| Date |
Text |
| 2018-08-07 16:04:25 | 08/07/2018 1ST PLUMBING REVIEW **DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. ON P-02 ON YOUR ISOMETRIC DRAWING THE WASHING |
| | MACHINE DRAIN CANNOT COME OFF THE LAV ARM INTO A DOUBLE |
| | SANITARY TEE 2017 FBC R3005.1.1 HORIZONTAL TO VERTICAL |
| | (MULTIPLE CONNECTION FITTINGS), IT MAY COME OFF THE |
| | TRUNK LINE DOWNSTREAM FROM BATHROOM GROUP IN MOST |
| | WASHING MACHINE IT MAY REQUIRE A 3? DRAIN PER |
| | MANUFACTURES SPECIFICATION. |
| | 2. WASHING MACHINE VALVES MUST BE ACCESSIBLE FOR |
| | SHUTTING OFF WITHOUT MOVING UNITS, 2017 FBC SEC |
| | R2903.9.3 FIXTURE VALVES AND ACCESS. ACCESSIBLE, |
| | SIGNIFIES ACCESS THAT REQUIRES THE REMOVAL OF AN ACCESS |
| | PANEL OR SIMILAR REMOVABLE OBSTRUCTION. |
| | 3. ROMAN TUB STANDALONE REQUIRED A CONTROL VALVE BY A |
| | WATER TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| | 1070 OR CSA B125.3, EXCEPT WHERE SUCH PROTECTION IS |
| | OTHERWISE PROVIDED BY A COMBINATION TUB/SHOWER VALVE IN |
| | ACCORDANCE WITH SECTION P2708.4. FBC R 2713.3 BATHTUB |
| | AND WHIRLPOOL BATHTUB VALVES. |
| | 4. THE ADJOINING WALLS AND FLOOR FRAMING ENCLOSING |
| | ON-SITE BUILT-UP SHOWER RECEPTORS SHALL BE LINED WITH |
| | ONE OF THE FOLLOWING MATERIALS: |
| | PLASTIC LINER MATERIAL THAT COMPLIES WITH ASTM D4068 OR |
| | ASTM D4551. |
| | |
| | THE LINING MATERIAL SHALL EXTEND NOT LESS THAN 2 INCHES |
| | (51 MM) BEYOND OR AROUND THE ROUGH JAMBS AND NOT LESS |
| | THAN 2 INCHES (51 MM) ABOVE FINISHED THRESHOLDS. |
| | SHEET-APPLIED LOAD BEARING, BONDED WATERPROOF MEMBRANES |
| | SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER?S |
| | INSTRUCTIONS. |
| | |
| | NOTE: SHOWER PAN MUST HAVE A SLOPED MORTAR BED THAT IS |
| | PRE-PITCHED BENEATH PRIOR TO LINER INSTALLATION OF 1/4" |
| | IN PER FOOT TOWARD THE DRAIN, MUST HAVE DAM CORNER, |
| | BACKING AROUND THE PERIMETER AND BEFORE FINAL MORTAR |
| | APPLICATION PLACE SOME PEA GRAVEL OVER WEEP HOLES SO |
| | THE MORTAR DOES NOT COVER THEM PER MANUFACTURES |
| | SPECIFICATIONS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |