| Plan Review Notes For Permit 18070030 |
| Permit Number |
18070030 |
|
| Review Stop |
M |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2018-11-13 09:49:42 | MECHANICAL PROVISOS. | | | 11/13/28 | | | | | | 1) PRESSURE TESTS FOR CHILLED WATER AND STEAM PIPING | | | REQUIRED. REQUIRED TEST PRESSURES SHALL BE PROVIDED BY | | | THE DISTILLERY SYSTEM MANUFACTURER AND THE ENGINEER OF | | | RECORD. | | | | | | 2) PROVIDE A LETTER FROM THE DISTILLERY SYSTEM | | | MANUFACTURER (CORSON) CERTIFYING THE EQUIPMENT- STILLS, | | | TANKS, PROCESS PIPINGS ETC.- ARE INSTALLED AND | | | FUNCTIONING IN ACCORDANCE WITH THE MANUFACTURER'S | | | GUIDELINES AND SPECIFICATIONS. THE LETTER SHALL BEAR | | | THE APPROVAL STAMPS OF THE ENGINEER AND ARCHITECT OF | | | RECORD. | | | | | | 3) SITE SPECIFIC WIND LOAD ENGINEERING FOR INSTALLATION | | | OF THE GLYCOL CHILLER AND OUTDOOR BOILER AND ASSOCIATED | | | EQUIPMENT SHALL BE SUBMITTED PRIOR TO INSPECTION. | | | | | | 4) A REVISED AC DUCT LAYOUT PLAN SHALL BE SUBMITTED FOR | | | ALL REQUIRED ALTERATIONS MADE TO THE EXISTING SYSTEMS. | | | | | | 5) THE RUM DISTILLERY PROCESS AND RUM STORAGE SHALL BE | | | IN ACCORDANCE WITH HAZARDOUS LIQUID GUIDELINES- | | | SECTIONS 307.1.2 & 414 FLORIDA BUILDING CODE SIXTH | | | EDITION- 2017, AND NFPA 30-2018. PLEASE NOTE THAT A | | | REVISION TO THE APPROVED MECHANICAL PLANS MAY BE | | | REQUIRED BASED ON ANY REQUIRED CHANGES TO THE | | | ARCHITECTURAL PLANS. | | | | | | 6) MANUFACTURER'S SPECIFICATIONS AND INSTALLATION | | | INSTRUCTIONS FOR THE CHILLER, BOILER, AND THE CORSON | | | DISTILLERY SYSTEM SHALL BE ONSITE AT TIME OF | | | INSPECTION. |
|