TEMP EFFLUENT. IF
 THIS IS A PHYSICAL CONDITION OF THE FACILITY THEN SHOW
 IT ON THE WATER DISTRIBUTION PLAN WITH A HIGH HAZARD
 RPZ BACKFLOW PREVENTOR AND INCLUDE IN DETAIL. FPC
 608.1. IF NOT, THEN REMOVE DETAIL FROM PLAN. FBC WPB
 AMEND 107.2.1
 12. TEMPERED WATER TO BE DELIVERED TO HAND SINK AND
 LAVATORY IN ACCORDANCE WITH FPC 416.5
 13. RE: PLAN SHEET P-1; DETAIL 3; WATER DISTRIBUTION
 ISOMETRIC. TAG 07 NOT SHOWN ON ANY SCHEDULE. APPEARS TO
 BE A TANKLESS WATER HEATER. PROVIDE SCHEDULE AND
 DETAIL. FBC WPB AMEND 107.2.1
 14. RE: PLAN SHEET P-1; DETAIL 2; SANITARY PLAN. REVISE
 PLAN TO CLEARLY SHOW UG PIPING, SEWAGE PUMP DISCHARGE
 AND ALL FLOOR SINKS.
 15. RE: PLAN SHEET P-2; DETAIL SHOWING AIR ADMITTANCE
 VALVES. IF THIS IS A PHYSICAL CONDITION OF THE FACILITY
 THEN SHOW IT ON THE SANITARY ISOMETRIC. IF NOT, THEN
 REMOVE DETAIL FROM PLAN. FBC WPB AMEND 107.2.1
 16. CONFIRM THAT WATER TEMPERATURE TO
 UTILITY/UTENSIL/POT CLEANING FIXTURES MEET BOARD OF
 HEALTH REQUIREMENTS WITHOUT PRESENTING A HAZARD TO
 EMPLOYEES USING THESE ITEMS.
 17. PROVIDE SCHEDULE OF OCCUPANCY TYPE NOTING OCCUPANT
 LOAD PER FBC 1004 AND DETERMINE COMPLIANCE WITH MINIMUM
 PLUMBING FACILITIES PER FPC 403.1 AND TABLE 403.1.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6715


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved