| Date |
Text |
| 2018-09-25 11:26:14 | REMAINDER: BUILDING REVIEW WAS ALSO APPROVED ON |
| | 01/23/18 WITH PROVISO. PROVIDE INFORMATION REQUESTED ON |
| | PROVISO TO AVOID CONFLICTS/DELAYS. SEE COPY OF BUILDING |
| | PROVISO BELOW: |
| | |
| | BUILDING REVIEW APPROVED WITH PROVISO: |
| | (1)- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN |
| | CREDIT. REVISE GREAT ROOM CEILING FAN SIZE TO COMPLY |
| | WITH SEC. R405.7.6 FBC-ENERGY CONSERVATION. |
| | (2)- SOIL TEST REPORT SUBMITTED NEEDS THE ENGINEER'S |
| | ORIGINAL SIGNATURE (NOT COPY). CHAPTER 471 F.S. |
| | (3)- PROVIDE PRODUCT APPROVAL FOR THE OVERHEAD GARAGE |
| | DOOR THAT MEETS THE DESIGN PRESSURES CALCULATED BY THE |
| | ARCHITECT ON SHEET A-301. |
| | (4)- DESIGNER OF RECORD TO APPROVE ABOVE PRODUCT |
| | APPROVAL. SEC. 107.3.4.1 CITY AMENDMENTS. NOTE: PLEASE |
| | PLACE THE REVIEW STAMP ON THE FRONT OF THE PRODUCT |
| | APPROVAL NOT ON THE BACK. |
| | (5)- PROVIDE SURVEY (2 COPIES) THAT MATCHES PROPOSED |
| | HOUSE IN LOT "B" AND THE ADDRESS 245 EDMOR RD. |
| | |
| | ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO HELP EXPEDITE THE REVIEW PROCESS. |
| | |
| | ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD |
| | DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY |
| | REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |
| | ****REVIEW IN PROGRESS..... |