| 2018-09-07 12:37:34 | REVIEW COMPLETED BY JERALD SMITH 0017-P |
| 2018-09-06 09:32:46 | 1ST REVIEW: FBC 2017 6TH EDITION |
| | PERMIT 18080193 |
| | PLUMBING COMMENTS: DENIED |
| | |
| | 1. REGARDING SANITARY PLUMBING RISER ON PLAN SHEET S-1: |
| | A. PLEASE ID BATHROOMS ON RISER DIAGRAM, MATCHING THEM |
| | TO THE BATHROOMS ON PLAN SHEET A-201 AND A-202; PROVIDE |
| | DISTINCTIVE ID, I.E. BATH #1, BATH #2. NOTE THAT "PWDR" |
| | ON PLAN SHEET A-201 APPEARS TO BE "CABANA" ON THE RISER |
| | DIAGRAM. PLEASE CLARIFY. |
| | |
| | B. SHOWER BATH ADJACENT TO "PWDR" BATH ON PLAN SHEET |
| | A-201 SHOWS TWO INDIVIDUAL SHOWER DRAINS. PLUMBING |
| | RISER ON PLAN SHEET S-1 SHOWS ONLY ONE FIXTURE DRAIN. |
| | SHOW SECOND FIXTURE DRAIN FOR THE SECOND SHOWER DRAIN |
| | AND CONNECT TO THE WET VENT. 2017 FBC RES 3108.1 |
| | |
| | C. FIXTURE DRAINS FOR SHOWERS AND WATER CLOSETS IN BOTH |
| | UPSTAIRS SHOWER BATHS MUST CONNECT INDEPENDENTLY TO THE |
| | WET VENT. CORRECT ON THE SANITARY RISER DIAGRAM ON PLAN |
| | SHEET S-1 TO SHOW THE SAME. 2017 FBC RES 3108.1 |
| | |
| | 2. THERE IS A GAS FIRED TANKLESS WATER HEATER AND A BBQ |
| | GRILL NOTED ON PLAN SHEET A-201. A GAS PLAN HAS NOT |
| | BEEN INCLUDED IN THIS SUBMITTAL PACKAGE. A GAS PLAN |
| | REVIEW HAS NOT BEEN PERFORMED AT THIS TIME. A SEPARATE |
| | GAS PERMIT AND PLANS WILL BE REQUIRED FOR A CONTRACTOR |
| | TO PERFORM THE RELATED WORK PER WPB AMEND. TO FBC SEC. |
| | 105.1. PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT |
| | SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE |
| | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE |
| | FBC-R, SEC. G2404.3. |
| | A SEPARATE PERMIT AND PLANS IS REQUIRED FOR THE GAS |
| | INSTALLATION OR MODIFICATION OF SYSTEM. |
| | |
| | 3. NOTE: SEE FOLLOWING COMMENTS |
| | A. HAND HELD SHOWER REQUIRES AN ATMOSPHERIC VACUUM |
| | BREAKER AT SHOWER ARM OUTLET FBC RES 2708.5 |
| | |
| | B. SHOWER CONTROL VALVE(S) SHALL BE PRESSURE BALANCED |
| | PB,THERMOSTATIC MIXING (TM) OR COMBINATION PB/TM VALVE |
| | TYPES WITH HIGH TEMPERATURE LIMITING STOP FBC RES |
| | 2708.4 |
| | |
| | C. ACCESSIBLE TEMPERATURE LIMITING CONTROL DEVICE |
| | REQUIRED ON HOT WATER TO BATHTUB IS REQUIRED. FBC RES |
| | 2713.3 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |