| Plan Review Notes For Permit 18080050 |
| Permit Number |
18080050 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2018-08-09 08:08:10 | 1) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE PRESSURE REGULATORS. WPB AMEND. | | | TO FBC SEC. 107.2.1. | | | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR ALL GAS | | | EQUIPMENT. ALL EQUIPMENT SHALL BE LISTED AND | | | LABELED.2017 FBC-FUEL GAS SEC.301.3. | | | 3) THIS GAS PERMIT CANNNOT BE ISSUED UNTIL THE MASTER | | | PERMIT #18050859 IS ISSUED. | | | 4) A SEPARATE PERRMIT WILL BE REQUIRED FOR THE | | | INSTALLATION OF THE LP TANKS AND PIPING WHICH IS SHOWN | | | ON THE PLANS TO BE "DONE BY OTHERS." | | | 5) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS | | | APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE | | | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM | | | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN | | | ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL | | | GAS SEC.304.9.3. | | | | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | |
|