2018-06-21 07:19:0606/21/2018 1ST GAS REVIEW**DENIED**
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) A PRIMARY PLUMBING PERMIT IS REQUIRED WITH THE GAS
 PERMIT AS A SUB AND ALSO YOU WILL NEED A ELECTRIC SUB
 PERMIT FOR THIS INSTALLATION. FBC 105.1
  
 2) PLANS DRAWN IN PENCIL ARE NOT ACCEPTABLE AND ARE
 REQUIRED TO BE OF A PERMANENT SOURCE. FBC 107.3.5
  
 3) WHAT IS THE PIPING THAT IS BEING USED ABOVE GROUND?
 SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC.
 G2413.4.1, G2413.4.2.2. SHOW THE TYPE OF PIPE MATERIAL
 BEING INSTALLED, ALL PIPE SIZES, AND THE CORRESPONDING
 EHD NUMBER OF THE CORRUGATED STAINLESS STEEL TUBING (IF
 APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO FBC
 SEC.107.2.1.
  
 4) TYPE OF GAS (LP OR NATURAL) MUST BE LISTED ON
 PLAN.WPB AMEND. TO FBC SEC. 107.2.1
  
 5) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
  
 6) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017
 FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES.
 SEC. G 2413.4.1, G2413.4.2.
  
 7) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3
 THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3.
  
 8) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1
  
 9) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMEND. TO FBC SEC. 107.2.1.
  
 10) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
  
 11) YOU ARE SHOWING A 2ND PRESSURE REGULATOR AHEAD OF
 THE TANKLESS. PLEASE CLARIFY THE PURPOSE OF THIS 2ND
 DEVICE. FBC 107.2.1
  
 12) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3
  
 13) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC.
 G2421.1.
  
 14) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1
 OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE
 PROPER PIPE SIZE AND BTU LOAD
  
 15) VALUATION: THE VALUE OF THIS TANKLESS WATER HEATER
 INSTALL MUST BE OF ACTUAL COST THE SOMEONE WOULD BACK A
 LICENSED CONTRACTOR TO PERFORM THE PLUMBING, GAS, AND
 ELECTRIAL WORK REQUIRED. YOUR VALUE OF $250.00 WOULD
 NOT COVER THE COST OF THE GAS PIPING MATERIAL. PLEASE
 ADJUST YOUR VALUE. WPB AMEND TO THE FBC 109.3
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved