| 2018-07-14 10:42:40 | ****CORRECTIONS**** |
| | W.P.B. PERMIT: 18061038 (MAIN HOUSE) |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | IMPACT FEES WILL APPLY |
| | |
| | 1. [107.3.5.3.1]PROVIDE "CONSTRUCTION DOCUMENTS" |
| | ELEVATION CERTIFICATE WITH DESIGN FLOOD ELEVATIONS TO |
| | INCLUDE ANY MECHANICAL EQUIPMENT AS APPLICABLE. |
| | |
| | 2. [FBC R322.2.1]THE CITY OF WPB HAS ADOPTED A 2? |
| | FREEBOARD ABOVE B.F.E. SEE AMENDMENT TO FBC R322.2.1 IN |
| | ORD. NO. 4765-18, ? 2, 3-12-2018(SEC 18-33). SEE |
| | COMMENTS REGARDING FLOOD VENTS. |
| | |
| | 3. [FBC R107.2.5]PROVIDE SURVEY OF PROPERTY. |
| | |
| | 4. [FBC R401.4]PROVIDE SOIL REPORT TO SHOW BEARING |
| | CAPACITY. |
| | |
| | 5. [FBC R401.3]PROVIDE SITE DRAINAGE PLAN. THE COVER |
| | SHEETS CALL FOR C-1, C-2 & EC-1. THESE SHEETS ARE NOT |
| | PROVIDED SO I CANNOT REVIEW THE DRAINAGE AT THIS TIME. |
| | PLEASE PROVIDE MISSING SHEETS TO SHOW DRAINAGE PLAN. |
| | |
| | 6. [FBC 107.2.1.2]PROVIDE PRODUCT APPROVALS FOR |
| | WINDOWS, WINDOW MULL, DOORS, TRANSOMS, SLIDERS AND |
| | SOLAR TUBES, OR INDICATE THAT YOU WOULD LIKE THEM |
| | DEFFERED. THE DEFERRED SUBMITTAL DOCUMENTS SHALL BE |
| | APPROVED BY THE BUILDING OFFICIAL PRIOR TO |
| | INSTALLATION. |
| | |
| | 7. [FBC 107.2.1.2]PROVIDE PRODUCT APPROVALS FOR |
| | ROOFING, OR INDICATE THAT YOU WOULD LIKE THEM DEFFERED. |
| | THE DEFERRED SUBMITTAL DOCUMENTS SHALL BE APPROVED BY |
| | THE BUILDING OFFICIAL PRIOR TO INSTALLATION. |
| | |
| | 8. [FBC 107.2.1.2]OTHER DEFFRRED SUBMITTALS INCLUDE |
| | STAIRCASES, GUARD RAILS AND TRUSS PACKAGE. |
| | |
| | 9. [FBC ENERGY R401.2]PROVIDE ENERGY CALCULATIONS TO |
| | MEET REQUIREMENTS IN R401.2 RESIDENTIAL ENERGY CODE. |
| | CHOOSE METHOD IN R401.2 AND SUPPLY DOCUMENTATION. |
| | |
| | 10. NO ENERGY CALCULATIONS PROVIDED, SO I BELIEVE YOU |
| | ARE GOING WITH PRESCIPTIVE. PLEASE FOLLOW ALL |
| | RESIDENTIAL ENEGRY CODE SECTIONS R410-R404 AND INDICATE |
| | ON PLANS HOW YOU ARE MEETING THE CODE. |
| | BELOW ARE SOME, BUT NOT ALL, APPLICABLE ITEMS FOR |
| | REFERENCE. |
| | [R401.3]ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD. |
| | [R402.2.4]ACCESS HATCHES AND DOORS. |
| | [R402.3.2]GLAZED FENESTRATION SHGC |
| | [TABLE R402.1.2]ASSIGN R-VALUES FROM THIS TABLE FOR |
| | MASS WALLS AND FLOOR(GARAGE/STORAGE ABV.) |
| | |
| | 11. [FBC ENERGY TABLE R402.1.2]THE ENERGY CODE REQUIRES |
| | MINIMUM R-30 AT CEILING. |
| | [FBC R302.10]PROVIDE CUT SHEET FOR ICYNENE(SEE ESR-3458 |
| | OR EQUAL) WITH THE TYPE SELECTED TO ESTABLISH THICKNESS |
| | NEEDED TO MEET REQUIRED R-VALUE, FLAME SPREAD INDEX AND |
| | SMOKE DEVELOPED INDEX. |
| | [FBC 2603.4.1.6]PROVIDE IGNITION BARRIER FOR AIR |
| | HANDLERS IN ATTIC SPACE WHERE ICYNENE IS PRESENT. |
| | |
| | 12. [FBC R807]SHOW LOCATION AND SIZE OF ATTIC ACCESS ON |
| | PLANS. |
| | |
| | 13. [FBC R322.2.2]SHOW FLOOD VENT CALCULATIONS FOR |
| | GARAGE. PAGE M1.1 STATES THAT THESE VENTS ARE 12" OFF |
| | THE GROUND. FOLLOW R322.2.2.1 FOR INSTALLATION HEIGHTS |
| | OF FLOOD VENTS. ENGINEERING, CALCULATION, OR PRODUCT |
| | APPROVAL REQUIRED. |
| | |
| | 14. [FBC R312.2]WINDOW FALL PROTECTION. INDICATE ON |
| | PLANS WHERE THIS IS APPLICABLE. IT LOOKS LIKE THE |
| | WINDOWS ABOVE GARAGE S-1/A302 NEED PROTECTION, BUT I |
| | CANT TELL IN THE MAIN HOUSE BEDROOMS. SECTION S-4/A303 |
| | DOESN'T SHOW WINDOW HEIGHT IN BEDROOM. |
| | |
| | 15. [FBC R1001.1]PROVIDE CHIMENY DETAILS TO SHOW |
| | COMPLIANCE WITH CHAPTER 10 FOR RESIDENTIAL CHIMENY |
| | SHOWN ON SOUTH LIVING ROOM WALL. IS THE NORTH CHIMENY |
| | FUNCTIONAL? |
| | |
| | 16. [FBC R803.2.3.1]SHEATHING FASTENING ON 2/S4 CALLS |
| | FOR 10D, BUT SHEATHING NAILS NEED TO BE RING SHANK |
| | RSRS01(2 3/8 X 0.113) |
| | |
| | 17. [FBC 107.2.5]HOW DOES AHU #5 WORK IN THIS OPEN |
| | STAIR AREA? IT APPEARS TO BE IN THE 1ST FLOOR STORAGE |
| | UNDER STAIRS. DUCTS GO OUT FROM THERE, BUT THERE IS NO |
| | ATTIC SPACE IN THE STAIR OPENING. PLEASE UPDATE TO SHOW |
| | HOW AHU #5 WILL FIT IN SPACE PROVIDED. |
| | ALSO, AHU #4 LOOKS LIKE IT IS ON A STAND IN THE 2ND |
| | FLOOR STORAGE. IT SHOWS THAT IT IS A SMALL CLOSET WITH |
| | RETURN ON THE WALL. PLEASE SHOW THIS CLOSET ON OTHER |
| | DRAWINGS FOR SIZING, OR ADJUST AHU #4 ACCORDINGLY TO |
| | HOW IT IS PLACED. |
| | |
| | 18. THIS PERMIT WILL BE ISSUED WITH PROVISO: |
| | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE |
| | IS REQUIRED PRIOR TO CONCRETE POUR |
| | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS |
| | REQUIRED PRIOR TO C.O. |
| | |
| | NOTE: |
| | A RESPONSE LETTER IS HELPFUL TO EXPEDITE PLAN REVIEW. |
| | |
| | WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS |
| | OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS) |
| | SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT |
| | DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER |
| | SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID" |
| | OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS |
| | APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE |
| | NEED "VOID", RENDERING THEM NOT USABLE. |
| | |
| | |
| | |
| | |
| | |