| Plan Review Notes For Permit 18070812 |
| Permit Number |
18070812 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2018-07-30 19:40:41 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE VALUATION OF THE POOL ON THE APPLICATION APPEARS | | | TO BE LOW. SUBMIT A COPY OF THE SIGNED CONTRACT TO | | | VERIFY THE VALUATION. FBC 109.3 BUILDING PERMIT | | | VALUATION. FOR PERMITTING PURPOSES, VALUATION OF | | | BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE | | | TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, | | | INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND | | | DESIGN FEES, MARKETING COSTS, OVERHEAD AND PROFIT; | | | EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY | | | INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL | | | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, | | | MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE | | | CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET | | | BY THE BUILDING OFFICIAL. | | | | | | 2) AN APPLICATION FOR THE POOL ELECTRICAL SUB-PERMIT IS | | | REQUIRED TO BE SUBMITTED BEFORE THE POOL PERMIT CAN BE | | | ISSUED. | | | | | | 3) NOTE: FBC-R4501.19 FINAL INSPECTION. FINAL | | | ELECTRICAL AND BARRIER CODE INSPECTION SHALL BE | | | COMPLETED PRIOR TO FILLING THE POOL WITH WATER. |
|