| Date |
Text |
| 2018-07-31 12:38:34 | 1) SUBMIT DOCUMENTATION AS TO HOW THE STORM DRAINAGE |
| | WAS SIZED. THE SYSTEM SHALL BE SIZED IN ACCORDANCE WITH |
| | THE 2017 FBC-PLUMBING SECS.1105.2, 1106.1, 1106.2, |
| | 1106.3. |
| | 2) SHT. A8.0.1 - DETAIL #1 - THE WATER CLOSET SHALL BE |
| | LOCATED IN ACCORDANCE WITH THE 2017 FBC- ACCESSIBILITY |
| | SEC.604.2. |
| | 3) THE REAR GRAB BAR SHALL BE LOCATED IN ACCORDANCE |
| | WITH 2017 FBC- ACCESS. SEC.604.5.2. |
| | 4) SHOW THE CLEAR INSIDE LENGTH AND WIDTH DIMENSIONS OF |
| | THE TOILET ROOM ON SHT. A8.0.1. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 5) SHOW THE REQUIRED CLEAR FLOOR SPACE FOR THE WATER |
| | CLOSET AND THE LAVATORY. COMPLY WITH 2017 FBC-ACCESS. |
| | SECS. 604.3, 606.2. |
| | 6) SHOW THE REQUIRED KNEE AND TOE CLEARANCES FFOR THE |
| | LAVATORY PER THE 2017 FBC-ACCESS. SEC. 306. |
| | 7) SHT. A8.0.1 - THE LOCATION OF THE MIRROR SHALL |
| | COMPLY WITH 2017 FBC-SEC.603.3. |
| | 8) SHOW THE LOCATION OF THE BABAY CHANGING STATION ON |
| | THE FLOOR PLAN. |
| | 9) THE DOOR FOR THE TOILET ROOM APPEARS TO SWING INTO |
| | THE CLEAR FLOOR SPACE FOR THE LAVATORY. COMPLY WITH |
| | 2017 FBC-ACCESS. SEC.603.2.3. |
| | 10) SHT. P0.1 - THE ISOMETRIC OF THE ROOF DRAINAGE |
| | SYSTEM DOES NOT CORRELATE WITH THE PLAN VIEW ON SHT. |
| | P2.2. CLARIFY. |
| | 11) A BACKFLOW PREVENTION DEVICE IS REQUIRED ON THE |
| | DOMESTIC WATER AND THE IRRIGATION SYSTEM FOR THIS |
| | STRUCTURE PER THE CITY OF WPB UTILITIES DEPT. CROSS |
| | CONNECTION CONTROL MANUAL. |
| | 12) A SEPARATE PLUMBING PERMIT WILL BE REQUIRED FOR THE |
| | BACKFLOW DEVICES. |
| | 13) SUBMIT A DETAIL FOR THE TERMINATION OF THE |
| | CONDENSATE DRAIN. THE PLAN STATES THEY DISCHARGE TO A |
| | GREEN AREA.WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |