| Date |
Text |
| 2018-07-23 17:31:46 | 07/23/2018 1ST PLUMBING/POOL REVIEW **DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. |
| | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| | CALCULATIONS. |
| | 2. INDICATE ON THE POOL PUMP SPECS WHICH PUMP IS BEING |
| | INSTALLED. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 3. SUBMIT TWO COPIES OF THE MANUFACTURER'S SPEC FOR THE |
| | FILTER. |
| | 4. PLEASE PROVIDE SPECIFICATIONS FOR HEAT PUMP, |
| | SWIMMING POOL WATER HEATING EQUIPMENT SHALL CONFORM TO |
| | THE DESIGN, CONSTRUCTION, AND INSTALLATION REQUIREMENTS |
| | IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES AND |
| | SHALL BEAR THE LABEL OF A RECOGNIZED TESTING AGENCY, |
| | 2017 FBC R4501.14 WATER HEATING EQUIPMENT. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |