| 2018-08-31 11:58:01 | ****PROVISOS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | A. SHEETS GG102 AND GA102 WHICH WERE REVIEWED BY EMAIL |
| | ARE TO BE SUBMITTED AS A REVISION WITHIN 3 BUSINESS |
| | DAYS AFTER PERMIT ISSUANCE (BY 9/6/18). |
| | |
| | B. THE PRIVATE PROVIDER'S STAMP IS MISSING FROM MANY |
| | PAGES AND THE VERSION CALLED OUT ON THE PLAN COMPLIANCE |
| | AFFIDAVIT IS NOT CONSISTENT WITH THE VERSION REVIEWED. |
| | SUBMIT ONE SET STAMPED BY THE PRIVATE PROVIDER WITH AN |
| | UPDATED PLAN REVIEW COMPLIANCE AFFIDAVIT. IT IS |
| | RECOMMENDED THAT YOU HAVE THEM STAMP A COPY OF THE |
| | ISSUED PERMIT SET. |
| | |
| | C. THIS PERMIT IS ISSUED AT APPLICANT'S RISK PER FBC |
| | 105.13: |
| | |
| | PHASED PERMIT APPROVAL. AFTER SUBMITTAL OF THE |
| | APPROPRIATE CONSTRUCTION DOCUMENTS, THE BUILDING |
| | OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT FOR THE |
| | CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER PART OF A |
| | BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS |
| | FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN |
| | SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION |
| | OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED |
| | AT THE HOLDER'S OWN RISK WITH THE BUILDING OPERATION |
| | AND WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE |
| | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED |
| | TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS |
| | PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE. ALL |
| | OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST |
| | BE SECURED PRIOR TO THIS PROVISION BEING APPLIED. |
| | |
| | D. ADVISORY FOR BUILDING PERMIT: |
| | SHORING/RESHORE ENGINEERING IS TO BE SUBMITTED, |
| | REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| | FAILURE TO DO SO ***WILL*** RESULT IN A STOP WORK ORDER |
| | IF CONTRACTOR PROCEEDS WITHOUT SUBMITTAL OF |
| | SHORING/RESHORE ENGINEERING (#7, PAGE 4, |
| | THRESHOLD/SPECIAL INSPECTOR OBLIGATIONS IN THE |
| | AGREEMENT SIGNED BY ALL PARTIES). |
| | |
| | E. ADVISORY FOR BUILDING PERMIT: |
| | AN ENGINEERED CONSTRUCTION GUARD RAIL DETAIL IS |
| | REQUIRED PRIOR TO INSTALLATION. THIS IS TO BE SUBMITTED |
| | WITH THE SHORING/RESHORE ENGINEERING, BUT SUBJECT TO |
| | FIELD INSPECTOR'S DISCRETION CAN BE PROVIDED IN THE |
| | FIELD. |
| | |
| | |
| | |