| Date |
Text |
| 2019-05-07 15:54:06 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | (REFER TO REVISION #18060327) |
| | |
| | 1) NOT COMPLIED. THE ENGINEER'S SIGNATURES ON THE TRUSS |
| | DRAWINGS ARE PHOTO COPIES. FAC 61G15-23.003 PROCEDURES |
| | FOR PHYSICALLY SIGNING AND SEALING PLANS, |
| | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. |
| | ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER |
| | DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN |
| | ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025, |
| | F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY |
| | SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE |
| | PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE. |
| | (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE |
| | LICENSEE'S SIGNATURE ON EACH PAGE REQUIRED TO BE |
| | SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR |
| | COPIED IMAGE OF THE LICENSEE'S SIGNATURE SHALL NOT BE |
| | USED. |
| | (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY |
| | CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY |
| | OVERLAPPING THE LICENSEE'S SIGNATURE ON EACH PAGE |
| | REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL |
| | NOT RENDER THE SIGNATURE ILLEGIBLE. |
| | |
| | 2) NOT COMPLIED. THE PLANS SPECIFY THE ROOFING MATERIAL |
| | AS LOW PROFILE CONCRETE ROOF TILE AND THE PRODUCT |
| | APPROVALS THAT WERE SUBMITTED ARE FOR A CONCRETE TILE |
| | ROOF. THE TRUSS LAYOUT SPECIFIES THE ROOFING MATERIAL |
| | AS METAL. COORDINATE AND MAKE THE NECESSARY CORRECTIONS |
| | AND REVISIONS. FBC 107.2.1 |
| | NOTE: THE COVER SHEET OF THE PLANS SPECIFY THE ROOF |
| | TRUSS TOP CORD DEAD LOAD AS 20 PSF AND THE BOTTOM CORD |
| | DEAD LOAD AS 30 PSF. THE TRUSS DOCUMENTS SPECIFY THE |
| | ROOF TOP CORD DEAD LOAD AS 15 PSF AND THE BOTTOM CORD |
| | DEAD LIVE LOAD AS 10 PSF. PLEASE CLARIFY. |
| | |
| | 3) NOT COMPLIED. THE FLOOR FRAMING PLANS SHOW STEEL I |
| | BEAMS FOR BEAMS 1 AND 2 ON THE FLOOR FRAMING PLAN WHERE |
| | THE TRUSS LAYOUT PLANS HAVE 3 PLY VERSALAMS. THE |
| | ENGINEER IS REQUIRED TO PROVIDE SIGNED AND SEALED |
| | REVISED PLANS FOR THESE CHANGES. FBC 107.2.1 |
| | |
| | 4) OK |
| | |
| | 5) NOT COMPLIED. THE FLOOR TRUSS LAYOUT PLAN HAS A |
| | HANGER SCHEDULE THAT SPECIFIES THE HANGERS FOR THE |
| | GARAGE STORAGE. THE ENGINEER WILL NEED TO TAKE |
| | RESPONSIBILTY BY SIGNING AND SEALING THE DRAWINGS. FAC |
| | 61G15-23.003. |
| | |
| | 6) OK |
| | |
| | |
| | |
| | |
| | |