| Date |
Text |
| 2018-08-13 09:27:31 | ****CORRECTIONS**** |
| | W.P.B. PERMIT: 18061479 |
| | REVIEWED: AUGUST 13, 2018 |
| | |
| | DYLAN BATTLES |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6718 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | 1. [FBC ENERGY R401.2]PROVIDE ENERGY CALCULATIONS TO |
| | MEET REQUIREMENTS IN R401.2 RESIDENTIAL ENERGY CODE. |
| | CHOOSE METHOD IN R401.2 AND SUPPLY DOCUMENTATION. |
| | PROVIDE FOR THERMAL ENVELOPE INCLUDING FLOOR SPACE. |
| | |
| | 2. [FBC R408.1]PROVIDE VENTING CALCULATIONS FOR UNDER |
| | FLOOR SPACE, OR FOLLOW REQUIREMENTS FOR UNVENTED. |
| | |
| | 3. [FBC R806]SUPPLY VENTING CALCULATIONS FOR THE ATTIC |
| | AND HOW THE AREA OF VENTING WILL BE ACHIEVED, OR FOLLOW |
| | R805.5 FOR UNVENTED. |
| | |
| | 4. [FBC R318]ARE EXISTING SLABS AND EXISTING 2X8 FLOOR |
| | JOISTS GOING TO STAY IN PLACE? HOW WILL TERMITE |
| | TREATMENT BE PROVIDED FOR THE ADDITION? |
| | |
| | 5. [FBC EXISTING 1103]PROVIDE ENGINEERING TO SHOW THAT |
| | EXISTING WALL CAN SUPPORT NEW ROOF TRUSSES. |
| | |
| | 6. SHEET A1.2 FIXED WINDOW IN PLAN SAYS 16? H X 72? W. |
| | THE SCHEDULE SAYS 12? X 72? AND THE MARK SAYS 1 WHILE |
| | THE PLAN SAYS 2. PLEASE UPDATE TO MATCH AND PROVIDE |
| | PRESSURE FOR THIS OPENING ON A2.1. |
| | |
| | 7. [FBC 107.3.4.1]DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL FOR |
| | REVIEW, AND THEN FORWARED TO THE BUILDING OFFICIAL |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE |
| | INSTALLED UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN APPROVED BY THE BUILDING OFFICIAL. |
| | A. PROVIDE PRODUCT APPROVALS FOR WINDOWS, WINDOW MULL, |
| | DOORS, TRANSOMS, SLIDERS AND SOLAR TUBES, OR INDICATE |
| | THAT YOU WOULD LIKE THEM DEFFERED. |
| | |
| | B. [FBC 107.2.1.2]PROVIDE PRODUCT APPROVALS FOR |
| | ROOFING, OR INDICATE THAT YOU WOULD LIKE THEM DEFFERED. |
| | (SEE ROOFING REVIEW FOR ADDITIONAL ROOFING COMMENTS) |
| | |
| | C. [FBC 107.3.4.1]SUBMIT TRUSS SHOP DRAWINGS, OR |
| | INDICATE THAT THE SUBMITTAL WILL BE DEFERRED. |
| | |
| | NOTE: |
| | -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW |
| | EACH COMMENT IS BEING ADDRESSED. |
| | -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW |
| | OF MATERIALS REQUESTED. |
| | -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS |
| | OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS) |
| | SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT |
| | DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER |
| | SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID" |
| | OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS |
| | APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE |
| | NEED "VOID", RENDERING THEM NOT USABLE. |
| | |